綜合勘察 的英文怎麼說

中文拼音 [zōngkānchá]
綜合勘察 英文
integrated survey
  • : 綜名詞[紡織] (織布機上使 經線交錯著上下分開以便梭子通過的裝置; 綜片) heddle; heald
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : Ⅰ動詞(仔細看; 調查) examine; observe; look into; scrutinize Ⅱ名詞(姓氏) a surname
  • 綜合 : 1 (歸在一起; 聯合成一個統一的整體) synthesize 2 (不同種類、不同性質的事物組合在一起) syntheti...
  1. This paper conducted the comprehensive discussion and analyses of cupressus gigantean biological characteristic and taxology character, geographical distribution situation, habitat condition and growth condition, research and protection status, made an according addition to the former narration, raised some authors ' opinions and guesses

    摘要對巨柏的生物學特性、分類學特徵、地理分佈狀況、生境條件及生長狀況、研究及保護現狀進行了的論述和分析,並通過實地考測,對一些前人的論述做了相應的補充,提出了一些自己的見解和推測。
  2. The prospect geological disaster geographic information system is based on the visual basic, and make use of mapobject of esri corporation to do then quadratic programming of cis, connected with the mapobject prepotency of geological information system

    地質災害地球物理信息管理與解釋系統是在visualbasic的基礎上,利用esri公司的mapobject軟體進行gis的二次開發,把visualbasic的強大的平臺和mapobject地理信息系統方面的優勢緊密的結在一起。
  3. History case of the geo - technical investigation for the pilot complex building in xiamen harbour

    廈門港引航樓巖土工程實錄
  4. 2. adopt varied exploration method to check up on geologic structure of the all demonstration area

    2 、採取手段進行論證,進一步查清各試驗區的工程地質條件。
  5. So far as the water conveyance project of dahuofang reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned

    摘要主要針對大夥房水庫輸水工程,根據其設計階段的地質成果,同時結施工中已開挖揭露的實際地質情況,對地形地貌、區域構造穩定性、地層巖性、地質構造、水文地質條件、主要工程地質問題等進行了評述,以期關心本工程的人士能對隧洞的工程地質條件有初步了解和認識。
  6. In this paper, in order to improve the design ' s level of supply hot pipes network in our country, a cad software of supply hot pipes network based on the autocad2000 which is used as software platform is developed. the software is applied cad technology, modern design theory and computational technique

    為了提高設計領域中供熱管網設計的效率和質量,本文論述了通過應用cad技術、現代設計理論,以autocad2000為平臺,研究開發一個供熱管網cad系統及其相關的優化計算方法。
  7. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺隧道巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於隧道施工遺留的導洞長期疏排巖溶水,採用地質測繪、物探、鉆探、水文地質試驗等綜合勘察方法,查明地下水通道位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等整治方案。
  8. In order to assess stability of longpan right bank slope in the hutiao gorge, the authors use geophysical method such as csamt to characterize structure and patterns of the slope

    摘要為了查明虎跳峽龍蟠右岸斜坡變形體的形態和結構,從而對其穩定性進行評價,利用地球物理手段做了csamt方法的工作。
  9. According to the data of the report of reconnaissance and applying all kinds of experiential methods, the mechanics parameter is provided for further analysis

    然後以資料為基準,採用各種經驗方法,結現場調查的結果研究了洪崖洞巖體的力學參數,作為數值模擬和工程分析的依據。
  10. Through anatomy of the representative 10 large surveying and designing institutes, it points out several problems of large surveying and designing institutes in personnel structure, distribution system, ownership form, structural organization mode, etc. it also objectively analyzes the situation of surveying and designing institutes to establish international engineering companies to exploit international market. second, the paper makes a demonstration study on the emerging process, main characteristics, organization structure and management mode of international engineering companies

