綜合試驗室 的英文怎麼說

中文拼音 [zōngshìyànshì]
綜合試驗室 英文
complex laboratory
  • : 綜名詞[紡織] (織布機上使 經線交錯著上下分開以便梭子通過的裝置; 綜片) heddle; heald
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 綜合 : 1 (歸在一起; 聯合成一個統一的整體) synthesize 2 (不同種類、不同性質的事物組合在一起) syntheti...
  • 試驗 : trial; experiment; test
  1. By the large quantity of indoor and field soil mechanics test, this paper investigated physics and mechanics property of xigeda stratum and xigeda compounding filling, profoundly and systematically studied on shearing strength, cbr ( including indoor cbr and field cbr ) and intensity feature of xigeda compounding filling. the new achievement and cognition as follows : ( 1 ) cbr value is decided by moisture content and mudstone content of xigeda compounding filling. the filling material can satisfy minimum intensity standard of express highway when mudstone content is less than some fixed value, ( 2 ) this paper established field cbr standard value which can synthetically evaluate the filling material nature and field compaction degree. ( 3 ) the optimal compacting mean of xigeda compounding filling is hard oscillation first and weak oscillation later, not traditional way which is weak oscillation first and hard oscillation later. ( 4 ) this paper put forward the conception of optimum moisture content in construction different from optimum moisture content of indoor impaction

    本文以昔格達填料強度特徵為研究對象,通過大量的內及現場,從昔格達地層巖組的物理力學性質、昔格達填料的物理性質入手,對昔格達填料的抗剪強度、內承載比及現場承載比特徵進行了較系統地研究,獲得了如下認識及進展:昔格達混填料承載比值受填料含水量及其中泥巖含量的影響,當泥巖含量小於一定值時,昔格達混填料具有較高的承載比值,能夠滿足高速公路對填料的最低強度要求;建立了評判昔格達填料性能及現場壓實效果的現場承載比( cbr )標準;對于昔格達填料而言,最佳的碾壓方式為先強振后弱振而不是傳統的先弱振后強振;提出了與內擊實最優含水量相區別的施工最佳含水量的概念。
  2. It will be widely used for the large - scale plantlets production in the near future. the rapid development of the photoautotrophic micropropagation in china requires integrated environment control and air purification simultaneously. in this study, an environmental control system combined with clean technology was developed to control air condition and lighting environment in a closed tissue culture system under artificial lighting

    針對我國光獨立組織培養迅速發展與組培環境調控技術相對落後的問題,本文採用環境控制與空氣凈化相結的方法來調控組培內的物理環境,並對制的環境控制系統進行了研究,期待為工廠化組培苗生產提供環境調控的方法與硬體設備。
  3. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    收集現有沙漠公路的有關資料,對全國已建沙漠公路進行沙害及其他病害調查,對相關數據和影響沙漠公路路基高度的各種因素進行系統地統計分析;通過野外風沙流場測定,分析適宜風沙流順利通過的路基高度;通過內風洞進行證;結路基穩定性分析、路基高度的經濟性分析,考慮不同等級公路的使用要求,最終提出不同地區不同等級沙漠公路路基填土高度的理高度建議值。
  4. Based on developed experimental testing facility, the shading performances of southing horizontal shading devices, vertical shading devices and integrative shading devices of external windows are measured, the performance parameters including indoor temperature, air - conditioned cooling load and shading coefficient as so on. and the shading coefficient of experimental test results and calculation results based on design standard for building energy efficiency are compared, and the windows5. 2 simulation results are compared also. the measured results are consistent with the calculation results of horizontal shading devices and vertical shading devices

    本文利用研製的建築遮陽性能檢測裝置,對南向水平遮陽板、垂直遮陽板和遮陽板外窗的遮陽性能(包括內溫度、空調耗冷量和遮陽系數等)進行了實,並對遮陽系數的實結果與節能設計標準的計算值以及windows5 . 2軟體的模擬結果進行了比較分析,測結果表明水平遮陽板和垂直遮陽板外窗的遮陽系數與計算結果比較一致,相對誤差分別為2 . 5 %和4 % ,而遮陽板外窗的遮陽系數與計算結果的差值比較大,相對誤差達到10 %以上。
  5. Actual application shows that the reformed laboratory realizes test medium simulation, test process flow universalization, test process automatization and measurement technique modernization depending on the reformed laboratory

