站臺地道 的英文怎麼說

中文拼音 [zhàntáidedào]
站臺地道 英文
platform tu el
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  1. Kuantien is easily accessible via provincial highway 1, lungtien railway station or the sun yat - sen freeway, making travel to and from the town hassle - free. local tourist attractions include wushantou reservoir, the national tainan institute for the arts, artifacts from the prehistoric black pottery culture, the lungtien distillery, and the wildlife preserve for the endangered pheasant - tailed jacana. but the most indelible image of a visit is the sight of people rafting through the water caltrop ponds in tungchuang and hsichuang villages

    四通八達的官田鄉有一省鐵路縱貫縣隆田中山高速公路貫穿其間,往返順暢,鄉內更有烏山頭水庫國立南藝術學院黑陶文化遺址隆田酒廠葫蘆埤水雉保護區等聞名的風景區,其中尤以東西莊區的菱香舟影,名列新南瀛勝景之一。
  2. For the remaining eight at - gradeoverhead stations ( tseun wan, kwai hing, kwai fong, ngau tau kok, kowloon bay, kwun tong, heng fa chuen and chai wan ), retrofitting of platform screen doors involves major alterations to the stations and tunnel ventilation, air - conditioning and smoke extract systems. since such at - gradeoverhead stations are not designed with air - conditioning and ventilation systems, retrofitting works are subject to technical constraints

    至於其餘8個現時沒有月幕門的面及高架車(即荃灣、葵興、葵芳、牛頭角、九龍灣、觀塘、杏花?及柴灣) ,加裝月幕門系統須涉及重大工程,包括車及隧通風系統、冷氣系統及抽風系統等的大型修改工程。
  3. " oh, i don t know whether i can get up and say it off here, " she said bashfully

    「嗯,我不知我能不能在這里說詞, 」她扭扭怩怩說。
  4. Based on a typical station in guangzhou metro line 5, in which the station hail floor and the platform floor are separated, the relationship between the building layout of metro station and the environmental conditions of station site, and some problems such as the indeterminacy, multiplicity and flexibility of the building layout are emphasized

    摘要通過分析廣州軌交通5號線廳、層分離的典型車,著重論述鐵車建築布置形式與址環境條件之間的相互關系,以及建築布置形式的不確定性、多樣性和靈活性問題。
  5. Cancelled kr41 beacon heights - somerset road, kowloon tong kr42 beacon heights - wai chi street, shek kip mei hr36 ap lei chau san shi street - causeway bay pak sha road refer to gmb 36x hr41 pok fu lam gardens - wan chai cancelled hr42 baguio villas lower - edinburgh place hr43 baguio villas upper - edinburgh place hr44 no. 57 - 61 south bay road - repulse bay hr45 hk parkview - edinburgh place hr46 hong kong parkview - wan chai hr48 repulse bay - central circular hr49 robinson heights - central circular hr50 no. 57 - 61 south bay road - edinburgh place hr51 beverly hill - causeway bay circular hr53 pacific view - edinburgh place hr54 dynasty court - edinburgh place hr55 dynasty court - wan chai circular hr56 grand panorama - central circular hr57 redhill peninsula - stanley hr58 redhill peninsula - shau kei wan mtr station hr59 redhill peninsula - central hr60 repulse bay road - causeway bay hr61 conduit road skyview cliff - central hr62 conduit road realty gardens - central admiralty hr63 a kung ngam village - shau kei wan mtr station circular hr64 conduit road imperial court - admiralty tamar street hr65 seymore road goldwin heights - central queen s pier hr66 tregunter path branksome - central connaught place circular hr67 old peak road hillsborough court - central queen s pier hr68 garden terrace - admiralty mtr station drake street hr69 magazine gap road harbourview - admiralty tamar street circular hr70 kennedy road bamboo grove - central ice house street circular hr71 old peak road tregunter - central queen s pier circular hr72 old peak road tregunter - admiralty tamar street circular hr73 conduit road pearl garden - admiralty circular hr74 no. 150 kennedy road - central queen s pier hr75 pokfield road university heights - sheung wan shun tak centre circular hr76 may road the mayfair - admiralty drake street circular hr77 may road clovelly court - central queen s pier circular

