節水船閘 的英文怎麼說
中文拼音 [jiéshuǐchuánzhá]
節水船閘
英文
thrift lock-
Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough
沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的水位變化而設置船閘。長期以來,由於缺乏對鹽水入侵內河河道產生影響的定量評估,在船閘運行過程中為防止高鹽度鹹水入侵內河,通常採用將內河淡水打入閘室的方式來調節通航水位,船閘的這種運行方式不盡合理。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。In the thirteenth year under the reign of the yongle emperor, after investigation and reconnaissance, chen xuan dug a 20 li - long river from the west of huai an city. the river channels off the water of guanjia lake into the huai rver. the river was named as qingjiangpu. along the river such four watergates as yifeng gate, qingjiang gate, fuxing gate and xingzhun gate were built to control the water level
永樂十三年,陳?通過實地走訪查勘,淮安城西鑿渠20里,導管家湖堤水至鴨陳口入淮,此河命名為清江浦,河上遞建移風清江福興新莊四閘,以便調節水位,此後,漕船可直入黃河,節省了大量費用。分享友人