管纜控制的 的英文怎麼說

中文拼音 [guǎnkòngzhìde]
管纜控制的 英文
umbilically-controlled
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名1. (拴船用的鐵索或多股粗繩) cable; hawser; mooring rope 2. (擰成多股的似纜物) thick rope; cable Ⅱ動詞(用繩索拴船) cable
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 4次方是 The fourth power of 2 is direction
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. The functions of this automation system focus on five aspects : data acquisition 、 supervision and control 、 fault isolate and recovery 、 gis 、 data statistic and report. the design project takes the rcs - 9000 series 、 sd ? 9520 and sd - 9630, which is a new installation that can detect the operation state of the low - voltage current breaker, and send the state to the control room. the other new installation is sd - 9860, which is the monitor of the cable fault

    設計方案中,在採用南瑞rcs - 9000系列、雙電公司sd - 9520裝置同時,採用了新開發sd - 9630塑殼開關運行狀態採集裝置,檢測塑殼開關運行狀態,並將運行狀態傳回到集中心(中間站) ;採用了新開發sd - 9860電故障指示器,完成電故障識別;集中心設計實現了整個小區配電自動化系統集中通訊、實時監、統計與理功能;高、低壓開關實現了自動、狀態檢測和無功補償等。
  2. A comparison of the electric field distribution in a cable termination with several different stress control tubes is presented

    摘要利用時域有限元方法分析了含不同應力終端電場分佈。
  3. A comparison of the electric field distribution in cable terminations with several different stress control tubes is investigated under impulse voltage

    利用暫態有限元方法分析了含不同應力終端沖擊電壓下電場分佈。
  4. The result reveals that the stress control tube comprising a composite structure of the nonlinear resistive and capacitive material shows the best performance in improving electric field distributions in cable terminations

    分析結果表明,採用由電容性和非線性電阻性材料復合絕緣結構應力時,電終端電場分佈最為均勻。
  5. The result reveals that the stress control tube comprising a composite structure of the nonlinear resistive and capacitive material shows the best performance in uniforming the electric field distributions in cable terminations under impulse voltage

    分析結果表明,在沖擊電壓下電終端採用由電容性和非線性電阻性材料復合絕緣結構應力時,電場分佈最為均勻。
  6. Abstract : when drilling cluster wells on offshore drilling platform, thefollowing up problem of all kinds of cables and bop controlling cables must be solved

    文摘:在海上鉆井平臺上鉆叢式井時,必須解決各種電束和防噴器隨動問題。
  7. Surface raceways and fittings for use with data, signal, and control circuits

    與數據信號和線路一起使用地面電道和配件
  8. Systein mode1 ing, s imulat i11g and control l ing are studied in thi s papel -, based on tl1e stato ' s " 863 " project " 1 ' he equ ipll1ent used by sl1ol1gi. i pe t l ' o 1 ] : i e 1 ( l f ' oi " i ) ( " t ( 1 ( 1 t i i1g ilnd i { eijil j l

    本文以國家「 863 」項目「勝利油田淺海海底線電檢測與維修裝置」為研究對象,圍繞著特種潛器對線位技術,對其系統建模、模擬及等技術進行了研究。
  9. The system is mainly comprised of a computer, sensors, cable, high pressure oil lines and electromagnetic overflow valve, has both the functions of measuring and control, and is awarded the explosionproof qualification certificate by china classification society

    該系統主要由計算機、傳感器、電、高壓油線和電磁溢流閥等組成,既具有監測功能,又具有功能,而且取得了中國船級社防爆合格證書。
  10. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊地理區位條件和極具代表性船舶交通理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段船舶交通理探索和實踐。 1984年11月15日當時長江航政理局在長江尹公洲水域率先施行交通;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通段建立現代化交系統可行性論證; 1990年大沙雷達站? ?內河第一座雷達交站建成,摸索實施現代化雷達交船舶交通理新途徑; 1997年長江下游南京至瀏河口船舶交通理系統建成聯網投入正式運行,同時將大沙交雷達信號通過光傳輸至交中心,統一實施全轄區船舶交通理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  11. There ’ re some shortcomings in the past audio system. firstly, audio channel is connected with an audio cable ; secondly, the installation in multi - room or long distance environment is complex ; thirdly, extra hardware and cable is needed in the management and monitoring of the audio content ; lastly, the audio routing is manually operated or by expensive audio routers, also, the reconfiguration of the audio system is complicated and time - consuming. in comparison with the past audio system, audio and control data can coexist in cat - 5 cable using etheraudio router ; the devices can be separatedly monitored through the ethernet ; audio can be transmitted to single destination or different destination ; audio routing can be easily finished by modifying address

