端點樁 的英文怎麼說

中文拼音 [duāndiǎnzhuāng]
端點樁 英文
end peg
  • : Ⅰ名詞1 (東西的頭) end; extremity 2 (事情的開頭) beginning 3 (門類; 方面) item; point 4 (原...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 端點 : extreme point; [數學] end point; extremity; terminal; end端點檢測器 end point detector; 端點控制 ...
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用基設計規范中的難? ?巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優
  2. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積承力q _ b的計算方法,並考慮擴底的「拱效應」特引入了有效長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中側土摩阻力和反力各自所承擔的比例;本文還在總結各國挖孔擴底應用情況的基礎上就擴底的構造進行了詳細的歸納。
  3. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌混凝土成技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成速度較快,工期短、工效高;與復合地基成時的泥漿護壁成孔工藝、振沖工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優;另外,壓入鉆桿內的混凝土為泵送免振混凝土,因此體質量易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋鉆孔壓灌混凝土成的側阻和阻都有相應的提高,的承載性能較好,復合地基的變形較小。
  4. At first, based on the results of field pile tests, conclusions are made that the resistance of expanded branches or plates behaves mainly as end - bearing force, and this new type of pile can be classified as multi - end - bearing piles with friction

    首先,通過現場試驗結果,深入分析了擠擴支盤的荷載傳遞機理,指出擠擴支盤的支盤阻力主要體現承力的性質,並將擠擴支盤定性為摩擦多支
  5. Today, cast - in - situ piles are more widely used in deep foundation engineering because of their many advantages, such as better adaptability to various ground condition, providing enormous bearing capacity by a single pile and smaller dosage of reinforcing steel bar. but, their own disadvantages, such as sediment under tip, clay slurry around pile, friction and tip resistance disagreement and initial ground stress freeing, limited their bearing capacity, lowered the utilization ratio of material and increased the settlement

    灌注,因其對地層適應性強、能提供較大的單承載力、鋼筋用量少等優,在目前深基礎工程中得到了極為廣泛的應用。但是,灌注的固有缺陷,諸如孔底虛土;孔壁泥漿;阻、側阻發揮不同步;鉆孔后原地應力釋放等,限制了其承載力的發揮,使得材料利用率不高,沉降較大。
  6. In this paper, combined with the research project " study on the design, construction and quality monitoring of foundations in karst and mined - out regions along tanshao highway " financed by the department of communication of hunan province, a deep analysis has been made to find out the factors influencing the safe thickness of bearing stratum under the pile tip in karst region. three simplified models are set up to calculate the safe thickness, from which empirical calculation formulas are deduced. and a few important conclusions drawn from the discussion can be used to guide engineering practice, which are also valuable materials for the revision of current criterions later

    本文結合湖南省交通廳「潭邵高速公路巖溶及采空區路、橋基礎設計施工與質量監控方法研究」研究課題,以潭邵高速公路為工程依託,通過深入分析巖溶區基持力層安全厚度的影響因素,提出了持力層安全厚度計算的三類簡化模型,以此為基礎,推導出了持力層厚度計算公式,並通過討論得到了可用於指導工程實踐的幾重要結論,可供今後規范的修改參考;本文針對巖溶地區的特殊情況,提出了巖溶區基設計方法及具體設計步驟,並借鑒國內外巖溶區基的成功經驗,提出了巖溶區基設計處理幾種特殊方法,可供同類工程借鑒;另外,本文通過具體的工程實踐,系統總結了巖溶區基施工技術及常遇問題的處理方法。
  7. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔基礎的發展歷程及研究現狀,重討論了填石壓漿混凝土空心、預制預應力混凝土空心的成工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心基礎的質量檢測方法及標準;並在此基礎上,深入分析了側、承載能力,提出了填石壓漿混凝土空心的設計計算理論和方法。最後,論證了空心新工藝的可行性、適應性、經濟性,為大力推廣應用空心新技術提供了可靠的技術資料。
  8. The 16 - node degenerated iso - parametric element is proposed for the analysis of raft foundation with mid - thick plate. the stiffness matrix of single pile among the pile group can be founded assuming the total contact between the plate and the foundation. and the results of stress and deformation of plate, the force on pile and the settlement of pile bottom can be solved after the finite element disperse for the plate and the establishment of balance equation of pile - raft interaction

    在引入16節退化等參元的中厚板筏板分析模型的基礎了,假定筏板與地基間完全接觸,建立了群中單身剛度矩陣,繼而對筏板進行有限元離散得到筏共同作用的平衡方程,從而求解筏板內力、撓度、頂反力、沉降等一系列結果。
  9. With the input of a vibration acceleration history of subway train, a full dynamic analysis of soil - pile - structure is carried out. the propagation of vibration wave on the ground and vibration responses of the huge platform and the storied buildings are analyzed. some conclusions are drawn as follows : ( 1 ) with the increase of the distance to the vibration source, vibration intensity of the ground decreases ; ( 2 ) the vibration intensity of the ground in vertical direction is slightly larger than that in horizontal direction ; ( 3 ) with the increase of the distance to the vibration source, the situation that the vibration intensity of each building in horizontal direction is maximum at highest and lowest story whereas minimum at the middle story changes gradually to that decreasing with the height of building ; ( 4 ) in vertical direction, the vibration velocities and accelerations at the end points of each story of a building are the nominal identical, which indicates that the vertical vibration of them is unanimous ; ( 5 ) the vibration intensity in vertical direction of a building is larger than that in horizontal direction ; ( 6 ) increasing of the elasticity of track is an effective way to abate vibration of ground and buildings

    本文以北京地鐵八王墳車輛段地上超大結構(車輛段大平臺及其上的小區樓房)及其地基基礎為研究對象,在研究和分析有關資料的基礎上,用快速拉格朗日有限差分法軟體flac建立了二維數值分析模型,並以列車振動加速度時程作為模型輸入,進行了地基?基礎?地上結構的整體動力學分析,分析了地鐵列車運行產生的振動在地面的傳播規律及其對地上結構的影響,得到了如下結論: ( 1 )隨著與地鐵線路距離的增大,地面的振動強度有減小的趨勢; ( 2 )地面豎直方向的振動強度較之水平方向的略大; ( 3 )隨著與振源距離的增大,在水平方向上,地上各幢樓房的振動強度由底層和頂層的最大、中間層的最小逐漸過渡到沿樓層增高而減小; ( 4 )在豎直方向上,每幢樓各層的振動速度、加速度完全相同,表明樓房各層在豎直方向上的運動狀態一致; ( 5 )各幢樓房豎直方向的振動強度比水平方向的大; ( 6 )增加軌道彈性是減輕地面和地上建築振動的有效途徑。
分享友人