節點移位法 的英文怎麼說

中文拼音 [jiédiǎnwèi]
節點移位法 英文
method of separate joint displacement
  • : 節構詞成分。
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ動詞1. (移動) move; remove; shift 2. (改變; 變動) change; alter Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 節點 : [電學] panel point; hybrid; packing; node; nodal points; joint of framework; pitch point; point pitch
  • 移位 : bit shift
  1. Then, use the direct integral calculus method of newmark to solve solution, and get each node and element ' s displacement and stress solution vs. time

    然後,用newmark直接積分進行求解,得到各和單元的、應力的時程解。
  2. Choose two nodes on the edge of the structural to compare the results calculating by the finite element program midas, then we can draw a conclusion that these kinds of space truss systems is sensitive to the libration of the dynamic wind loads. to consider this factor is very necessary in the process of design, we will use the pulsant augmentation coefficient to realize it

    比較靜力風荷載和動力風荷載作用下的有限元軟體的計算結果,選取結構邊緣部分的兩個,對比它們在兩種方計算下的最大的計算結果。經過比較可以看出重量輕、頻率低、阻尼小的柔性建築物對風荷載的橫向振動是很敏感的,在進行工程設計時應該考慮這種因素,並可採用乘以風振系數等相應方來加以體現。
  3. This method decrease the beacon cost to the least, and gets the special distribution of reference positions through controlling the moving route of the beacon, therefore can effectively overcome the beacon sacristy problem

    這種方將錨成本減到最少,並且通過對錨動路線的控制實現了參照置的特殊分佈,可以有效克服錨稀疏問題。
  4. According to the frndamental and the steps of this method, we cans use the linear regress filter method to make the simulation of the wind load and then we can educe the curve of the time - process wind velocity. after that step, we can get the chart of the dynamic wind load which we can deliver the crosswind into the particle wind load and put them on the corresponding cell nodes. then we can do the analysis of the dynamical wind load through the time - process analysis to get the max value of the displacement

    根據線性回歸濾波器的基本原理和步驟,藉助相關軟體進行風荷載的人工模擬並得出風速時程曲線,進而轉化為風動力譜,由此將橫風向風力表達成風荷載作用於相應的單元上,按時程分析對該空間桁架體系進行風荷載的動力分析,求出結構在進行風動力荷載分析時,結構相應對應的最值值。
  5. When analyzing skew support continuous curved box girder bridge, curved grid girder analyzing method considering warping effect is applied. matrix displacement method is applied in analyzing skew support continuous curved thin - walled box girder bridge with restrained bearing. in order to convert original rigidity equations to structural rigidi ty equations that can be solved, bearing nodal displacement matrix can be introduced, then unknown quantities at the edge of beams can be consistent with the restrained directions of skew bearings, unit rigidity matrix and unit nodal forces can be gained. structural rigidity matrix can be composed according to matrix displacement method, so nodal displacements and inner forces on the end of the rod that are unknown can be gained calculating equations of inner forces on any cross - section can be solved

    分析斜支承連續曲線箱梁橋時,採用考慮翹曲作用的曲線格子梁分析方,應用矩陣對具有約束支承形式的斜支承連續曲線薄壁箱梁橋進行分析,考慮到支座的約束條件並不與梁端彎曲角和扭轉角的方向一致,引入支座坐標矩陣,使得梁端的未知量與斜支座約束方向一致,來計算單元剛度矩陣和單元力,然後按照矩陣組集總剛並建立結構剛度方程,根據結構剛度方程即可求解未知的及桿端力,推導出任意截面處的內力計算公式。
  6. Abstract : in mixed - interface modal synthesis method, the substructural displacement is considered as the synthesis of the elastic displacement to interface free - points and the implicated displacement produced by the fixed - points

    文摘:在混合界面模態綜合中,子結構的被視為相對于對接界面約束的彈性變形和伴隨約束的牽連運動之和。
  7. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加針對爆破動力作用,進行邊坡的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,坡面頂部水平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放大作用,研究剖面的坡面,水平向加速度及在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,水平向及加速度絕對值均大於坡腳; ( 3 )強迫振動段,水平向加速度值隨時間變化的規律為:坡頂總的變化趨勢是越來越大,而坡體中部的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為坡頂表面滑塌型。
  8. Firstly, the paper introduces the principle of instituting contact interface element and the format of integral method for element stiffness matrix ; secondly, because of the zero of displacement and load of soil in the infinite boundary, the unique shape of element stiffness matrix is obtained for coupling the three different elements

    文中首先闡述了接觸元建立的方以及單元剛度矩陣的積分方;由於無限遠處的土場、地震作用力皆為零,計算中對該單元剛度矩陣的形式不同於四等參元,文中推導了平行無限元的單元剛度拒陣方,並介紹了無限元單元剛度矩陣組裝原理。
  9. 3. the way to calculate the equivalent joint - force is consummated in the equivalent joint - force method to calculate dam ' s permanent displacement caused by earthquake

    3 、完善了計算地震作用下土石壩的永久的等價中等價力的計算方
  10. The permanent displacement caused by accumulated damage is calculated in equivalent joint - force method, while the way to calculate the equivalent joint - force is consummated, both in the equivalent joint - force method of horizontal face and maximal static shear stress face