    列舉了應用改建后的油氣水處理實進行研究所獲得的5項科研成果。
  6. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及內巖石力學評價水電站大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體收提供依據。
  7. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )水壓致裂法、內巖石kaiser效應和有限元數值模擬計算研究成果,最大水平主應力方向與隧道洞軸線小角度相交,對隧道圍巖穩定性有利;根據現場應力解除法測結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  8. This paper conbined with the indoor test and the scene test road, through the synthetical analysis of the factors of influencing densification effect for the densification thickness of filling stone roadbed. the maximum grain size of fill material, densification machinery and densification frequency et al. advanced a control norm of the maximum grain size and piy of compression, established ration evaluating the control standard of densification quality of filling stone roadbed under overload. comparing with result of indoor test and the scene test road, studied on theory of densification in different kinds of stone material and perfected the control system of the densification of filling stone roadbed under overload

    和現場路的實測數據,通過對填石路基的壓實厚度,填料最大粒徑,壓實機械及壓實遍數等影響壓實效果的因素的分析,提出填石路基的最大粒徑和攤鋪厚度的控制指標,建立定量評定超重載交通下填石路基壓實質量的控制標準,並對照和現場結果,研究不同石料條件下的壓實理論,補充完善了填石路基壓實控制指標體系。
  9. The main tests and researches are as following : to study the ac flashover characteristic of composite insulator in different icing states by imitating tests in multifunctional artificial climate chamber, and analyze the effect of ice amount and icing water conductivity on flashover voltage, put forward a flashover mechanism by analyzing the icing flashover process. to study the ac flashover characteristic of composite insulator in different altitude and icing states together by imitating tests in multifunctional artificial climate chamber, and mainly analyze the effect of altitude ( air pressure ) and ice amount on flashover voltage, and investigate the flashover mechanism. to investigate the effect of high altitude and icing on the hydrophobicity of composite insulators

    本文主要進行了以下研究: 1 )在多功能人工氣候里模擬不同覆冰程度下成絕緣子的交流閃絡特性,主要分析覆冰量和覆冰水電導率對閃絡電壓的影響,並對其覆冰閃絡過程進行機理分析; 2 )在多功能人工氣候里模擬不同海拔高度和覆冰程度作用下成絕緣子的交流閃絡特性,主要分析海拔高度(即氣壓)和覆冰量對閃絡電壓的影響,並進行閃絡機理分析; 3 )研究高海拔和覆冰對成絕緣子憎水性的影響。
  10. Blower performance tester 9. heat exchange unit performance tester

    15 .執行機構綜合試驗室
  11. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京水科院海岸工程廳可行性研究報告,主持並參與該廳的工程設計,在該廳內建有70米長50米寬的大型波浪水池; 4 .編寫了南京水科院「泥沙運動基本規律研究實」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪水槽設計,該水槽建成后,可在風、浪、流作用下進行航道整治和海岸工程的科學研究。
  12. The product was test by synthetic laboratory of chinese petroleum pipeline company pipeline research center. product quality far goes beyond the standard of sy / t4013 - 95

    產品樣經中國石油管道公司管道研究中心,遠遠超出sy t4013 - 95標準,明顯地提高了產品質量和生產效率。
  13. Scii is equipped with an up - to date comprehensive test lab, which can be used to check various parameters for our parts of relays, contractors, transformers and photo - controls

    Scii擁有現代化的,可以完成對繼電器、接觸器、變壓器、光控器等產品的各項技術參數測,確保為客戶提供優質產品。
  14. From experimental result, i preliminarily know that eps is good thermal insulation material because the absorption of water is low and heat insulation is good, it is practicable at preserving temperature field of frozen earth roadbed and bringing frozen disaster under control ; second, according to the analysis of the eps that is applied into practical project, i have studied the practical effect which eps preserve roadbed temperature field, and the influence that was made after building field. i have get that eps can influence moisture content and frozen upper limit, through practical measuring data, i have studied freezing and expanding quantity and melting and submerging quantity during a complete frozen and melting cycle as well as have expanded and proved the practical application effect of eps with some reference significance to deep research of some connected problems. finally, through computer data analysis, setting up the analytical model of finite unit, i have simulated the temperature field of roadbed heat preservation, then expounded and proved that the height of embankment influenced the effect of thermal insulation material

