穩定筋 的英文怎麼說

中文拼音 [wěndìngjīn]
穩定筋 英文
fin
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. Through indoor tests and field tests this paper has researched the geogrid " s characteristics of application in highway engineering, such as characteristic of intension, creep, endure, damnify in construction etc. based on these researches this paper has also researched the working characteristics of contact face between geogrid and soil and the method of geogrid - reinforced slope analysis. mechanism of geogrid - reinforced slope has been analyzed

    文章通過室內、外試驗,對土工格柵的強度特性、蠕變特性、耐久性能及抗施工損傷性能等工程應用特性進行了研究;在此基礎上,結合室內試驗和理論分析對土工格柵與土的界面工作特性和加邊坡的性分析方法進行了研究,對土工格柵加邊坡機理進行了分析;最後結合實體工程,對土工格柵加陡邊坡的施工工藝進行了系統研究。
  2. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼連接改進傳統的電焊連接方式,採用大量採用鋼接頭機械連接技術,有效提高了接頭強度和鋼連接速度,施工安全性大大加強,質量性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  3. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通穿柱法」做承臺梁, 「抗彎抗剪錨法」強化柱加固效果, 「鋼板箍法」做地基梁鋼連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼籠吊裝簡化施工工序;承臺梁施工採用梁主橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  4. As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil

    歸納起來,具體的研究和所獲得的一些重要成果如下: 1 、結合本人的設計專利? 「鋼混凝土網格式加擋墻」及工程實踐,在對加土的加機理、破壞模式、承載力和性等方面進行深入分析的基礎上,提出了一個新概念,即經過加后的土體作為復合結構與原土體相比,不僅提高了內聚力,而且也提高內摩擦角;並在此前提下首次導出拉力破壞和粘著破壞兩種情形下的承載力公式,然後進行了性分析。
  5. At last, according to the comparison and analysis of the model fea results, model experiment data and the { specifications for design of highway reinforced earth engineering } ( jtj015 - 91 ) that is put into practice at present, we suggest that the polymer - geogrid reinforced earth walls in this area, which earthquake intensity is greater than 7 degreefincluding 7 degree ), must be analysed and designed with the earthquake fatalness, must be carried on with the checking computations of the reinforced material ' s intension and stabilization safety factor of the resistance against pull out

    最後,根據有限元計算結果和試驗數據對比現行的《公路加土工程設計規范》 ( jtj015 - 91 ) ,建議地震烈度在7度以上(包括7度)的地區應對加土擋墻結構採取地震危險性分析設計,應對加土擋墻進行材抗震強度和材抗拔安全系數的驗算。
  6. ( 2 ) the lateral deformation is effectively limited by reinforced earth layers and the settlement becomes small. @ the lateral deformation is enlarged on soft foundations, and the settlement becomes large. @ the reinforced earth layers on soft foundations behaves extension. the response behaviors of high sand - gravel embankment are indicated as the following : ? he amplification factor of earthquake acceleration varies with reinforced earth structure. ( 2 ) the basic frequency of the original embankments in different reinforcement conditions is about 0. 76hz. ? the amplitude of dynamic deformation appears small and the dynamic stability is safe

    研究表明:加土體能有效地限制路堤的側向位移發展,減小沉降變形量;軟基路堤的側向位移較大,將顯著地增大路堤的沉降變形;軟基上加土墊層中產生的拉應力最大;加砂礫土路堤在振動荷載作用下動變形反應較小,具有良好地動力性。
  7. According to the special shape and operate requirements of the torpedo, the structure and moulding process of the torpedo shell are established, in which the body and overlay block with grooves are moulded by fiber winding, and close moulding respectively with the adhesive by limited stop compression. in the light of the selection of raw material system, composite system with outstanding performance are defined, based on which the mechanical properties are tested., with the overall consideration of structural characters and design demands, the main factors which may have effects on the strength and stability ( including stiffness section dimension, stiffeners space, skin thickness and skin lay angle ) is optimized one by one for the structure design parameters on the base of the fem model of skin, stiffness and layover block by fem. as a result, the prototype with 1 : 1 proportion and its structure and lay optimization design are completed. the moulding technology for polyurethane foam moulding the stiffened shell is obtai ned in terms of the design, manufacture moulding, experimental mould and tooling

    依據在研產品特殊的外型結構和使用要求,確了該型號水雷復合材料殼體的具體結構形式和復合成型工藝路線,即由纖維纏繞工藝成型主體異形件,閉模成型帶通槽外貼塊,用限位加壓工裝實現粘接的工藝路線;通過對原材料體系的篩選,確了綜合性能較好的復合材料體系,以此為基礎進行了力學性能測試;運用有限元方法,建立了蒙皮、條和外貼塊的分析模型,綜合考慮結構特點和設計要求,對影響結構強度與性的主要因素(包括截面尺寸、間距、蒙皮厚度、蒙皮鋪層角度)分別進行了結構設計參數的優選,最終完成了復合材料異形耐外壓殼體1 : 1樣件和縮比實驗件結構及鋪層優化設計;完成了聚氨酯泡沫胎成型內置加殼體的成型工藝技術研究;對縮比件進行外壓性能測試,並給出了應力、應變測試結果。
  8. The testing results indicate that this kind of members can worked well and resist the shear as the members reinforced with the common stirrup

