端卸的 的英文怎麼說

中文拼音 [duānxiède]
端卸的 英文
end dumping
  • : Ⅰ名詞1 (東西的頭) end; extremity 2 (事情的開頭) beginning 3 (門類; 方面) item; point 4 (原...
  • : 動詞1 (從運輸工具上搬下來) remove cargo or freight; unload; discharge; unlade 2 (把加在人或牲...
  • : 4次方是 The fourth power of 2 is direction
  1. Mobile front-bucket loaders often suffice for handling and retrieving rock in a-frame structures.

    對于A形結構用活動斗式裝機處理和運送石塊。
  2. Railway transport equipment. weight - saving equipment. pipework. removable pipe and nose couplings with toric bearing surface sleeves and tail ends

    鐵路運輸設備.減重設備.管道系統.帶復曲支承面套筒和尾可拆管和前聯結器
  3. Railway transport equipment. weight - saving equipment. pipework. 3 - piece removable pipe and nose couplings with toric bearing surface sleeves and tail ends

    鐵路運輸設備.減重設備.管道系統.帶復曲支承面套筒和尾三件組合式可拆管和前聯結器
  4. ( 2 ) according to the forming model of the deep pull cracks, they can be divided into three classes pulled cracks -, pressed cracks and sheared cracks. ( 3 ) based on the two - dimensional and three - dimensional finite element methods. the following results can be affirmed : in the slope excavating process, the base surface will rebound in the direction of the excavating surface ' s excerior normal. the maximal displacements of the left and right bank are + 3. 6cm and + 2. 4cm ; the arch abutment will rebound in the direction of the river valley, the maximal displacements of the two bank are + 3. 5cm and + 2. 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction. the maximal displacements are + 2. 1cm and + 1. 7cm. ( 4 ) the natural slope is stable

    ( 3 )通過二維及三維有限元分析得知,左右岸拱肩槽邊坡在開挖過程中,開挖底面主要表現為朝開挖面外法線方向發生回彈,左右岸最大位移量分別為+ 3 . 6cm 、 + 2 . 4cm ;拱面主要表現為向河谷方向發生側向回彈,左右岸最大位移量分別為+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表現為向臨空方向回彈,左右岸最大位移量分別為+ 2 . 1cm 、 + 1 . 7cm ;開挖使巖體產生由荷回彈導致傾倒拉裂現象。
  5. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa載荷下筒體一封頭連接結構處集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多反復加、載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全; m在本文彈塑性有限元模擬計算中,對于裂紋尖進行力學分析時,不考慮壓力容器製造過程中水壓試驗影響,將導致計算結果出現較大偏差; ( 4 )筒體完全屈服時載荷為92石3mpa ,封頭完全屈服時載荷為86
  6. Mobile front - bucket loaders often suffice for handling and retrieving rock in a - frame structures

    對于a形結構用活動斗式裝機處理和運送石塊。
  7. An additional check can be made by removing the enclosure cover and momentarily placing a jumper ( or 20, 000 ohm resistor ) across terminals 9 - 10 on the control

    通過拆外殼蓋板,並立即將跨接線(或20 , 000歐姆電阻)並聯在控制裝置接線子9 - 10上,能夠再次進行測試。
  8. Remove the two check modules by pressing firmly from the outlet end ( end with wrench pads ). o - ring seals will be removed with the removal of modules from the body

    從出口(帶有板鉗基座埠)穩穩地壓下,拆兩個止回模塊。 o形環密封將隨著模塊從閥體上拆下來。
  9. After the machine stops, open its cover, loosen the lock blocks on lip ring, suspend the lip ring together with the filter bag containing cake to the place for discharging, then have the bottom of the filter bag splay, thus the cake being discharged automatically

    在離心力作用下,液相物穿過濾布和轉鼓壁濾孔排出轉鼓,經排液管排出機外,固相物截留在轉鼓內,停機后啟開機蓋,松開攔液板鎖緊塊,將攔液板連同裝有濾渣濾袋一併吊往料處,使濾袋底落下張開,濾渣自動排出。
  10. Through the experimentation for the physical performance of cfpb masonry under local compression, the author has observed the deformation and failure of cfpbm. based on the mathematical statistics and regression analysis of the experimental data, the author derived a feasible and common formula for counting the cfpbm ' s local compression strength regarding the different local compression locations, analyzed stress distribution of local bearing masonry under beams end, and provided the calculating formula on effective supporting length of beam end in brick masonry. as the results of experiments demonstrate, owing to the cfpb ' s own holes " system, the beneficial effects, the bounding effect of surrounding masonry and the spread effect of force, have not developed completely