    而多輸入由累積損傷引起的永久可採用等價,水平面和最大靜剪應力面兩種等價中等價力的計算方都在本文得到完善。
  11. Considering the difference in application scale, we designed a proximity based mobile beacon assisted localization algorithm ( pmaloc ) for the application of small scale, and designed a distance - in - hops based mobile beacon assisted localization algorithm ( hmaloc ) for the application of large scale

    演算設計時考慮到應用規模的不同:針對小規模應用,設計了基於鄰近關系的動錨輔助定演算( pmaloc ) ;針對大規模應用,設計了基於跳計數的動錨輔助定演算( hmaloc ) 。
  12. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽水蓄能電站地下廠房區的地應力實測資料,運用函數理論,採用三維非線性有限元計算方,反演出施加在廠房區邊界上的場,藉助州sys有限元分析軟體,獲取模型邊界的坐標信息,然後通過ansys軟體的載荷函數將邊界程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  13. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特: ( 1 )本系統採用產匯流理論和水動力學方預報太湖及重要,首次在平原河網地區建立了具有實時校正功能的全流域預報調度系統。以適合太湖流域復雜的水力條件,增強預報的可靠性; ( 2 )預報模型可以根據預見期降雨量進行多方案預報,並隨時間推,可以實時進行調整,克服由於預見期降雨不確定引起的誤差,使預報結果更接近實際。
  14. Then figure out the wind load in term of the load criterion and the wind tunnel test results separately. by comparing with the two results, we can draw a conclusion that the values which generated by the load criterion are bigger than these ones generated by the other. in order to calculate and design in the worst situation, the paper select the bigger basic wind stress and then turn the area - load into liner - load to receive the displacement of the nodes and the internal force of the cells generated by the static wind load

    由此,得出用於作業棚結構設計的數據,進而按建築荷載規范和風洞試驗數據分別計算出風荷載標準值以及基本風壓,通過對兩種靜力風荷載計算的結果進行比較,可以看出,按規范計算風荷載的結果在結構的整體計算中偏於保守。按照最不利情況計算的設計準則,本論文選用較大的基本風壓值按受力面積分配的方把面荷載轉化為線荷載代入midas運算程序中,求得該結構在該靜力風荷載作用下的最值
  15. Through comparing and analyzing of bearing capacity, development of crack and strain of reinforced, the results show that the load - deflection plots f or specimens from the finite element analysis agree well with the experimental data, and choosing the rightful stress - strain relationship, utilizing ansys program, the test process can be well simulated. at the same time, making used of the program, the traditional shear wall is analyzed. it shows that comparing with the traditional shear wall, the hollow shear wall ' s cracking load drop 16 %, yield load and failure load drop 13 %, stiffness drop 13 % ~ 22 %

    其次在試驗的基礎上,將試驗手段、有限元數值模擬方和理論分析結合起來,利用有限元程序ansys對其中的兩片墻板進行非線性有限元分析,並對前後的承載性能,裂縫發展、鋼筋應變進行了比較和分析,結果表明有限元模型分析的荷載-曲線和試驗測得數據符合良好,選用合理的材料本構模型,利用ansys可以較好的模擬試驗過程;同時利用有限元模型對比分析了普通剪力墻和空心剪力墻,空心剪力墻與普通剪力墻對比,其開裂荷載下降16 ,屈服荷載、極限荷載下降13 ,剛度下降13 22 ,開裂至屈服、屈服至極限荷載階段的剛度衰減規律與普通剪力墻基本一致,空心剪力墻的後期剛度比較穩定。
  16. From the global stiffness matrix of plane frame, condensing the static force and eliminating the coupling of vertical force and displacement and other broad sense force and displacement, obtained the vertical stiffness matrix of plane frame structures subjected to vertical earthquake action considering the influence of horizontal girds and nodal

    從平面串並聯多質系結構的總剛度矩陣中,採用靜力凝聚,消去豎向力和豎向與其它廣義力和廣義之間的耦聯關系,得出框架結構在豎向地震作用下考慮水平梁和轉角影響的豎向剛度矩陣。
  17. Then the center ' s track equation of the circular cutter which was used to manufacture the cam was presented. for the problem of designing on combined cam mechanism which follows the given track, typical nodes in the track were selected at first. then the spline interpolation method was employed to plot the smooth track

    針對實現特定軌跡的凸輪一連桿組合機構設計問題,文中首先選取軌跡上有代表性的,採用樣條插值繪出光滑的軌跡曲線,進而具體分析從動件的、類速度、類加速度,最後對凸輪-連桿組合機構進行設計。
  18. Nodal shifting method

    節點移位法
  19. The thesis analyze a on - the - spot test model combining a projiect. utilizing the non - linear finite element theory in the article, form - finding has been took apart with node balanced laws and propping up move law. under the loads every calbe unit strength of axle and node displacement ' s variation tendencies are computed

    論文還結合工程實踐對一現場試驗模型進行了分析。文中利用非線性有限元理論,按平衡與支座進行找形分析。計算了外荷載作用下各索單元軸力及的變化趨勢。
  20. 2. as for the structural analysis and numerical simulation of a complex problem with high gradient, an idea was proposed, i. e. if the displacement field could be constructed by using both bezier - based function and the mobile middle node ? according to this strategy, a new coupling method, called as bezier - based element method ( bbem, for short ), was proposed and studied in detail

    2 .就具有高梯度問題的復雜結構分析與數值模擬,提出了基於bezier函數來構造帶有場函數的思路,研究並建立了基於bezier函數的單元的基本原理,構建了常用的一維和二維bezier耦合單元和等參單元7種。
分享友人