給水管道 的英文怎麼說

中文拼音 [gěishuǐguǎndào]
給水管道 英文
feed water piping
  • : 給Ⅰ動詞1 (送對方某物; 使對方得到) give; grant 2 (用在動詞后 表示交與 付出) pass; pay 3 (叫; ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 給水 : [機械工程] feedwater; water supply給水泵 feed pump; 給水量 confluent; 給水能力 capacity of water ...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Compound quick air inbreathe - release valve for water supply pipeline

    給水管道復合式高速進排氣閥
  2. After analyzing the merits and shortcomings of the current methods for leak hunting of municipal water supply network and inducing the reasons that cause the pipe leakage, this thesis pointed out that the water supply network should be evaluated synthetically by means of reliability theory

    本文分析了現有網檢漏方法的優缺點,在歸納了導致漏損的各種原因的基礎上,指出應該利用可靠度理論對網進行綜合評價。
  3. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣線、、設備安裝為2年; 5 、裝修工程為2年。
  4. The salt water system drawing for the kowloon south no. 2 pumping station and its reservoir andor the latest planning report would be useful to our understanding of the proposed salt water reticulation to the north of the development area via the pcwa. may we obtain a copy of them

    為了解經公眾貨物裝卸區連接發展區北面的擬議鹹網,九龍南二號海站及其配庫的鹹系統繪圖及或最新規劃報告對我們甚為有用,可否我們一份復本?
  5. With regard to the second phase water supply pipe project of no. 4 dongguang waterworks, an introduction was given to the selection of pipe jacking system, measures for resistance alleviation, application of intermediate jacking room, and control of axes in jacking construction of long distance steel pipe with large caliber, these may provide the reference for the construction of resembling project

    摘要結合東莞市第四廠二期給水管道工程過107國段的頂施工,介紹了大口徑鋼進行長距離頂進施工時頂機的選型、減阻措施的選用、中繼間的運用、軸線控制等問題,可供以後同類工程參考和借鑒。
  6. According to media reports, increasing numbers of disenchanted office workers are leaving their jobs to wrestle with incontinent pipework

    根據媒體報,有越來越多心灰意冷的辦公室工作人員正拋棄自己的職業,擼起袖搶險。
  7. By this way, however, the working pressure of the fire water system will be at higher level in case of the central stabilizing high pressure system and undesirable consequences related to the pressure - acceptance of the pipe and the joints shall come forth

    而在集中穩高壓系統中,這樣確定的穩壓泵揚程及設定壓力值,往往使消防網始終處于較高壓力工況,因而使網內壓與及其介面的承壓能力這一對矛盾趨于突出。
  8. Periodical inspection and maintenance of water supply system, supplying pipe, tape and tank, drain pipe

    裝置的線、龍頭、箱及排的定期檢查和維修。
  9. Rubber seals - joint rings for pipelines for hot water supply, drainage and sewerage pipelines up to 110 c - specifications for the material

    橡膠密封件.溫度為110及以下的熱和污用連接環.材料規范
  10. For example, the condenser algorithm considered the trouble condition such as the leak of tube, fail of seal in vacuum system, the lower shaft sea - ting steam pressure, pollute of tube, the high water level of hot - well. the heater algorithm considered the trouble condition such as the leak, pollute of feed - water pipe and high water level of heater

    如凝汽器演算法考慮了銅泄漏、真空系統密封不嚴、軸封蒸汽壓力低、銅結垢污染、熱井位過高等故障項目,加熱器演算法考慮了給水管道泄漏、給水管道污染、結垢、加熱器位過高等故障項目。
  11. After initial installation, a discharge from the relief valve opening may occur due to inadequate initial flushing of pipe lines to eliminate dirt and pipe compounds

    注:在閉端應用環境,如鍋爐給水管道或冷卻塔補,由於在靜態或無流動期間,供應壓力有所波動,因此安全閥可能發生周期性排放。
  12. Discussions on parameters of techno - economic calculation model for water supply pipelines

    關于給水管道技術經濟計算模型中參數的討論
  13. The analysis and control of noise in the pipeline of the building water supply and drainage

    建築室內噪聲的分析與控制
  14. T he land area planned for nanxiang high - tech park is 12000 mu. today, its infrastructure construction has been completed. water, gas and poewer supply, drainage system, and telecommunication network have all been installed. roads have been constructed and opened to traffic. around the park there are 7 banks, 6 supermarkets, 8 colleges and schools

    南翔園區總體規劃土地面積約12000畝, 「七通一平」基礎設施一步到位:給水管道接通、雨排放疏通、污納入市政網、煤氣聯通、電力系統、電信網路順通、 「四縱四橫」路平坦暢通。
  15. Cleaning and controlling of growth - ring in water pipeline

    給水管道生長環的沖洗與防治
  16. Technical specification for buried un - plasticized polyvinyl chloride pvc - u pipeline of ester supply engineering

    埋地硬聚乙烯給水管道工程技術規程
  17. Technical specification for buried polyethylene pipeline of water supply engineering

    埋地聚乙烯給水管道工程技術規程
  18. Technical specification for buried unplasticized polyvinyl chloride pipeline of water supply engineering

    埋地硬聚氯乙烯給水管道工程技術規程
  19. Application of polypropylene pipe in water supply pipeline system of buildings

    在建築給水管道系統中的應用
  20. Kai jia pe water pipe

    凱佳pe給水管道
分享友人