    試驗結果分析表明:由於多孔磚自身孔洞結構,砌體內部圍箍作用和力擴散作用未得到充分發揮,局壓強度雖較軸心受壓強度有所提高,但仍低於同情況下實心磚局壓強度;當有上部荷載作用時,對砌體局壓有利懸臂荷作用和內拱荷作用均不明顯,因此在推導梁局壓強度計算公式時,未考慮此可能存在有利影響,計算偏安全;局壓強度提高系數公式除採用規范公式(二項式)表達式,還用對數式進行了回歸推導,得到了一個較為普遍公式;論文還對梁局壓有效支承長度計算公式進行了回歸推導。
  11. Simply remove hose coupling and lightly pull knurled tip of stem at outlet of valve to allow drainage of collected water

    只需簡單地拆軟管連接並輕輕拉法門出口處閥桿有刻紋,使殘留水排放出來。
  12. Secondly after damage model of structure is analyzed and considering of rigid degradation in crossing section of structure, the damage index is defined by rotation rigid of element side and the model of damage of crossing section is developed. meantime, the damage model of structure is built by idea that damage index of elements endowed weight are added linearly

    其次,在對現有結構損傷模型分析之後,考慮到構件截面恢復力模型中載剛度退化現象,作者基於構件部截面轉動剛度定義了構件損傷指標,建立了構件層次上損傷模型。同時考慮到結構損傷前後固有頻率變化,運用線性加權求和思想建立了結構層次上損傷模型。
  13. It is found that cyclic loading at high differential stress level will lead to the decrease of felicity ratio, and the value max can be decreased by some crack systems in specimen. there is still a lot of ae during unloading at high differential stress level, which implies that the deformation is dominated by fracturing at low differential stress level, and the deformation by frictional sliding increases greatly at high differential stress level

    關于應力方式對巖石破裂影響,發現較高差應力水平下多次循環加載會使felicity比減小;某些構造能使巖石產生felicity效應應力門檻值_ ( max )降低;由高差應力水平下載時仍有大量聲發射產生推測:在低差應力水平下,破裂以裂紋尖突然擴展為主;在高差應力水平下,沿已有裂紋面滑動破裂大量增加。
  14. Remove stem nuts ( 22 ). keep stem from turning by inserting screw driver in slot on end of stem

    閥桿螺母( 22 ) 。通過在閥桿末槽內插入螺絲刀來避免閥桿旋轉。
  15. Qqct is equipped with 24 super postpanamax quay cranes of max. 70 tons / 70 meters and 77 rubber tyred gantry cranes and operated with the most advanced terminal management system navis sparcs / tms connected with radio data terminals for the most efficient and real time terminal management

    技術優勢:現配備24臺最大負荷70噸/外伸距70米超巴拿馬型集裝箱裝橋吊、 77臺輪胎吊,與國際先進碼頭生產管理系統sparcs / tms和無線數據終相連接,實現準確、高效、實時計劃管理,提供方便快捷客戶信息查詢。
  16. At present some offloading chips have played an important role in network storage and high - grade servers

    目前部分協議載晶元已經在存儲網路和高服務器中發揮著極為重要作用。
  17. After the valve has been set to the correct balance point, record the setting. without turning the handwheel, remove the retaining bolt from the end of the handwheel

    在正確設置閥門平衡點后,記錄下設置值。不需要旋轉手輪,直接從手輪末固定螺栓。
  18. The steel structure of the national stadium the main venue for the 2008 beijing olympic games stood on its own yesterday after the last jack pad was removed

    9月17日上午11時,隨著建築工人在「鳥巢」取下了最後一塊鋼墊塊,歷時4天國家體育場鋼結構載順利完成。
  19. Hand crimping tools - tools for the crimp termination of electric cables and wires for low frequency and radio frequency applications - particular requirements - radio frequency connectors and concentric contacts - open throat tools with removable and interchangeable dies, sizes a to g, q to t, v and w

    手工壓接工具.低頻和射頻用電纜和電線終壓接工具.特殊要求.射頻連接器和同軸接觸點手工壓接工具.有可拆和可互換模開式工具規范,規格a - g q - t v和w
  20. This paper adopts 32 channels analogy collecting card ( pcl - 813 ) to acquire container crane parameters, and makes use of ado and graph technologies of visual c + + to realize data store and display on the central computer. the web page design on the web server is realized through the asp technique

    在實現該系統時,採用32路模擬量採集卡pcl - 813獲取裝橋參數,利用visualc + +中ado技術和圖形技術實現中心站微機數據存儲與顯示, web服務器網頁程序設計則是利用asp技術實現。
分享友人