等降水理線 的英文怎麼說

中文拼音 [děngjiàngshuǐxiàn]
等降水理線 英文
isohyetal line
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 理線 : wire trimming
  1. Finally, the method of estimating power customer emission level based on binary linear regression is put forward, which make it a condition that harmonic emission is steady at the point of common coupling. combined with power system thevenin equivalent and customer norton equivalent, according to the principle of least squares method, the voltage that a customer ' s harmonic current begets at the point of common coupling can be estimated in the light of the plural correlation of network parameters

    最後,提出了基於二元性回歸的用戶諧波發射平估計方法,該方法在假設公共聯接點諧波發射穩定的情況下,結合系統側戴維南值與用戶側諾頓值的電路圖,按照最小二乘法原,利用電網各參數的復數關系推導關于系統側諧波阻抗的二元性回歸方程,並根據諧波阻抗的估計值求取用戶諧波電流在公共聯四川大學碩士學位論文( 2003 )接點產生的電壓
  2. To this area precipitation materials for many years, evaporate materials, surface flow materials, hydrometeorological materials, hydrogeological materials carry on exhaustive analysis, have analysed the state of water resource of the sand district, proceed from the heat of the earth ' s surface is balanced, water yield balanced basic theories, combine the amount of regional water resource set up of the materials, such as scene, hydrology, soil of the sand district, etc. and estimate models, have calculated the surface water, groundwater of this area, has carried on models to examine according to the real data, and has predicted to the state of water resource under different climate change scenes of future that analyse. have put forward the scheme that the water resource in this area utilized rationally, use the non - linear motive force model to predict the precipitation, utilize the materials of actual observation, the natural supply amount of calculating out groundwater of sand ground of balanced principle of the amount of water used at the same time, and can exploiting amount predict to groundwater, district of sand,

    本文以寧夏半乾旱地區鹽池縣沙地資源為研究對象,對該地區多年資料、蒸發資料、徑流資料、文氣象資料、文地質資料進行了詳盡的分析,分析了沙區的資源狀況,從地表熱量平衡、量平衡的基本論出發,結合沙區的氣象、文、土壤資料建立了區域資源量估算模型,計算了該地區的地表、地下,根據實際資料進行了模型檢驗,並對未來不同氣候變化情景下的資源狀況進行了預測分析,提出了該地區資源合利用的方案,運用非性動力模型對量進行預測,同時利用實際觀測資料,運用量平衡原計算出沙地地下的天然補給量,並對沙區地下可開采量進行預測。
  3. On the other hand, the activity and function of p27 kip1 was affected by many physiological agents such as camp, il - 2, rampamycin. the expression of p27kip1 increased after - irradiationin in the fibroblastoma cells, leading to arrest in gl phase, but its expression markedly decreased after y - irradiation in the nbcc cells, and leaded to arrest in g2 / m phase. several studies have reported that p27 kip1 involved in a much wider range of cellar processes, such as differentiation, apoptosis and migration, the expression level of p27kip1 is key for its function in dna damage responses

    另一方面, p27kip 』的活性平及功能作用,因細胞類型不同而各異,又受多種因素的影響,如一些有絲分裂原camp 、雷帕黴素可以上調p27kip ,的表達,而il一2則與p27ki 」 『的表達下有關,受電離輻射( ir )照射的成纖維細胞瘤及用1 , 25一二經基d3處的hela細胞系在gl期均有游離的p27腳『的積累,細胞周期阻滯在gl期;而在痣癌伽bccs )細胞中, y一射能誘導p27吻『表達平的顯著下調,細胞周期阻滯在g2艦期。
  4. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下、根據地層條件選擇施工方法、增大左右隧道開挖面的距離、合確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌對策。
  5. Exploitation of groundwater can cause uneven subsidence of ground surface. if it can not be disposed well, a lot of environment calamities such as collapse of building and fracture of underground pipe lines, can occur

    地下開采工程會引發地面不均勻沉,如果處不當會造成地面建築物破壞和地下管斷裂多種地質環境災害。
  6. Production data management module is responsible for the management of basic manufacturing data, including basic process data, typical process flow data, equipment and worker data, etc. capability requirement planning module is responsible for the planning of manufacturing resources according to estimate of market demands, supplies the company with data for resource planning. line balancing module is responsible for production line balancing based on the detailed orders, in order to improve the use of manufacturing resources. and facility layout module is responsible for facility layout according to the result of line balancing and the manufacturing data

    生產數據管模塊負責基礎生產數據的管,包括製鞋基本工序的管、標準部件和變型部件的典型工序流程管、設備和人員數據的管;資源需求計劃模塊根據企業對產品族各個產品的市場需求預測信息以及產品族各個部件對生產能力的需求數據,進行企業資源需求計劃,為企業提供製造資源能力的中長期規劃分析;生產平衡設計模塊是根據企業的具體產品定單,對產品各個部件的流生產進行平衡設計,以提高資源的利用能力;設備優化布局模塊則根據各條生產的工序要求和設計結果,進行廠房的設備優化布局,低物流強度,提高流的生產效率。
  7. Fcd. 3 138g : 4ds outer - thread copper pipe union at both ends of the inlet and the outlet this valve uses the principle of two - stage pressure reducing variation and, when to lower the switch valve, the shock from the water pressure to the valve casing shortens the start time of this valve under the highest medium pressure and makes it with the incomparable superiority of energy saving among the pulse - type electric - controlled valves, combining to increase filtered to regulate the discharge function with machine type

    該閥採用二級減壓變化原低開關閥時壓對閥體配件的沖擊,提高電磁閥的可靠性和工作壽命,縮短了閥在最高介質壓力下開啟時間,使其在脈沖式電控閥門中具有無可倫比的節能優勢,並在接上採用密封插件,並增加了過濾器和機械式調節流量功能。
  8. In view of geological and hydro - geological situations of the south anchor runyang yangtze river highway bridge, the paper bring forward mathematical model and calculation method of double deck structure groundwater, which can be used to lively calculate every layer ' s water table, so that we can realize every layer ' s settlement calculation and control ; establish the inter relationship between non - linear physical - mechanics parameter and hydro - geological parameter, objectively describe the non - linear change process of the porosity, hydraulic conductivity, specific storativity in the process of soil dewater and concretion

    針對潤揚長江公路大橋南錨場地地質、文地質條件提出了雙層結構地下運動的數學模型和計算方法,該方法可以實時計算出各分層的地下位,實現了各分層沉計算與控制研究;建立了土層非性物力學參數與文地質參數之間的內在聯系,客觀地描述土層? ?固結過程中孔隙度、滲透系數和貯參數非性變化過程。
  9. In addition, both the series - parallel connection and parallel pipeline for the circuit structure are availed to cut down hardware area and improve processing speed of the system

    同時,為保證系統的實時處速度和低硬體成本,在演算法的vlsi實現時採用串並結合和并行流設計。
分享友人