系泊設備 的英文怎麼說

中文拼音 [shèbèi]
系泊設備 英文
mooring arrangement
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 泊名詞(湖) lake
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪圖環境模塊主要針對客船總布置圖繪制的特點來完成比例、線型、圖幅和圖框的置;客船總布置圖圖庫模塊主要完成圖庫的建立和擴充、圖庫的查詢以及圖塊的輸出;局部艙室參數化計模塊採用參數化技術完成對局部艙室圖形的自動修改以及交互計;客船規范幫助模塊則集中了一些武漢理工大學碩士學位論文客船繪制規范,如錨系泊設備、駕駛室、乘客艙室及行李的放置、脫險措施及乘客定額等規范。
  2. For different amounts of equipment, characteristic values of the system such as warehouse leisure time, port leisure time, freight time, freight amount, warehouse utilization, port utilization, van utilization are got

    對不同的配置如倉庫數、車輛數、位數進行了模擬試驗,得出相對應的一些統特徵值,如倉庫空閑時間、碼頭空閑時間、運貨車次、運貨量、倉庫利用率、碼頭利用率、起重車利用率等。
  3. Then the paper dissertates theory of parts measurement and its exercise in measurement and repair of waterway fixed assets, bases the measurement of the fixed assets on the parts, and distributes value of the vessel to hull, shafting and screw propeller, telecom facility, air - conditioning system, electric system, main - engine and subsidiary engine system, and so on. the following expenditure should be capitalized : ( 1 ) adding new components ; ( 2 ) replacing the current components, and all other expenditure be expensed

    集中闡述了船舶應按照船體、靠統、主輔機統、螺旋槳與軸、空調統、電氣、電信、起貨統、救生統等主要部件進行計價;在修理支出中,應將符合下面兩個條件的支出項目予以資本化: ( 1 )增置新的部件, ( 2 )現有部件的重置。
  4. If the double - deck car park is installed in the open area, the equipment including the electrical components should be of a design suitable for outdoor environment

    如在露天地方安裝雙層統,其計包括電氣組件等的必須適合在戶外環境使用。
  5. Since 1971, harbour and marine engineering pty ltd has produced and devised : berthing accommodation, docking system and supervisory control system used on the haven, wharf and sea oil industry worldwide

    澳大利亞港口海洋工程公司自1971年起就在世界范圍內生產和計:港口、碼頭和海上油氣工業所用的、船舶靠統和監控統。
  6. General disposition and design rules of mooring equipment for sea - going ship

    海船系泊設備配置計通則
  7. Article 15 the plan for determining the routes for laying submarine cables and pipelines beyond the petroleum exploitation zones in order to exploit marine petroleum resources shall be submitted to the competent authorities prior to the examination and approval of the overall plan for the exploitation of oil ( and gas ) fields ; and the competent authorities shall give approval after consultation with the competent state authorities for energy resources

    在海洋石油開發區內鋪平臺間或者平臺與單點間的海底電纜、管道,所有者應當在為鋪所進行的路由調查、勘測和施工前,分別將本規定第五條、第六條規定提供的內容,報主管機關案。
  8. Fitting out all newly purchased vessels with advanced cabin facilities including thermostatic air - conditioning, washrooms for the disabled and wheelchair spaces

    新購置的高速雙體船配先進施,包括全天候空氣調節統傷健人士洗手間及輪椅停位置等
  9. It also maintains aids to navigation and mooring buoys for ocean - going ships, manages two cross - boundary ferry terminals and administers eight public cargo - working areas. the department s web site

    該處又維持輔航和遠洋船舶浮泡,並管理兩個跨界客運碼頭和八個公眾貨物裝卸區。
  10. The closed parking equipment is set with fire - fighting system by auto - checking and warning to release the co2

    封閉式有自動檢測報警並快速釋放的co2滅火統。
  11. Examine arrangement and installation of mooring and towing equipment whether is correct, and whether is easy to use and will cut the cable

    檢查和拖曳的布置與安裝是否正確無誤,是否易於使用和是否會發生有割損纜繩等情況。
分享友人