結構施工圖 的英文怎麼說

中文拼音 [jiēgòushīgōng]
結構施工圖 英文
structural working drawing
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Objectarx software kit is used for working drawing. drawing block classes are designed for drawing. when the result of the data computing is passed into painting block, the drawing block objects are created and the objects are added into system graphic database, thus the working drawing is auto _ drawn

    同樣,對繪程序的開發,也是先定製了一系列塊類,整個就由這些塊類成;在類定製完畢后,將計算程序的計算果傳入繪程序中,然後創建塊類的對象,將這些對象加入系統形數據庫,自動生成
  2. From the introduction of the structure and characteristic of dcs, the analyzing in process and control peculiarity of huaxin type cement kiln and the analyzing in the ordinary forms of computer control system in the cement plant, to determine the feasibility of application of the dcs in computer control system of huaxin type cement kiln ; introduced the structure of the system hardware, constitutes and characteristic of the industrial network, the characteristic and the performance in industrial control system of the software system ; illuminated the whole course of the design and the application of simatic s7 - 300 programmable controller in the industrial producing process profoundly : the protraction of a control flowchart ; the confirmation of the control scheme in every cell ; how to workout a table of the all controlling and measuring dots in the control system ; how to set up a plc control project ; the configuration of the hardware and the network in project ; illuminated the course of how to program the plc control program in detail ; how to establish a connection between the plc and the programmer ; how to download the configuration and the program of the plc project ; the configuration of control center software simatic wincc ; the whole course and the methods of the control system debugging ; illuminated the essential in the course of the design in project and program ; illuminated the problem and its respondence maybe encountered in the project ; illuminated the superiority of the new control system in inspecting, operating and its stability ; discuss the development of the computer control system in the application of the huaxin type cement kiln

    從介紹了dcs的、特點和分析華新型水泥窯的藝控制特點及當今在水泥窯計算機控制系統上採用的幾種常見形式的比較出發,分析了在華新型水泥窯應用dcs的可行性;詳細介紹了系統硬體、網路組成及特點、所採用的軟體體系的特點及其在業控制應用中的性能;深入詳細地說明了西門子s7 - 300可編程序控制器在華新型水泥窯控制上應用及設計的全過程:控制流程的繪制;單元控制方案的確定;系統控制測點表的編制; plc控制項目的建立;項目硬體及網路的組態; plc控製程序的編制過程並詳細說明了控製程序的編制思路; plc與編程器連接的建立; plc項目組態及控製程序的下載; wincc監控軟體的組態;控制系統的調試過程及方法;對設計和使用的要點及系統調試時應注意的問題進行了說明;對項目的實后的華新型水泥窯控制系統在操作和控制上及其在系統易維護性、系統穩定性上的優勢進行了說明並討論了華新型水泥窯計算機控制系統的發展方向。
  3. Shop drawings design in structured cabling project should ascertain cabling equipments and cables " routes according to design criteria and user ' s demand, and should produce firstly needs table of equipment and material quantity

    化布線程的設計需要根據設計規范和用戶需求確定系統各組件及布線路徑,同時需要生成主要設備和材料用量報表。
  4. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體程情況,採用2d - 3d -有限元分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量、位移分布( ux 、 uy )以及應力等值線色譜( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的程設計和提供參考依據。
  5. Abstract : the system, in the span - by - span construction of brid ge, willexperience three kinds of shifts from the state of simple beam to the continuous state, from overhanging beam to the continuous beam and from few - spans continuous beam to required degree span by span. meanwhile, structural calculatin g graphics and the internal force are changing with the three shifts

    文摘:在橋梁程逐孔過程中,體系將發生由簡支梁狀態到連續梁狀態,由懸臂梁到連續梁,由少跨連續梁逐孔延伸到所要求的體系三種轉換,同時計算式和內力也發生變化。
  6. In this study, sts - - the steel construction design module of pkpm, a software program of china " s institute of the construction science - - is employed to create the construction model in order to study the construction of the supporting seat. a mechanical analysis of the variant arched girders was implemented, with the result that consturction documents meeting mechanical requirements were designed for the hinge support, the roller support and the steel girders