    (已取消) hr42下碧瑤灣- -愛丁堡廣場hr43上碧瑤灣- -愛丁堡廣場hr44南灣57 - 61號- -淺水灣hr45陽明山莊- -愛丁堡廣場hr46陽明山莊- -灣仔hr48淺水灣- -中環(循環線) hr49樂信- -中環(循環線) hr50南灣57 - 61號- -愛丁堡廣場hr51比華利山- -銅鑼灣(循環線) hr53浪琴園- -愛丁堡廣場hr54帝景園- -愛丁堡廣場hr55帝景園- -灣仔(循環線) hr56嘉兆- -中環(循環線) hr57紅山半島- -赤柱hr58紅山半島- -筲箕灣hr59紅山半島- -中環hr60淺水灣- -銅鑼灣hr61干德(華庭閣) - -中環hr62干德(聯邦花園) - -中環/金鐘hr63亞公巖村- -筲箕灣(循環線) hr64干德(帝豪閣) - -金鐘(添馬街) hr65西摩(高雲) - -中環(皇后碼頭) hr66利根德里(蘭心閣) - -中環(康樂商場) (循環線) hr67舊山頂(曉峰閣) - -中環(皇后碼頭) hr68舊山頂(花園) - -金鐘(德立街) hr69馬己仙峽(港景別墅) - -金鐘(添馬街) (循環線) hr70堅尼(竹林苑) - -中環(雪廠街) (循環線) hr71舊山頂利根德閣) - -中環(皇后碼頭) (循環線) hr72舊山頂利根德閣) - -金鐘(添馬街) (循環線) hr73干德(明珠) - -金鐘(循環線) hr74堅尼150號- -中環(皇后碼頭) hr75蒲飛路(翰林軒) - -上環(信德中心) (循環線) hr76梅一號- -金鐘(德立街) (循環線) hr77梅(嘉富麗苑) - -中環(皇后碼頭) (循環線)
  6. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建的規模、使用功能及質條件,提出了兩連拱結構島式、三條平行隧島式、三連拱結構島式和側式以及四條平行隧島式和側式方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車結構的開挖施作過程進行了模擬分析。
  7. Due to its flexibility, the lrt system can be designed to match both the physical environment and transport demands as well as to provide an alternative choice with quality service. all these factors have contributed to the phasing - out of the old streetcar systems. beginning in the mid - 1970s, light rail transit systems have enjoyed a period of sustained growth, not only providing public transportation but also contributing to the renewal of declining city districts, reutilizing unused rail lines, and providing impetus to local economic development

    使得有軌電車自1970年代中期,以輕軌運輸的新風貌漸漸復興,不僅擔負公共運輸功能,更常結合老市區都市更新、舊鐵再利用、促進經濟再發展的聯合開發計畫,吸引民間投資參與建設,透過由街面進出的低月、無欄柵式收費制度、造型流線超低底盤車輛、軌沿線綠化設施等設計,在都市環境改善與都市永續經營上,充分發揮凈化、綠化、人性化、標化等效益,發展至今估計全世界輕軌運輸系統路網數目已達約400個左右。
  8. We want to see trams along p2, pedestrian crossings at grade at both northern corners of tamar, and street level visual corridors into the city and to the harbour. the mtr island northern line with stations at tamar and hkcec should be publicly confirmed at an early date. " christine loh said in order for the area to attract resident and visitors, the design briefs for the tamar site, including central government offices, legco buildings and public space, need to be drastically altered

    小組表示:我們不希望看見添馬艦用變成平,公眾用必須要拆細發展,讓市民及遊客可隨時享用這些方,能夠創造不論晝夜或假期都可使用的空間設施是十分重要的, p2路網亦需要作出改變,我們希望電車能夠支援這個p2路網,行人由添馬艦的北面起,通過長廊直達中區及海傍,亦希望鐵港島北支線可盡快落實,並於添馬艦及香港會議展覽中心設
  9. Chun yeung street area including north point road, tong shui road, a section of king s road around kam hong street, and fortress hill mtr exits

