節熱器 的英文怎麼說

中文拼音 [jié]
節熱器 英文
economiser
  • : 節構詞成分。
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  1. Improvement on regulating drainage of high pressure feed water heater

    高壓加疏水調方式的改進
  2. Our main products are micro barometer low pressure gauge low pressure capsule gauge vacuum pressure with low pressure gauge pressure gauge with electrical contact shock - proof electric contact gauge stainless steel pressure gauge dry and glycerin filled pressure gauge normal pressure gauge freon pressure gauge oxygen - acetylene pressure gauge stainless steel vacuum pressure gauges series diaphragm seal pressure gauge diaphragm pressure gauge with electrical contact pp diaphragm seal pressure gauge shock - proof pressure gauge with electrical contact diaphragm seal pressure gauge explosion - proof electric contact pressure gauge minitype pressure gauge accurate pressure gauge test pressure gauges as well as pressure gauge switch pressure separator tube pressure gauge radiator double - metal thermometer all the products can meet both national and international stands,

    一般壓力表氣壓表抗震壓力表充油壓力表全不銹鋼壓力表膜盒微壓表電接點壓力表冷媒壓力表真空壓力表壓力真空表隔膜壓力表微型壓力表差壓表微差壓表絕壓表精密壓力表耐高溫壓力表蒸氣壓力表汽車燃氣壓力表醫用壓力表遠傳壓力表衛生型壓力表壓力表緩沖管壓力表冷凝散壓力表翅片散壓力表開關不銹鋼連接彎管不銹鋼連接軟管轉換接頭油壓連接頭壓力表針閥流閥及過壓保護附件濾油網加油口油溫油麵計雙金屬溫度計等。
  3. At present there is a lack of fundamental data of dynamic thermal transfer performance of ground loop exchanger and energy - saving performance of gshp system

    但有關埋地換動態特性以及地源能潛力方面的基礎性研究較缺乏。
  4. The average pmv value indoor by ceiling heating is higher than the other two be used for room heating under same energy consumption, and the vertical distribution of indoor temperature results by either of the method in a heating room is different from that in a closed room

    頂棚輻射供暖墻體具有一定蓄能力,使其能性優于散供暖和風供暖。在相同的能耗條件下,輻射供暖比散供暖和風供暖的pmv值要高。
  5. Energy consumption of heating rooms will increase when air exchange rate become large. because the mechanisms of heating methods used currently, such as radiator heating, ceiling heating and warm - air heating, are different from each - other, the indoor thermal environment is not the same when each one of them employed for room heating. for enhancing energy efficiency of heating rooms, indoor thermal comfort and energy saving effects should be investigated when natural ventilation is used to make a good air quality indoors

    房間換氣次數的增加勢必導致供暖房間能耗加大,頂棚輻射、散風等三種採暖方式由於供暖機理不同,形成的室內環境特徵不同,通風換氣時產生的通風損失也有所區別,為了提高大換氣量房間的供暖能效果,必須對不同供暖方式在大換氣量情況下的舒適性與能效應進行研究。
  6. Results show that the tube - burst is mainly due to the result of tube ' s long term overheating, while the main causes resultsing in overtemperature of the platen superheater are as follows ; ( 1 ) burn - out of superheater ' s pipe - grippers ; ( 2 ) some tube - sections are out of the row ; ( 3 ) unsuitable mode for adjusting the desuperheating water

    結果表明:爆管主要是由於管子長期過所致,而屏式過管卡燒損、個別管段出列、減溫水調方式不當是引起屏式過超溫的主要原因。
  7. Offers maximator air driven liquid pumps, air amplifiers, gas boosters and packaged systems

    -生產除油除水除塵等壓縮空氣凈化裝置,高效能型系列換,壓縮空氣儲氣罐。
  8. The components of this system are a cross - flow finned - tube evaporator, cross - flow finned - tube gascooler, a reciprocation compressor, a gas - liquid seperator, a double pipe internal heat exchanger and a throttling valve

    系統由一個叉流翅片管式蒸發、一個叉流翅片管式冷卻、一臺往復式壓縮機、一個氣液分離、一個套管式回、一個流閥組成。
  9. Analysis is made on structure characteristics of the finned - tube, and analysis has been made on the special heat and mass transfer principle of every micro - unit under both dry and wet conditions. appropriate hypothesis is made and based on the energy, mass and momentum equivalent, the evaporator models of dynamic distributed parameters are set up. in addition, the gascooler and internal exchanger models of dynamic and distributed parameters, the throttling valve models and the compressor models are set up, too

    本文的內容如下: 1對翅片管蒸發的結構特點進行分析,選取適當的微元體,對于干、濕工況下每個微元分別進行傳傳質分析,通過適當的假設,利用質量守恆方程、能量守恆方程和動量守恆方程建立了蒸發的分佈參數數學模型;對回劃分微元建立了分佈參數數學模型;對氣體冷卻建立了分佈參數數學模型;對壓縮機建立了數學模型;建立了流閥的數學模型,為系統模擬奠定了基礎。
  10. Fire hazard testing. part 2 : test methods. bad - connection test with heaters

    著火危險試驗.第2部分:試驗方法.第3:用發作不良接觸試驗
  11. The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method

