絕熱升溫 的英文怎麼說
中文拼音 [juérèshēngwēn]
絕熱升溫
英文
adiabatic heating-
The temperature rise at the center of a massive concrete wall is calculated by using the adiabatic rise of temperature and heat conduction equations of concrete based on the equivalent time, and considering effects of temperature on the hydration heat reaction ratio and creep characteristics of early - age concrete
摘要基於等效時間的混凝土絕熱溫升、熱傳導方程,考慮溫度對早期混凝土水化熱化學反應速率和徐變特性的影響,計算了大體積混凝土墻中心的溫升。The factors that probably leads to cracks are put forward based on the analysis, which in turn are : the deformation of surrounding rock and the deformation of concrete volume and the pelter of air temperature and thermal insulation temperature rise and the thickness of liner and cooling pipe
通過分析得出了導致裂縫的幾種可能原因依次為:混凝土的圍巖變形、自生體積變形、氣溫驟降、絕熱溫升、襯砌厚度和冷卻水管等,為今後類似工程提供理論依據。In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method
該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered
論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered
計算中考慮了混凝土的絕熱溫升、彈性模量、徐變度和自生體積變形隨齡期的變化以及分層澆築、夏季停工、外界氣溫變化、表面保溫、通水冷卻及分期蓄水等因素對壩體溫度應力場的影響。The change of adiabatic temperature rise along with age and the effect on temperature field of dam body made by pouring lift by lift, work suspension in summer and water storage are considered in the analysis
分析中考慮了混凝土的絕熱溫升隨齡期的變化和分層澆築、夏季停工及蓄水對壩體溫度場的影響。Spray - applied fibrous thermal insulation for elevated temperature
升溫用的噴制纖維絕熱材料的規格The research of this text is about stopping " alkali - aggregate reaction ", reducing concretes exothermic peak, controling the internal concrete adiabatic storage and using the microexpansivity of magnesia to make up the shrinkage production in the later harden
本文從防止「堿集料反應」 、降低水泥水化放熱峰、控制混凝土內部絕熱溫升和利用mgo微膨脹補償水泥石硬化後期產生的收縮等方面進行研究與探討。It adopted after years of use proved to be totally reliable, professional design, transistors chassis grounding professional design, large transistors allow direct contact cooling unit and do not have to insert the middle of mica insulation film, thermal capacity increases promoting - - warming is the burning of the power amplifier transistors number one killer. professional design significantly improve the heat dissipation problems so as to enhance the reliability of the power amplifier
它採用了經過多年使用證實是完全可靠的一種專業設計,電晶體機殼接地的專業設計,讓放大電晶體直接接觸散熱片而中間不用加插絕緣用的雲母片,加促散熱能力? ?升溫是燒毀功放電晶體的頭號殺手,專業設計大大改善了散熱問題從而提高了功放的可靠性。The influence of insulation effect and resistance property of the cryogenic system on the temperature rise was discussed, the formula of flow temperature rise and optimal flow rate was deduced, the relationship among the flow rate, pipe diameter and flow temperature rise was analyzed and the way to determine flow rate and pipe diameter was introduced
摘要論述了低溫系統絕熱性能和流阻特性對液流溫度的影響,推導了液流溫升及最優流速公式,分析了流速和管徑與液流溫升的關系,提出了確定流速和管徑的方法。In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered
論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升過程及壩體材料分區、水庫分期蓄水和環境溫度變化等因素對壩體溫度場的影響。Cryogenic vessels - transportable vacuum insulated vessels of not more than 1000 litres volume - part 2 : design, fabrication, inspection and testing
低溫容器.容量不超過1000升的可運輸真空絕熱容器.第2部分:設計生產檢驗和試驗Adiabatic temperature rise
絕熱溫升The penetration process can be treated as adiabatic process, but the heat effect is not notable
侵徹過程可視為絕熱過程,但絕熱溫升不顯著,材料依然表現為強化。Plastics - phenolic resins - determination of the pseudo - adiabatic temperature rise of liquid resols when cured under acid conditions
塑料.酚醛樹脂.測定可溶酚醛樹脂在酸性條件下凝固時假絕熱溫升Also the correcting rules of three kinds of common adiabatic temperature rise of concrete were researched. 2
並對三種常用混凝土絕熱溫升計算公式的修正規律及時間步長與精度的關系等問題進行了研究。In accordance with the water tunnel that liner have cooling pipe, thermal insulation temperature rise model adopt difference expression during its through or not water phase, and optimization back analysis of parameters is carried out
針對本工程引水洞襯砌內布置有冷卻水管,對絕熱溫升模型在通水前後採用了不同的表達式,並分別對其進行了優化反演分析。In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project
溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。Combining burning and heat exchange as a whole, this furnace adopts the novel indirect heating technology of performing heat exchange at high temperature position of the furnace, inside which, smoke and air flow separately, heating has no contamination, thermal efficient reaches 60 - 75 %, therefore, it features speedy temperature rise, compact dimension, convenient installation, reliable operation and lower cost ( only half of that by boiler heating system )
該爐集燃燒與換熱為一體以爐體高溫部分進行換熱的最新間接加熱技術,煙和空氣各行其道,加熱絕對無污染,熱效率高達60 - 75 % ,升溫快,體積小,安裝方便,使用可靠且價格低,與一噸鍋爐相比,該加熱系統只相當于鍋爐加熱系統價格的一半。Under different load, when we apply this software to any time, region and cooling way, we can get the hottest spot increment and aging rating. to manufactory, the software means sounder thermal design, which will meet the load, putted forward by user, while to user, the software equal to a master who can help them decide the capacity rating of the transformer, which will fit the load. by using the software, the potential danger and the waste, caused by unfit load choice may be avoided
研究開發了計算乾式電力變壓器負載能力的計算軟體,可對于各種絕緣結構,各種冷卻方式和任一地區、任一時間下運行的變壓器在不同運行載荷下的最熱點溫升絕緣老化率進行分析和計算,同時利用該軟體製造廠可以依據用戶提出的運行負載量給出相應的熱設計方案,用戶可根據運行負載情況利用軟體計算所需變壓器的額定容量,避免額定容量選擇不當造成隱患和浪費。分享友人