    傳統音頻系統中,音頻軌道都要與一條音頻電相連;多房間、長距離安裝復雜;音頻內容理和監都需要附加硬體設備和電;音頻路由需要人工接線或昂貴音頻路由器,系統重新配置也是復雜而耗時過程。 etheraudio音頻路由器可以利用5類線同時傳輸音頻和數據;音頻設備可以通過以太網獨立監;音頻數據可以傳輸到單個或多個目地;音頻路由可以通過更改地址信息輕易地完成。
  12. Yuandong cables select advanced production device, pursue the best qualityand technology design steps, adopt international advanced quality control management technology, the qualification rate of products reach to 100 %

    遠東電採用先進生產設備、對產品質量、技術設計環節精益求精,採用國際先進質量理技術,產品達到100 %合格率。
  13. Referr ing to theor ies on inventory control i ing, this article br ings forward the inventory control i ing model of cable industry aiming at its character i sties of manufacture and management and then designed a management information system of inventory based on the mode i ? the model and the system have instructional and practical significance to efficiently control i ing of inventory in the cable industry

    本文針對電行業生產、經營特點,依據庫存有關理論提出了電生產企業庫存模型,並在結合企業其它理功能基礎上設計了適合企業自身特色庫存信息化理系統。該模型及系統對實現電生產企業有效庫存有較好指導意義和實踐價值。
  14. The second choice would be closer to what would happen in the event of a real drive failure, while the first would simulate something like a failed disk controller or bad cable situation - where one of your mirror drives was temporarily unavailable, causing dev md0 to run in degraded mode, and requiring one of the partitions to be added back to the volume after the problem was remedied

    第一種方案也模擬了一些事件,如磁盤器故障或電故障,但第二種方案與對實際驅動器故障處理更加類似在第一種情況下,只是某個鏡像驅動器暫時不可用, / dev / md0以降級模式運行,在問題得到修正以後,需要再次將一個分區添加到卷中。
  15. First, the article reviews the theory of strategic management. then, using related theory, methods and models, followed by the steps of strategy analysis, strategy formulation, strategy implementation, strategy control and strategy evaluation witn some matrixes, such as external factor evaluation ( efe ) matrix, internal factor evaluation ( ife ) matrix, threats - opportunities - weakness - strengths ( tows ) matrix. boston consulting group ( bcg ) matrix. strategic position and action evaluation ( space ) matrix and quantitative strategic planning matrix ( qspm ), etc. to analyses the external environment and internal situations. at last, the article puts forward to expanded strategy for deyang cable stock corporation and gives some advice on the implemention and control of the strategy. the author hopes that this article is beneficial to the development of deyang companyt

    本文首先對有關戰略理論進行了回顧,其次,運用戰略有關原理、方法與模型,按照戰略分析、戰略定、戰略實施以及戰略和評價等步驟,運用外部因素評價( efe )矩陣、內部因素評價( ife )矩陣、威脅-機會-弱點-優勢( twos )矩陣、波士頓咨詢集團( bcg )矩陣、戰略地位與行動評價( space )矩陣以及定量戰略計劃( qspm )矩陣等方法,對德公司外部環境和內部條件進行分析,最後定了擴張型總體發展戰略,並對戰略實施及提出了相應措施,期望能對德公司發展提供幫助。
  16. Abstract : for building a long - span concrete - filled steel - tube ( cfst ) arch bridge with an integrated installation tower, one of the key technologies is to control the arch rib alignment of the bridge. based on the theoretical analysis and the measuring results, the designed arch rib alignment of a being built bridge can be guaranteed quality by adjusting the length of the cables on - line. the engineering application shows, by using the on - line adjusting cable technology, that it is economical and in safety for building a long - span cfst arch bridge

    文摘:在大跨度鋼混凝土拱橋塔架/扣架一體化索吊裝施工中,其關鍵技術之一是主拱線形.在理論分析和現場測試基礎上,動態調整扣索長度,可保證鋼拱肋設計線形.工程實踐表明:將扣索動態調整技術應用於大跨度鋼混凝土拱橋吊裝施工中,可降低工程造價,保證施工質量
  17. Standard for safety for surface raceways and fittings for use with data, signal and control circuits

    與數據信號和電路一起使用表面電道和配件安全標準
分享友人