    其一是對聚苯乙烯泡沫塑料( eps )保溫板以及天然路基土層、路堤填料進行了分析,結國內外現在的有關科研成果,確定其各項特徵參數;從結果初步認識到聚苯乙烯泡沫塑料是一種吸水率低,隔熱性好的保溫材料,在凍土路基溫度場的保護和凍害治理方面是可行的;其二通過eps保溫板在現場工程實踐中的應用分析,研究了保溫板在保護路基土層溫度場的實際效果以及修築路堤后造成的影響,保溫板對土體含水量、凍結上限的影響,通過實測資料,研究了在一個完整的凍融周期內整個路基的凍脹量和融沉變形量,論證了保溫板的實際應用效果,對有關問題的進一步研究和相關工程設計具有參考意義;其三,通過計算機數值分析,建立有限元分析模型,對保溫路基的溫度場進行了模擬計算,論證了路堤高度對保溫材料效果的影響。
  15. Finally, this paper brings forward the mix integrated design method of asphalt treated permeable material incorporating the results of structure analyses and tests. and the rational proposal and requirement for pavement subsurface drainage system of test road is suggested

    結構分析與分析的結果,提出了瀝青穩定碎石排水層混料的設計方法,並實際運用於路的結構設計和排水系統設計。
  16. Firstly the present situation of hydraulic fracturing of rock mass was talked about, then, the hydraulic fracturing of rock mass test was carried out with cement mortar ( analogue material of rock mass ) thick tube hollow cylinder through seepage - stress coupling apparatus that was developed by the laboratory of seepage control in hohai. through the analysis of data, the thesis discussed the mechanism of the hydraulic fracturing of rock mass

    首先對巖體水力劈裂研究的現狀作了較為詳細的述,然後應用河海大學滲流實的滲流?應力耦儀對以水泥砂漿為巖石相似材料的厚壁圓筒件進行了水力劈裂,並對結果進行詳細分析,對件水力劈裂破壞機理進行了深入的探討。
  17. Based on the experiment of full - sized cshb walls under lateral and vertical loads, initial crack - resisting stiffen formula was deduced by considering the influence of concrete beams, concrete core columns, structural columns, vertical pressure and window ( or door ). the results calculated from the formula were fit well with the experimental results. by the analysis of displacement at initial crazing, probability statistical mode and its parameters of relative displacement angle were presented

    在介紹和總結本課題的內足尺寸單片墻抗側力性能的基礎上,考慮了圈樑、芯柱、構造柱和墻體正壓力、開門窗洞等因素對抗側剛度的影響,提出了各種因素的初裂抗側剛度公式,與結果具有很好的一致性;結的初裂位移分析,給出了層間相對位移角的概率統計模式及相應的統計參數,提出了小砌塊建築層間位移角的控制標準。
  18. 16. cfd room 17. control panel lab

    17 .控制面板綜合試驗室
  19. The system ensures transformer to " credibility, safety and economy running. by analyzing transformer criterion and picking up the work criterion and test requirement and process of power transformer test ; according to the requirement of " synthesis function, computer structure, screen watch, intelligence management ", the performance and parameter integrated measure system of oilfield power transformer is designed ; according to the demands of transformer test criterion and computer control technique, the computer test methods are worked out ; aiming at the special instance of power company, the online measure of short - test in

    通過分析變壓器標準,整理出滿足電力變壓器的工作標準、要求和步驟;按照「功能化,結構微機化,監視屏幕化,管理智能化」的要求,設計了電力變壓器性能參數檢測系統;根據變壓器標準和計算機控制技術,設計出符微機檢測的方法;對變壓器中的短路的在線測量作模擬研究,說明變壓器在線測量是可行的。
  20. The experimental study, which is the research on manpower lamp - house in the whole - spectrum simulation of solar radiation, is the primary content and the important part on the simulation of many - parameters in the environment

    太陽輻射全光譜模擬人工光源的實研究是多參數環境模擬的的主要內容和重要組成部分。本文的主要研究內容和成果如下: 1
分享友人