管道支架 的英文怎麼說

中文拼音 [guǎndàozhījià]
管道支架 英文
base support
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  • 支架 : support; stand; trestle; holder; rack; tressel; spur; sting; husk (hoose); buck; undercarriage
  1. 1, reasonable sructure, good elasticity, large range of compensation pipeline and little counterforce to the brackets of pipeline

    1結構合理,彈性好,補償熱脹冷縮范圍大,對管道支架的反作用力小
  2. In addition, for temperature stabilization, the cuvette holder ' s base plate has internal channels that can connect to a circulating, constant - temperature water source

    另外為了達到穩定的溫度,試的底有內部通,通與一個循環的、恆溫的水源連通。
  3. Pump touch with the liquid part is the fluorine plastics, but crust is metal stuff, so the pumpbody is enough to support the weight of pipepad and repel mechanically concussion. imd multilevel magnetic force pumps is electrical engine direct link pattern, by centernog prop up, teardown and maintenance is convenient, the structure is tightly, safety and economize energy, one man can put up check - fixing the part inside and replace it easily, consumedly convenient the usual maintain of customers work

    泵接觸液體部分是氟塑料,但外殼是金屬材料,故泵體足以承受的重量及抵受機械性沖擊。 imd系列磁力泵為電機直聯式,由中間撐,安裝拆卸方便,結構緊湊安全節能,一人便可以輕松的進行內部檢修和零件更換,大大方便了用戶日常的維護保養工作。
  4. The company is specialized in producing the utility boiler pipe auxiliary, the construction pipe hangers, ferrules, wire netting stands, air conditioner netting covering, and all kinds of stamping components and non - standard components

    公司專業生產電站鍋爐輔件,建築抱箍,金屬網空調網罩及各種沖壓件非標標準件。
  5. According to results of calculations and experiments, main causes that contribute to vibration are founded, then puts forward improving measures of adding deflexed supporting and suspending nogs and making pipelines shunt - wound, finally completes improvement tasks following is the main works completed in this thesis : ( 1 ) this thesis sets up a mathematic model of steam pipelines, using ansys5. 6 limited - unit analyzing software, calculates the ten phase inherent frequency and the foregoing eight phases vibration types of four steam pipelines of the unit before dealt with

    為了解決八零三電廠2號汽輪機四根主蒸汽導汽振動的問題,本文建立了相應的計算模型,並根據計算和實測結果,找出了振動的主要原因,提出了加裝偏轉並聯的改進措施,完成了改造工作。本文主要工作是:建立導汽計算模型,並應用ansys5 . 6有限元分析軟體,對機組四根導汽治理前的10階固有頻率和前8階振型進行計算。
  6. ( 3 ) by spot reconnaissances, according to the results of calculations and measures, the problem of vibration is solved by adding deflexed supporting and suspending nogs, making pipelines shunt - wound and without changing the previous design and collocation, which can also measure up nationally. to complete the improving program successfully, the improving project is demonstrated using ansys5. 6 limited - unit analyzing software, the results of it show that the project put forward can resolve the problem of transmitting steam pipelines

    通過現場勘察,根據計算和測量結果,決定在不改變導汽原有設計和布置,同時又滿足國家標準的前提下,採用加裝偏轉、導汽並聯的措施,通過改善導汽剛度和改變固有特性的方法,對該機組四根導汽振動問題進行了處理。
  7. In many big enterprises such as electric power and pentrifaction ones, there are lots of high temperature and pressure pipelines conveying steam. because of improper design, collocation and adjustment of the supporting and suspending nogs, pipelines often vibrate, which affects natural life, threatens safe production and even leads to grave accident

    在電力、石化等大型企業中,存在著大量的高溫、高壓輸汽,由於設計、布置和調整不當,常常發生振動,影響的使用壽命,對安全生產造成威脅,甚至引起重大事故。
  8. If water hammer occured as the water is full, the steam pipeline, appurtenance, support should be checked. only when there is no abnormal condition observed, can the normal oparation resumed

    若滿水時還出現水擊現象,則在恢復水位后,還應檢查蒸氣、附件、等,無異常時才恢復正常運行。
  9. This composite pipe has its shell constructed with metal with brackets by point welding u - shape tortoise shell network in the inner wall and stuffed with rare earth wearable materials making the pipe enjoy better anti - eroding and wear resistant capability

    本產品是以金屬為殼體,內壁點焊u型或工型龜甲網作為,龜甲網內填充稀土耐磨材料的復合,具有更好的抗耐磨、抗沖刷性能。
  10. Stents are small, mesh tubes that prop open narrowed arteries

    心臟是小的網狀以撐開狹窄的動脈。
  11. Pipe brackets of steel for ships pipelines of unplasticized polyvinyl cloride

    船舶用未增塑的聚氯乙烯的鋼
  12. Secondly, based on the ideal characters of artificial trachea, three types of tubular fabric were designed as the stent : woven tubular fabric ; plating knitted tubular fabric and completely degradable knitted tubular fabric which is made of pgla only

    其次根據人工氣的理想性能特徵設計了三種用作織物:機織組織織物、針織添紗組織織物和僅採用聚乙丙交酯編織的可完全降解的針織緯平針織物。
  13. Method : seventeen patients with malignant airway lesions caused by esophageal cancer were treated by placement of 23 expandable stents ( 19 airway, 4 esophagus )

    方法:在十七位食癌並氣侵犯的病志中,共置放了二十三個金屬(十九個氣,四個食) 。
  14. Check pipe - hangers, supports, guides, expansion joints, and other pipe specialties for the removal of all shipping and erection stops and for the correctness of cold settings for the design service

    檢查、導向、膨脹節及其它特殊件,以除去所有的運輸與安裝附件,確保設計服務冷設置的正確性。
  15. Pipe supports and hangers. part 1 : technical specification

    第1部分;技術規范
  16. Pipe supports and hangers. part 3 : middle connection attachments and building structure attachments

    第3部分:中間連接件和建築結構連接件
  17. Practice for design and installation of rigid pipe hangers

    硬質管道支架的設計與安裝慣例
  18. Optimized design of conduit bracket under pro mechanica circumstance

    環境下的管道支架優化設計
  19. Standard practice for design and installation of rigid pipe hangers

    硬質管道支架的設計與安裝標準規程
  20. Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping, pipe support, etc. ) & liner and rock bed, complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane

    第六步:待襯內所有的安裝工作(包括工藝配管道支架等)及襯與巖床間的灌漿、養護工作完成後,用35 / 50噸液壓起重機和25噸汽車起重機完成襯頂部封頭的安裝工作。
分享友人