    本文採用中國建築科學研究院pkpm軟體的鋼設計模塊sts ,從建模入手,根據規范要求研究了支座的造形式,通過對變異拱梁的力學分析,設計出符合力學模型的鉸支座、滑移支座和變異拱處鋼梁的
  7. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建築產品價格與程造價、程價格是如何界定的、比較建築產品的計劃價格、浮動價格與市場價格的含義,搞清楚程造價的成和建築安裝程費用的成以及竣算價格與決算價格的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計算依據和成內容,從招標投標的設計機制的功能和實招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的預算方法與招標投標之間存在悖論,程量清單計價的推行是對建築產品市場價格形成改革的推進,也是建築產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設程量清單計價規范》具有推進建築市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。
  8. We take architectural plan design, structure construction drawing optimization as well as spreading the building new technology, the new material consultation and application as our main business

    怡合天盛>以建築方案設計、結構施工圖優化以及建築新技術、新材料咨詢和推廣應用為主要業務。
  9. Owing to reinforcing steel bar is expressed to adopt indirect method in " plane method " construction drawing, whole information of reinforcing steel bar can be confirmed according to the label information and combining criterion construction drawing while statistics engineering quantity

    由於在「平法」中採用間接的方法表達鋼筋,因此統計鋼筋程量時必須根據平面中的標注信息並合標準造詳才能確定鋼筋的完整信息。
  10. Owing to reinforcing steel bar is expressed by adopting indirect method in " plane method " construction drawing, whole information of reinforcing steel bar can be confirmed according to the label information and combining criterion construction drawing while statistics engineering quantity

    由於在「平法「中採用間接的方法表示鋼筋,因此統計鋼筋程量時必須根據平面中的標注信息並合標準造詳才能確定鋼筋的完整信息。
  11. Sichuan jiaoda civil engineering consultancy co., ltd is mainly engaged in examination of construction design documentation for road, bridge and tunnel projects, preparation of project feasibility study report, engineering consultancy and stress calculation and analysis for various large structures

    四川交大土木程咨詢有限公司,主要從事道路、橋梁、隧道等程的設計文件審查:程可行性研究報告編制;程技術咨詢及各類大型的受力計算與分析。
  12. Visual programming of the bscas ( bridge structure constructional analysis system ) is realized, the mechanism of establishment and discretization of diagrammatic drawing of bridge structure has been analyzed in details with the theory of mechanics and finite element method. at the same time, theory, function and applicability of the program have also been discussed in the paper

    編制了bscas大跨度橋梁分析軟體,從力學和有限單元法原理對橋梁計算式的建立和離散化原理做了較為詳盡的剖析,對程序的編制原理、功能以及適用范圍做了詳細的說明和討論,提出了一些自己的認識和觀點。
  13. This recent restoration project was indeed a challenging and difficult task. one of the prerequisites was to make a precise recording of king law ka shuk before restoration so as to provide the specialists with a thorough understanding of the hall s history, original materials, as well as design and functions of the building. the office had therefore commissioned guangdong provincial institute of cultural relics and archaeology to conduct a detailed cartographic survey and to produce working drawings for the restoration project

    是次修復程可算十分艱巨和富挑戰性,為了確保敬羅家塾在全面修補之前有精確的紀錄,以及讓進行修繕程的專家對家塾的歷史、建築物料、設計及功能有更深入的了解,辦事處特別聘請了廣東省文物考古研究所的專家來港,為敬羅家塾進行全面測量,以及繪制詳盡的測繪和修復
  14. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    程」一詞應指由開發管理人和分包商根據本合同的規定和書面授權書執行的程、設計(包括但不限於初步設計、擴初設計以及深化設計的準備) 、(包括但不限於前期作、現場布局、回填土程、次程、市政程、地上程、安裝和測試)及管理服務,該等服務可根據本合同的規定被不時修訂,並包括所有的設計、紙、計劃、手段、方法、技術、序和程序以及,除非合同中有相反規定,所有的材料具、設人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設
  15. The main contents are as follows : 1. this paper discusses the structure of cad system. according to the design process of the plane gate, this paper combines the structure design, special fem modeling and working drawing and calculation description in pgcad system