    春秧街一帶,包括北角糖水琴行街附近的一段英皇,以及炮出口
  10. The nil alignment is dictated by the airport railway extended overrun tunnel to the west, the water channel of the hong kong convention and exhibition centre hkcec the foundations of which were specifically designed for this purpose and the existing fortress hill station to the east

    鐵北港島線的定線受到多項限制,包括西部必須連接機場鐵路掉頭隧伸延段,香港會議展覽中心會展的水基是特別為此而設計,而東部則必須連接現有的炮
  11. The special district is located in the " special district project of wangtien highway interchange " and belongs to wujih township of taichung county

    本車區位於高速公路王田交流特定區計畫范圍內,行政區域全屬于中縣烏日鄉。
  12. Kings road in between kam hong street and fortress hill mtr

    介乎琴行街與炮的一段英皇
  13. Routes 1 to happy valley ( upper ) 6 to stanley prison 6a to stanley fort 6x to stanley prison 11 to jardine s lookout 61 to repulse bay 260 to stanley prison - admiralty mtr, queensway

    路線1往跑馬(上) 6往赤柱監獄6a往赤柱炮6x往赤柱監獄11往渣甸山61往淺水灣260往赤柱監獄-金鐘,金鐘
  14. Cross the narrow part of ice house street, then cross queen s road central at the lights. take battery path immediately on the left and walk to the end

    鐵中環廣場出口,沿雪廠街走至皇后大中及炮里,沿炮里步行即至。
  15. Abstract : some economic policies effecting hydropower exploitation in chinaare discussed and six suggestions are proposed accordingly : decreasing taxes on power project ; establishing reasonable formation mechanism of grid electric energe price ; establishing reasonable sharing mechanism of hydropower investment ; clearly defining recovery route for transmission engineering investment ; establishing sharing policy for regulating benefits of hydropower plant ; establishing foundation for hydropower investment

    文摘:論述了影響我國水電開發的一些經濟政策,並且有針對性提出了六條建議:減輕電力項目稅賦;建立合理的上網電價形成機制;建立合理的水電投資分攤機制;明確輸電工程投資回收渠;出水電調節效益分配辦法;建立水電投資基金
  16. But the strip of tarmac between the pit wall and the garages is more than just a stage for the visiting stars : races are won - and sometimes lost - in the pit lane

    但是維修護墻同車庫之間的停車帶不僅僅是那些觀光明星們的舞,有時在維修中就能夠決定出比賽的勝負。
  17. After acquiring the land for the hsr tainan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, common duct, water engineering and piping

    高鐵南車特定區區段徵收公共工程施工項目包括:整工程路工程雨水下水工程公共照明工程交通設施工程停車場工程污水下水工程共同管工程自來水工程及相關管線埋設工程等。
  18. Luoyang station sought assistance from the local pla forces and armed police forces to clean up the station square and platforms so as to ensure passenger safety

    洛陽及時邀請當駐軍、武警官兵與車幹部職工一,全面清除前廣場及積雪,確保旅客順利出行。
  19. After acquiring the land for the hsr taichung station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵中車區區段徵收公共工程施工項目包括:整工程路工程排水工程自來水工程污水工程公共照明工作及傳統管線埋設工程橋梁工程等。
  20. These measures mainly consist of guiding and encouraging the taxi whose service lifetime already expired in whole city to be upgraded to the single fuel or double fuel natural gas auto ; guiding and encouraging the diesel oil bus of medium and short distance to be refitted for the single fuel diesel oil natural gas bus ; guiding and encouraging the sanitation vehicle, municipal vehicle to be refitted for the natural gas vehicle ; taking measures to accelerate the construction of natural gas station further, forming the rational natural gas station network distribution between the inner - city, main city zone and district, city along with the country as well as the adjacent province and city

    被稱為「千里眼」的電子牌當車通過顯示屏時,乘客可以清晰看到走在最前面那趟車正逐步向自己所處的這個靠近。車離還有多遠,何時會到,一目了然。之所以在人民路上試點「千里眼」 ,專業人士解釋因為人民路有公交專用車,只有這樣的城市路才有條件安裝「千里眼」 。
分享友人