米庫沙 的英文怎麼說

中文拼音 [shā]
米庫沙 英文
mikusa
  • : Ⅰ名詞1. (稻米) rice 2. (泛指去殼或皮的可吃的種子) shelled or husked seed 3. (姓氏) a surname Ⅱ量詞(公制長度的主單位) metre
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • 米庫 : johan micoud
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白液化氣中轉站;海南南山美國阿科公司儲油氣萬立大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. Milanello - the unavailable players for the match against benfica went to milanello to continue the recovery program : in detail, the strengtehning in the sand bath for emerson and jankulovksi and therapy for ba

    蘭內洛不能前往裡斯本的球員繼續在內洛進行恢復訓練:埃莫森和揚地進行力量訓練,易布拉辛巴繼續治療。
  3. At star house, tsim sha tsui, while the storage and offices were located in a refurbished barrack building in nearby kowloon park. looking back, the former urban council really made a daring move

    當時的市政局在尖咀星光行租了700多平方的地方作為展廳,而藏品及工作室則設在海防道九公園內的一所舊兵房裡。
  4. Located on cliffs 25 km southeast of dunhuang. the first cave of the mogao grottoes was carved out in the year 366 and so far it has a history of more than 1600 years. art works of this treasure house cover architectural designs, sculptures and murals

    位於敦煌城東南25公里處鳴山東麓的崖壁上,始建於公元366年,歷代修建,至今有1600多年的歷史,莫高窟藝術由建築,塑像和壁畫三部分組成,現保留洞窟492個,壁畫45000多平方,彩塑像2415身,是世界現存佛教藝術的寶
  5. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、嶺、上埔及雁田的抽水站,加高深圳水主壩1,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  6. Among the 130 debris flow valleys, dazhai gully suspends high on the up range of baihetan hydropower station, with an altitude over 970 m and a drop more than 350 m. gravels, mud and flood in this valley brings the construction site in great danger. 3 kilometers upriver from the mouth of dazhai gully, lies the haizi gully, which is also frequented by debris flows, but will be taken as the dumping site for the construction

    區130條泥石流溝中大寨溝以溝口海拔970餘的高程和350餘的落差高懸于白鶴灘水電站的大壩上方,其溝內泥石流帶來的礫石、泥與洪水直接威脅著電站建設工地和樞紐的安全;緊鄰大寨溝溝口上游約3km的海子溝則為一條泥石流活動頻繁的溝谷,因其出口將作為水電站建設的棄渣場地,流域內的泥石流活動關系著水電站建設中棄渣場的安危。
  7. The transport was, on the 22nd of october, going from the village of mikulino to the village of shamshevo

    十月二十二日運輸隊從林納村出發,當天前方宿營地是姆舍沃村。
  8. Six cossacks had been left behind, two versts from mikulino, where the wood bordered the road. they were to bring word at once as soon as any fresh columns of french came into sight

    游擊隊在林納和姆舍沃的兩端布置了監視崗哨,在林納村后兩里路,森林靠近大路的地方,布置了六名哥薩克,只要一有法國軍隊出現,就立刻報告。
  9. On the left side of the road between mikulino and shamshevo there were great woods, which in places bordered on the road, and in places were a verst or more from the road

    林納到姆舍沃沿途左邊是大森林,有的地方森林臨近大路旁邊,有的地方離大路有一里路或一里多路。
  10. Measures were taken in structure designing to enlarge the discharging capacity of the spillway. in non - structure designing, the telemetric system was designed for forecasting the runoff and flood by monitoring the rainfall and water level of river station, and a warning system was designed to avoid downstream people from the dangerous situation of man - made flood

    通過劃分取水口上游淤積、取水口淤積和流態、過機泥三個子系統,對三個方案的二維計算結果採用模糊集理論優化分析,結論是155方案,即洪水來臨時把水位降到64方案為最優方案。
  11. It is proposed to construct a sand sliding field according to landform of the hill, covering an area of 3, 500 m 2

    依據山勢,在二南岸旅遊路西側建一個滑場,佔地面積3500平方
分享友人