    主要研究內容如下: 1 、研究探討了cad的系統;根據平面閘門的設計過程和特點,採用集平面設計? ?有限元建模? ?繪制? ?計算說明書生成於一體的設計方法。
  16. The main contents are as follows : l. this paper discusses the structure of cad system. according to the design process of the miter gate, this paper adopts parallel structure to combine the plain structure design, spacial fem calculations and working drawing in rzmcad system

    主要研究內容如下: 1 、研究探討了cad的系統;根據人字門的設計過程特點,研究採用了集平面設計? ?空間有限元分析? ?繪制於一體的并行設計方法。
  17. Then a dynamic visualization software - - afterdraw, which aims at 2d elastic - plastic fem, is programmed. afterdraw is capable of drawing the deformation figures of material, the regions of plasticity and the regions of tension distributing figures, primary stress vector figures and primary strain vector figures. besides, atterdraw could realistically dynamically simulate the deformation of the whole process of construction

    在此基礎上,研究了針對二維彈塑性有限元的動態可視化后處理軟體afterdraw , afterdraw能夠繪制基坑程各步變形、塑性區和受拉破壞區分布、主應力矢量和位移矢量, afterdraw還能夠逼真地動念模擬基坑程整個過程變形情況。
  18. It is affected by many factors, such as construction method, creep secondary internal forces, secondary internal forces caused by exerted indeterminate structure and so on ; the other is in the working drawing of the prestressing cables

    對其中任一序,尤其是超靜定,其所配預應力束筋又導致內力重分配,因而需要反復調整,直到滿足要求;二是在的繪制方面。
  19. The data used by calculation program and post - processing are formed by dialog boxes, and fed back by figure. a finite element program which considers the influence of axial deformation can analyze the prestressed concrete frame structure, then the structure is designed according to the code of concrete structure gbj10 - 89. post - processing can give the result of calulation by text file and graph, and plot construction drawings in autocad

    前處理模塊通過對話框採集數據來建模,並利用形反饋建模果;計算核心利用考慮了軸向變形的桿系有限元程序計算荷載效應和預應力效應,並按《混凝土設計規范》 gbj10 ? 89計算承載能力極限狀態和正常使用極限狀態;后處理模塊通過文本文件和形顯示來完成果查詢,並直接在autocad環境下生成
  20. Based on the characteristics of the design of ocs, combined with development trends of ocs cad system and the rich experience of the author, the paper gives a thorough presentation of the design method of ocs cad system in five different chapters : chapter one gives a brief introduction of the structure of ocs cad system, meanwhile it shows the functions of each sub - system in detail ; chapter two and three give a thorough explain of the technology of ocs cad system and its application on windows98 and latest operating system ; chapter four expounds the data interface between the ocs design and oter related fields ; chapter five, also the last chapter, summarizes the technology of ocs cad system and analyzes its application in the future

    本論文從接觸網設計特點、組織方式和勘測設計cad一體化發展趨勢,分五章對接觸網平面cad技術實現方法進行了詳細介紹。第一章,簡要介紹了接觸網平面布置cad系統的成及功能;第二章和第三章,以代表性區間和隧道為例,詳細闡述了在windows98及以上操作系統中接觸網平面cad技術的實現方法;第四章,論述了接觸網專業平面設計與其它專業的數據介面cad技術實現方法;第五章,對接觸網平面cad技術的實現方法進行總,並對其發展趨勢進行了展望。
分享友人