    本論文從目前空調工程中使用的變流量水系統入手,研究了盤管換在部分負荷下水流量與換量的非線性關系,分析了文獻中介紹的旁通管通流能力選擇的不足之處和一次泵水系統採用壓差旁通控制時,工況轉換不能滿足系統控制要求的缺陷;比較了一次泵變流量水系統中壓差旁通控製法、回水溫度控製法、負荷控製法的精確性,並得出了在一次泵水系統的工況轉換時,採用負荷控製法能使冷水機組及其相應水泵在啟停時的負荷變化范圍較小,更符合建築物的冷量需求,能效果較好的結論。
  12. After researching the part thermal equipments and systems include heaters, steam leakage and receiving systems, low pressure drain system etc, and computing the efficiency of the systems, find out the better choice of the imported assemblies than the domestic assemblies in parameter and the disfigurements in design and making. based on the above, point out the measure to progress them. according to the analysis, we can get some measures to increase the economical level of the systems and save more energy

    對局部力設備及力系統進行分析研究,包括:加設備、漏汽及回收系統、低加疏水系統、主、再蒸汽系統以及凝汽等部位;並計算汽輪機本體高、中、低壓缸效率,藉此著重對汽輪機通流部分進行了剖析,找出國外進口機組動、靜葉柵、葉型的選擇比國產機組先進性以及國產機組在通流部分設計和製造中的諸多缺陷,並且指出了改進的方向,為機組提高經濟性、能降耗奠定了理論基礎。
  13. Abstract : on the basis of the principle of equivalent enthalpy drop, the online calculating model on the influence of every heater end temperature difference on the unit economy is established which shows the online influence degree. therefore, it provides the theory basis for overhaul workers

    文摘:以等效焓降理論為基礎,建立了各級加端差對機組經濟性影響的在線計算模型.通過該計算模型可以在線顯示每級加端差對機組經濟性影響的程度,從而為運行檢修人員提供了理論依據,對電廠能有一定的現實意義
  14. The limitation of mini - volume and mini - power application condition is adequately considered, and design of whole refrigeration system is accomplished farther, including choose and structure design of compressor, choose and calculation of heat exchanger, calculation of capillary, etc. structure design of the rotary compressor is the most primary part of the design of whole refrigeration system

    根據計算結果,並充分考慮到小體積、小功率的應用環境限制,進一步完成了整個製冷系統的設計實現,包括壓縮機的選型和設計、換的選擇和計算以及流管的計算等等。其中,滾動轉子壓縮機的結構微型化設計是整個製冷系統設計的核心部分。
  15. Frame for pre - heater at kiln inlet will adopt steel structure to save investment, accelerate erection speed and beautify building

    改進窯尾工藝布置,窯尾預塔架設計為鋼結構,既可加快施工安裝進度,省投資,又可美化建築。
  16. Electrical installations of buildings - part 7 - 703 : requirements for special installations or locations - rooms and cabins containing sauna heaters

    建築物的電氣設施.第7部分:特殊設施或場所的要求.第703:蒸汽浴室加的連接點
  17. Thirdly, radiator performance test - bed thermal system control modeling and rule self - organizing fuzzy control simulation were studied. the water supply temperature, radiator inlet temperature, test room temperature based on water temperature regulation, air supply average temperature and test room temperature based on air temperature regulation total five controlled processes transfer function were set. finally, rule self - organizing fuzzy control simulation for two

    通過試驗,辨識了散實驗臺工系統中供水溫度、散進水溫度、基於水系統調的測試室溫度、送風平均溫度及基於送風系統調的測試室溫度共5個被控過程的傳遞函數,並對基於水系統調和基於送風系統調的測試室溫度響應過程進行了規則自組織模糊控制模擬。
  18. Reformation on drainage controller for 25 mw unit high - pressure heater

    機組高壓加疏水調的改造
  19. The object to study in this paper is the electric heat reservoir boiler, which is used to supply heat water and bask for the resident population. the use of the system define the character of the output medium with the lower request on quality and parameter, at the same time, it ask the boiler should has the higher character on the respect of the cost, reliability, economy, and so on. hence, the paper carefully design and study the system for the choice and design of the boiler core heating componet, the lay of the heat exchanger, the working status of the heat reservoir equipment, the adjustment and control mode of to supply heat water. the study work mainly include underside some contents, forexample : 1. to confirm the heat medium parameter to adapt the requirements of the most of the heating equipments and to design the instruction of the boiler and heat reservoir as simple as possible

    圍繞上述原則,本文從電鍋爐核心加元件的選型及設計、換面的布置、蓄設備的運行工況、供的調方式以及控制方法進行了較細致的研究和計算,具體研究工作有以下幾個方面: 1 .根據使用要求,確定適用於多數採暖設備的介質參數,設計在結構型式上盡可能簡單的鍋爐和蓄; 2 .對製造加元件電管的各種材料進行了對比和分析、在結構尺寸上進行了仔細的分析和計算,根據實際使用條件給出合理的設計,使其具有較高的可靠性和使用壽命; 3 .對不同換面布置形式進行傳分析。
  20. The values obtained from the optimum calculation are compared with that from the conventional calculation, and the result shows that, by means of the optimum design, under the given restrains, the pipe heat exchanger can operate well with a reduction of over 25 % heat transfer area

    實例優化計算結果與常規計算結果的比較表明,優化設計可使管式換在滿足給定約束條件下,約25 %以上換面積,提高管程和殼程的流速,從而提高傳系數,最終得到操作、能耗和投資等方面的最佳經濟結構。
分享友人