    試驗結果表明,構件受力性能,與普通箍一樣可以起到抗剪作用。
  9. Strengthen roadbed : it can strengthen roadbed, limit the time of construction and the quantity of sand. besides, it makes the road have a long service life

    固路基作用:加,隔離,路基,加快施工進度,減少砂石用量,防止路面開裂,地基下沉,延長路面壽命。
  10. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護機理:充分利用巖土層自身或預處理的局部的性,隨基坑開挖分層掛鋼網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  11. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡性安全監測措施,主要包括邊坡水平位移觀測及支護結構撓度觀測;沉降觀測;以及錨桿應力監測;助梁鋼應力監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的位移趨勢與發展。
  12. Third, it puts forward the logarithmic spiral failure surface bishop steep reinforced slope limit equilibrium stability analysis method. this method is used to calculate the engineering living example and compared with the calculations of the engineering living example and compared with the calculations of the swedish circle method and proved applicable

    第三,本文針對加陡坡潛在破裂面矢徑隨路堤深度而增加的特點,提出用對數螺旋線作滑動面的畢肖普法進行分析,編制了分析程序,並對工程實例進行了分析計算,將計算結果與瑞典圓弧法分析進行比較。
  13. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑研究;三峽電站進水口型式研究;鋼襯鋼混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑研究;三峽電站進水口型式研究;鋼襯鋼混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. Based on synthesis analyzed cranes drums " strength, stability calculate theory and abundant test, the dissertation also predigest the consider method of rope slot protruding stiffened and present corresponding calculate chart, the dissertation also discussed the drumd " strength and the judgment method of destroy modal of drums " stability and brought forward new drums " design and calculate method. at last, the paper

    在綜合分析起重機捲筒強度、性計算理論並進行大量試驗研究的基礎上,對捲筒設計計算中繩槽凸的考慮方法進行了簡化,給出了相應計算圖表;對捲筒強度、性破壞形式的判斷方法也進行了討論,提出了切合工程實際要求的實用化的捲筒設計計算方法。
  16. The model was used to analyze the stability of reinforced high embankment in beizhang gully area, and the result accorded with the facts, which verified that the effecting factors of the stability of reinforced high embankment can be described more comprehensively by the fuzzy information optimization method and the result is reasonable

    通過對北張溝加高填路堤進行的性分析,表明該模型能較全面地考慮加高路堤邊坡性的影響因素,評價結果合理。
  17. Product function : soft soil subgrade strengthening, reinforced embankment & slope, strengthening separation, bounding deformation of foundation, prevent road from reflection crack, increasing the intensity of subgrade. it can strengthen soft subgrade of kinds of roads and railways ; prevent road from reflection crack ; enhance the strength of subgrade ; reinforcedriverbank, embankment and slope ; homogenize the stress ; adjust settlement ; improve the stability and bearing capacity of the basement ; strengthen road and bridge tops

    產品功能:軟土路基加強,路堤邊坡加,加強隔離,約束地基變形,防止道路反射裂體,提高路基的強度.各種道路、鐵路等軟路基加強,增強路基的強度;河岸、路堤、邊坡起加,均化應力,調整沉降,提高基底和承載力;道路橋臺面的加強。
  18. Corrosion of steel reinforcement is now universally recognised as the major factor affecting the material stability and structural integrity of concrete structures

    摘要鋼腐蝕已被公認為影響混凝土結構的材料性及結構完整性的主要因素。
  19. The results showed that five factors affect food quality : precipitating volume, content of protein content of wet gluten, dough stabilizing time and index of common difference

    通過對小麥粉各項指標與包子的比容和感官評分之間的相關性研究得出,影響包子食用品質的五大麵粉因素分別為沉澱值、蛋白質、濕麵含量、面團時間和公差指數。
  20. Through comparing and analyzing of bearing capacity, development of crack and strain of reinforced, the results show that the load - deflection plots f or specimens from the finite element analysis agree well with the experimental data, and choosing the rightful stress - strain relationship, utilizing ansys program, the test process can be well simulated. at the same time, making used of the program, the traditional shear wall is analyzed. it shows that comparing with the traditional shear wall, the hollow shear wall ' s cracking load drop 16 %, yield load and failure load drop 13 %, stiffness drop 13 % ~ 22 %

    其次在試驗的基礎上,將試驗手段、有限元數值模擬方法和理論分析結合起來,利用有限元程序ansys對其中的兩片墻板進行非線性有限元分析,並對前後的承載性能,裂縫發展、鋼應變進行了比較和分析,結果表明有限元節點模型分析的荷載-位移曲線和試驗測得數據符合良好,選用合理的材料本構模型,利用ansys可以較好的模擬試驗過程;同時利用有限元模型對比分析了普通剪力墻和空心剪力墻,空心剪力墻與普通剪力墻對比,其開裂荷載下降16 ,屈服荷載、極限荷載下降13 ,剛度下降13 22 ,開裂至屈服、屈服至極限荷載階段的剛度衰減規律與普通剪力墻基本一致,空心剪力墻的後期剛度比較
分享友人