    首先,本文對我國設計單位的情況進行了概述,通過對有代表性的十家大型設計單位的剖析,指出了我國大型設計單位在人才結構、分配製度、資產形式、組織結構模式等方面存在的若干問題,並對目前設計單位創建國際型工程公司開拓國際市場的情況進行了客觀的評價。
  11. Based on abroad consultations and studies on national and foreign related datum, mainly taking shenzhen luohu fracture zone for research object, and by means of analysis on locale monitoring datum analysis, laboratory routine rheopectic testing, finite element numerical simulation and appraisal of gis stability, a few of conclusions can be summarized as the following : ( 1 ) analyzing present and past geological reconnaissance datum and reports of stability appraisal in luohu jiancheng district and synthesizing a mass of crustal stress monitoring datum and huangbeiling faultage f8 monitoring datum, and combining closely with practical engineering activity in luohu district, characteristics of crustal stress distribution is deeply discussed, which has an important guiding meaning for studying region stability and underground structure safety in luohu district

    本文在廣泛查閱、研究國內外有關資料的基礎上,主要以深圳羅湖破碎帶為研究對象,通過現場實際監測資料分析、室內常規流變試驗、有限元數值模擬以及基於gis的穩定性評價,可以得到以下幾點結論: ( 1 )分析了羅湖建成區以前和現今的地質資料、穩定性評價報告,大量的現今地應力監測資料和黃貝嶺f8斷層監測資料,緊密結羅湖建成區的實際工程活動,深入探討了羅湖區的地應力分佈特徵,這對于研究羅湖地區區域穩定性和地下建築物的安全性具有重要的指導意義。
  12. By taking the tenet " quality is life, making perfect design, creating excellent engineering, providing honest service, protecting environment and treasuring life to satisfy the customers, society and staff is always the promise to undertake of us ", our institute is all along in the range of the " comperhensive strength / engineering contract / project management 100 powers " of the project survey and design institutes of our country and " one of the top 10 architectural design companies in china " by the architects regional council asia in continuous three years since the year of 2005

    秉承「質量是生命,精心設計、創優工程、誠信服務、保護環境、珍愛生命,是我們對顧客、社會、員工始終不渝的承諾」的管理方針,我公司的質量、環境、職業健康安全管理體系健全,數十年來一直躋身於全國設計實力、工程承包和項目管理百強單位的行列,自2005年連續3年被亞洲建築師協會評為中國十大建築設計企業之一。
  13. Under the combined action of above - mentioned four factors, the complex rock mass at right bank which consist of two weak rock mass bands and superficial unloading relaxed rock mass came into being

    其相關系數在0 . 85以上。在此定量化基礎上,結現場分類以及水利水電工程地質規范,通過對比,得到研究區巖體質量分級。
  14. This paper tells an evaluation method based on statistical analysis of geology data ? according to the history of geology change and analysis of project geology about the research section of lidu slope of hurong national highway located in south - west of hubei province, based on abundant actual investigation and experimental data, stressing on tracing the history and rules of development of slope change, we divide the data of investigation and test into two classes, one is external physical feature and structural performance, the other is factor of internal and external dynamic environment, following the analysis of mathematics statistical analysis, which points out the proportion of foundation of geology judgement and puts forward a valid identification beacon of stability

    本研究內容是一種以地質數據統計分析為基礎的評價方法。根據滬蓉國道南里渡滑坡研究區段的地質歷史演變結工程地質類比法,以豐富的實際、試驗資料為依據,以追索滑體的演化歷史和發展規律為重點,將滑體的、試驗資料劃分為外部形態與結構性狀和內外動力環境因素兩大類,通過數理統計分析,給出地質判據的權重,提出切實可行的穩定性判別標志。從而對斜坡穩定性提出理的、有說服力的評價。
  15. Based on hydrogeology and engineering geology reconnaissance, this problem constructs groundwater power field and system of chemistry characteristic through comprehensive analysis and research. monitoring groundwater table and water quality by means of choosing representative dike section, the paper appraises and forecasts that the influence to groundwater surroundings by building impermeable wall is or not unhealthy include the lever and the scope

    本課題的特色是在水文、工程地質基礎上,經一個水文年長期水位監測,經分析研究后,建立地下水動力場和化學特徵系統,通過選擇代表性堤段對防滲墻建造前後地下水位和水質進行監測,評價和預測防滲墻建設對地下水環境是否存在不良影響以及影響的程度和范圍。
  16. After re - exploration and careful analysis , it was found that the sand soil under the bottom of the pile and around the pile was disturbed during the construction of cfg piles

    通過驗證並經分析后認為,造成單樁承載力不足的主要原因是施工時擾動了樁底或(及)樁周砂層。
分享友人