系桿拱 的英文怎麼說
中文拼音 [xìgǎngǒng]
系桿拱
英文
tied arch-
The results indicate that fiber grating strain sensors are able to monitor the tension status about reinforced concrete bowstring arch bridge effectively
應用結果表明:光纖光柵測力傳感器可有效監測鋼管混凝土系桿拱橋系桿的受力狀況。Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge
系桿拱橋鋼管拱內混凝土的壓注施工工藝研究New architecture is provided for the strutural form of single rib trunk section bowstring arch bridge with major span and lower strutural high, nd i organized the first such type of design project
提出了適用於較大跨度、較低結構高度的單肋箱形截面系桿拱的結構形式,並已組織完成了首項設計。This paper is mainly concerned with the structural characteristics and research process of fiber grating strain sensors, successful applications of strain sensors in the bowstring arch bridge, particularly the tie bar cable replacement
文中介紹光纖光柵測力傳感器的結構特點和研究過程,及其在系桿拱橋換索施工中的成功應用。By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad
本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路運河橋(下承式鋼管混凝土系桿拱橋)從方案比選到結構設計和計算、驗算的全部過程,以及施工中的要點,本橋內力計算採用平面桿系有限元計算程序, (交通部公規院的《橋梁設計綜合計算程序》 ( bricas4 . 0 ) ) ,並採用空間有限元程序( brcad2 . 0 )進行驗算。Only 1, 000, 000 vehicle crossings produced significant cracking in the floor beams of the tied arch span and in the plate girders of the approach spans.
僅通過1,000,000輛車就在系桿拱的橫梁中以及引橋的板梁中造成明顯的開裂。Construction monitring for steel tube concrete arch bridge
鋼管混凝土系桿拱橋施工監測Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly
本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管拱肋兩點整體吊裝的結構受力進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。Lateral buckling load of tied - arch bridges with transverse braces
有橫撐系桿拱橋的側向穩定承載力Abstract : non - plank construction method of bottom - supported tied arch bridge makes possible of uninterrupt or short time in terrupt of navigation, having very high social and economic benefits
文摘:下承式系桿拱橋無支架施工可以做到通航河流的不斷航或少斷航,具有很大的社會、經濟效益。Asymmetric construction of steel pipe concrete arch rib tied arch bridge
鋼管混凝土拱肋系桿拱橋不對稱施工Construction of main arch ribs in half - through reinforced concrete tied arch bridge
中承式鋼筋混凝土系桿拱橋主拱肋施工Construction technique of back pouring of tie rod arch bridge arch rib steel pipe concrete
鋼管混凝土系桿拱橋拱肋混凝土倒注施工技術Fem stress analysis of springing joint for cfst and rigid frame tied through arch bridge
下承式鋼管混凝土剛架系桿拱橋拱腳有限元應力分析This paper presents a study of the requirements of tied arch bridge constitution and construction from the perspective of design in relation to the specific requirements of non - plank construction
本文針對無支架施工的具體要求,對系桿拱橋的構造要求及施工措施進行設計研究。Construction technology for the rigid frame tied arch of jinghang canal extra large bridge
京杭運河特大橋主橋剛架系桿拱施工技術Study on non - plank construction method of tied
系桿拱橋無支架施工方法研究Dynamical load test of a concrete filled steel tubular arch bridge
鋼管混凝土系桿拱橋動荷載試驗Dynamical load test of a concrete - filled steel tubular arch bridge
鋼管混凝土系桿拱橋動荷載試驗Study on effective prestressing forces under anchorage of tied - arch bridge
系桿拱橋系桿錨下有效索力研究分享友人