給排水工程 的英文怎麼說
中文拼音 [gěibèishuǐgōngchéng]
給排水工程
英文
water supply and sewerage works- 給 : 給Ⅰ動詞1 (送對方某物; 使對方得到) give; grant 2 (用在動詞后 表示交與 付出) pass; pay 3 (叫; ...
- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 排水 : drain off water; drain away water; dewatering
-
Cannula compensator is comprised of body tube, compensation tube, flange and gadket. the product is applied in the drainage engeineer, providing great convenience to the detachment and installation of water tower and water meter of pump room. and it plays a role to resolve the compensation issues caused by temperature difference for long pipeline. sgd, axial displacement., , ,
套管式伸縮器是由體管伸縮管壓蘭密封圈構成的,此產品用於給排水工程,它為城鎮自來水塔泵房水表及閥門安裝拆換提供了極大的方便,以及對長距離管道用溫差引起的伸縮問題,起到了良好的填補作用。Through investigating the statistic data of supplying and utilizing water past years, the actuality of supply engineering, the actuality of drain engineering and waste water disposal in tangshan urban, this study analyses the available water quantity cisborder and outside and water environmental actuality in order to afford basic data for the optimization distribution of limited water resources in cantonal city
如何使得有限的水資源發揮最大效益即稱為亟待研究的關鍵問題,因此本論文針對唐山市水資源優化配置做了如下研究。通過調查唐山市歷年供用水統計資料,給水工程現狀、排水工程現狀以及污水處理情況,分析市區可利用的境內外水資源總量和水環境現狀,為市區有限水資源的合理規劃配置提供現實基礎。Fire protection of buildings is the most important of buildings water supply and drainage engineering design. fire hydrant system is the basic and extensively adopted technique of buildings fire protection at present in our country
建築消防是建築給排水工程設計中最重要的部分,目前在我國室內消火栓滅火系統又是建築消防最基本、普遍採用的方式。1 year or more experience in plumbing system
一年以上從事給排水工程工作經驗。Code for structural design of water supply and sewerage engineering
給水排水工程結構設計規范Specifications for the design of water supply and drainage structures
給水排水工程結構設計規范Structural design code for pipelines of water supply and waste water engineering
給水排水工程管道結構設計規范Appraisal criteria for antiseismic outdoor water supply and drainage tacilities
室外給水排水工程設施抗震鑒定標準Plumbing and drainage team : specialized in design of water supply city water, di water, cooling water, etc
給排水設計組:給水工程自來水純水冷卻水等排水工程廢水處理工程室外給水排水工程及消防給水工程。Abstract : the drinking water and hot water supply, the drainage of wastewater, rain water system and various fire control water systems of venice hotel in shenzhen city are presented
文摘:威尼斯酒店是以水為主題的旅遊酒店。介紹了該項目給排水工程設計中的給水、熱水、排水、雨水系統,以及所涉及的各種消防系統。Air system construction - total 670rt, ice - storage construction - 3, 824 ton hr, water
儲冰工程3 , 824ton hr給排水工程Construction weak electricity construction and fire system construction - fm 200 system
給排水工程弱電工程消防工程fm 200系統The teaching reform and practice of four - year program in water supply and drainage engineering
給排水工程本科專業教學改革與實踐The construction of the course system of water supply amp; drainage engineering and the design of web page
給排水工程專業課程體系構造與網頁製作Shapes, dimensions and geometrical values of sewers, drains and pipelines for water and waste water engineering
給排水工程的污水管排水管和管道的形狀尺寸和幾Electric and pneumatic construction, weak electricity construction, fire system construction, air system construction, and water discharge - supply construction
電氣工程弱電工程消防工程空調工程給排水工程Supply and drainage project of beijing hotel adopting our high quality valves wholly, which operating mode is good, running well and no maintaining record
北京飯店給排水工程全部採用我公司提供的優質閥門,工況良好,使用正常,無維修記錄。Construction content : electric and pneumatic construction, fire system construction, weak electricity construction, water discharge - supply construction, and monitor construction
工程內容:電氣工程消防工程弱電工程給排水工程監控工程Electricity and pneumatic construction - with 15000kw generator capacity, 4 units, with transformer capacity 18525kva, total 14 units, water discharge - supply construction, weak electricity construction, monitor construction, and air system construction - total 1060rt
電氣工程發電機容量1500kw 4臺變壓器容量19525kva共14臺給排水工程弱電工程監控工程空調工程共1060 rt2500 kva transformer capacity, 5 units, electric power equipment capacity 4, 900kva, monitor construction, total 2, 000 spots, clean room construction - clean room class 1, 000, air system construction - total 2, 396 rt, ice - storage construction - total 12, 000 ton hr, water discharge - supply construction, fire system construction, weak electricity construction, steam construction, and nurse call
無塵室工程無塵室等級class 1 , 000空調工程共2 , 396rt儲冰工程共12 , 000ton hr給排水工程消防工程弱電工程蒸氣工程nurse call分享友人