pipe pile foundation-
The reason of blocking pipe while pouring the pile of bridge foundation is analyzed, and the dealing methods are expounded
對橋基礎灌樁堵管進行了原因分析,論述了堵管事故的處理方法,闡明了灌樁堵管的具體對策。Abstract : the reason of blocking pipe while pouring the pile of bridge foundation is analyzed, and the dealing methods are expounded
文摘:對橋基礎灌樁堵管進行了原因分析,論述了堵管事故的處理方法,闡明了灌樁堵管的具體對策。In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted
其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985
自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。These problems are discussed in the light of the construction of the steel tubular pile foundations for bahekou heavy cargo wharf in the three gorges and yangjiawan container & general cargo wharf
文章依託三峽壩河口重件碼頭和楊家灣集裝箱雜貨碼頭鋼管樁基礎工程,探討了以上問題。Founded in 1998, wuhan huawei corporation is a modern and excellent high - tech private - owned enterprise with strong technical strength, strict management system and advanced inspection and testing system. with the construction pile driving machinery, steel structure, and heavy - duty hydraulic cylinder as its main business, it concentrates upon the invention, design, manufacture and foundation construction
武漢華威公司創辦於1998年,是一家技術力量雄厚、管理制度嚴謹、檢測系統先進,以建築樁工機械、鋼結構、重型液壓油缸為主業,集發明、設計、製造生產、基礎施工於一體的現代化優秀高科技民營企業。Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced
文摘:本文介紹深淤泥厚填土場地大型輸水干管工程的地基處理,水泥攪拌樁復合地基基礎設計與計算及過橋管、過堤管等的技術處理措施。With an actual ground source heat pump system example, based on the hourly calculation of annual cooling and heating load, carries out numerical simulation on heat transfer characteristics of the soil around compact pile - buried underground heat exchangers with large land area
摘要以一實際地源熱泵系統為例,在全年逐時負荷計算的基礎上,對大面積密集型樁埋換熱器管群周圍土壤的換熱特性進行了數值模擬。The static pressure pipe piles were used as foundation in the construction of high - rise buildings for the first time, despite their advantages over other piles
摘要靜壓管樁基礎與其它樁基形式相比有諸多優勢,但用於高層建築尚屬首次。Diving casting cast - in - place pile
深基礎沉管灌注樁Based on the study idea of the former pile else, this paper has conducted and discussed the mechanism of consolidation, settlement calculation and optimization design of the pcc pile according to the test in situ results and reasoning. it includes the followings in detail : ( 1 ) compared with the precast tube concrete pile and tube sinking concrete pile, the merits and shortages, construction machine, construction technology of the pcc pile and pcc pile composite foundation are introduced in detail to make the pcc pile be known completely by engineers
本文在借鑒其他樁型的研究的基礎上,通過現場試驗研究和理論推導,對pcc樁處理軟基加固機理、沉降計算和優化設計等進行了較為深入的研究和探討,具體包含以下幾方面的內容: ( 1 )在與預制管樁和沉管灌注樁等樁型比較的基礎上,對pcc樁的優缺點、施工機具設備、施工工藝、技術作用機理以及pcc樁復合地基技術特點等進行了述評。Abstract : this paper introduces the suitable range, the working principle, the construction technology and the measure of quality of driven cast - in - place piles, analyses the characteristics of engineering geological layer in anshan area, and finally, further discusses their economic efficiency of cast - in - place piles and shallow foundations
文摘:論述了沉管灌注樁的適用范圍、工作原理、施工工藝和質量保證,並結合鞍山地區的工程地質結構特點,探討了採用沉管灌注樁與淺基礎形式兩種工藝的經濟效益According to the special atmospheric and geologic conditions in sudan oilfield, steel pipe pile is the preferred basement of oilfield equipment basement
摘要根據蘇丹油田的氣候和地質條件,選定其油田設備基礎為鋼管樁基礎。The behind schedule theories research obstructs the ccsn ' s further development. on the soil nailing and compound soil nailing research foundation, according to ccsn present research condition and the engineering effective demand, the stability of ccsn is studied systematically by methods of theories research, orthogonal experiment research and case research. some beneficial results of the ccsn ' s mechanism and behaviors are gotten and the analysis model and method of ccsn ' s stability are established
在前人對土釘及復合土釘研究基礎上,根據目前錨管樁復合土釘支護的研究現狀和工程實際需要,採用理論研究、正交試驗研究、工程實例研究相結合的方法,對錨管樁復合土釘支護穩定性進行了系統全面的分析和研究,得到了錨管樁復合土釘支護機理及性狀的一些有益成果,建立了錨管樁復合土釘支護穩定性分析模型與方法。He has contributed significantly towards experimental research in a wide range of practical problems including slope stability, reinforced fill, retaining walls and excavation support systems, submarine pipelines, piling and ground treatment processes. his contributions in retaining walls and reinforced soils earned him the sir benjamin baker silver medal awarded by the uk institution of civil engineers
他對實驗研究作出極大的貢獻,研究課題實用性高而且廣泛,包括邊坡穩定、加固填土、護土墻和深基開挖支撐系統、海底管道、樁基礎和地基處理。在護土墻及加固填土方面的研究使他贏得英國土木工程師學會的sirbenjaminbakersilvermedal 。分享友人