緊急制動系 的英文怎麼說

中文拼音 [jǐnzhìdòng]
緊急制動系 英文
emergency braking system
  • : Ⅰ形容詞1 (物體受到幾方面的拉力或壓力以後呈現的緊張狀態) taut; tight 2 (物體受外力作用變得固定...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • 緊急 : urgent; pressing; critical; emergent; pressure; emergency; urgency
  1. It is shown that the proposed refinement approaches have the commonly expected properties : the behaviour of the refined process can be inferred compositionally from the behaviour of the original process and from the behaviour of the processes substituted for actions ; the timed extensions of pomset partially ordered multiset trace equivalence and history preserving bisimulation equivalence are both congruences under the refinement ; the syntactic and semantic refinements coincide up to the aforementioned equivalence relations with respect to a cpo - based denotational semantics

    然而,對于並發統來說,時間指標是一個至關重要的因素,很多現實生活中的並發統都跟時間密切相關,另外,事件在實時並發統中也是常見的現象,在已研究的作精化理論當中事件都僅僅只限於用來模擬超時事件,並且是不能被精化的,這對于很多現實統來說是一個很大的限
  2. This dissertation focuses on the application of the fast controllability of hvdc systems to realize emergency power support to its connected ac system in the presence of large disturbances occurred in ac system, and more emphasis is given to the control strategies concerned with multi - infeed hvdc systems

    利用直流輸電統的快速可控性,實現對交流輸電統的功率支援,其本質就是研究在大擾發生后應對直流統採取何種控策略。
  3. Comments on anti sliding calculation of multi rope frictional hoist

    淺談多繩摩擦提升機配置恆力矩液壓站提升統防滑驗算
  4. Abstract : the paper presents the study on problems of self - excitation , over - voltage , frequency and voltage stability , organizational measures and arrangement in the course of black start and restoration of the system. through simulation of black start on east china power system , above problems are analyzed and solved , it shows that working out strict black start scheme may not only speed up system restoration , reduce outage losses , but also have important significance to emergency release or power system islanding

    文摘:研究電力統黑啟的過程及恢復中存在的自勵磁、過電壓、頻率和電壓穩定、組織措施及安排等問題,並通過華東統黑啟模擬對上述問題進行分析和解決,證明定嚴格的黑啟計劃不僅可以迅速恢復統、降低事故損失,而且對處理狀態或地區性解裂有重要意義。
  5. In the process of emergent brake, relations among brake press, parameters of the entire vehicle and adhesive coefficient between tire and road surface influence the distribution of brake disc friction temperature field greatly

    過程中,壓力、整車參數以及輪胎與路面間附著數之間的關器摩擦溫度場分佈有重要的影響。
  6. Moreover, when integrated with the automatic location identification feature of the emergency telephone system it allows the call - taker to see instantly the location of the fixed - line caller and the incident in caccs3 - core and on the gis map

    另外,第三代電腦輔助指揮及控統配合求助電話統中的自追尋地點功能后,只要來電者使用固網電話,接聽來電的人員就可以在統和地理訊息統的地圖中迅速找出來電者的位置。
  7. A good thought for applying telecommunication system, based on the intelligent optical networks and service networks, combining with the technology of computer ’ s software, can realize many functions such as data sharing, application integrating, service flow controlling, etc. city emergent relation systems ( cerss ) are the systems that integrating many kinds of resources of services, using uniform phone number for receiving calls, handling emergent events or help in one combined action, offering succor for citizen and strongly ensuring public safety of the city

    將智能光網路及智能網與計算機軟體有關技術相結合的統,實現了數據共享、應用集成、業務流程式控等功能,為通信統應用提供了很好的解決思路。城市應統是綜合各種城市應服務資源,採用統一的號碼,用於公眾報告事件和求助,統一接警,統一指揮,聯合行,為市民提供相應的救援服務,為城市的公共安全提供強有力的保障的統。
  8. Abstract : taking single - rope drum wind as analysing object, the paper analyses safety coefficient of main rope using the dynamic state method under speed up, constant the speed, reduce the speed and emergency braking, change law is gotten comparing them with " mine safety standards ", points out existing problems and solving methods of safety coefficient in selecting and using rope in home

    文摘:以立井單繩纏繞式提升機為研究對象,從態方面分析提升鋼絲繩安全數,得出其在加速、等速、減速、狀態下的變化規律,與我國《煤礦安全規程》的要求進行比較,指出目前國內選擇和使用提升鋼絲繩在安全數方面存在的問題和解決辦法。
  9. For example, its integration with ics and mcs can provide the " hot - hit " message function, as well as more comprehensive and easy to use resource dispatching functions

    例如,第三代電腦輔助指揮及控統與綜合通訊統和流電腦信息統合作,提供信息功能,並更全面地簡化資源調配的工作。
  10. The system comprises the integrated communication system, the emergency telephone system, the automatic vehicle location system and geographic information system avls gis, the mobile computing and messaging system, and the third generation computer assisted command and control system caccs3 - core

    統包括綜合通訊求助電話統自車輛顯示位置及地域資訊統流電腦信息統,以及第三代電腦輔助指揮及控統。
  11. The transient stability - constrained emergency control is primary work of transient stability analysis of power system under harmful contingencies

    摘要是保證電力統遭受大的擾后維持統暫態穩定的主要措施。
  12. In probabilistic dynamic security assessment, probabilistic transient stability " is mainly discussed. detailed models of transmission line, protection system and emergency control measures are added to step - by - step transient stability programs

    首先建立態模擬中輸電線路和保護統的詳細模型,建立了基於時域模擬的暫態穩定模型,以及各種措施模型。
  13. To support the commitment of the government to cut energy consumption in government buildings, we have implemented a series of energy saving measures in our offices. for example, the installation of timers to automatically switch off non - emergency lighting, exhaust fans and power sockets after office hours, rescheduling the running time of the air - conditioning plants and lift services, the installation of t5 lighting system with electronic ballast and motion sensor during retrofit programmes and the installation of photo sensor to control carpark lighting

    為支持政府在建築物節約能源方面的承諾,我們在辦公室實施了一列的節約能源措施,如安裝時間掣使在非辦公時間自關掉非照明統、抽氣扇及插座電源,重新定空調裝置及升降機的運作時間,在翻新工程中更換附有電子鎮流器和移感測器的t5照明統,以及在停車場裝置感光器以調節燈光。
  14. Generally, the mobilization prepared plan is one of the information base for the mobilization decision - making, and could act as an assistant for the decision maker in mobilization decision - making. however at present, the role of the mobilization prepared plan for supporting the mobilization decision is fulfilled by the decision maker through reading the prepared plans, thus in the urgent mobilization situation, the effect of the mobilization prepared plan for the mobilization decision support is not so good since the limited knowledge of the decision maker as well as their limited ability for handling the knowledge

    在經濟員管理中,員預案和員決策間存在著密切的關,通常員預案是員決策的信息基礎之一,能夠輔助決策者進行員決策,但是目前員預案對員決策的支持作用是由決策者通過解讀員預案來完成的,這樣在員情況下,由於決策者經驗知識和知識處理能力有限、速度緩慢,就限員預案對員決策支持的有效性。
  15. The anti - lock brake system ( abs ) as an auxiliary brake system can avoid the tire locking and ensure the lateral stability and turning steering at the time of braking when the vehicle urgent braking. besides it can make the vehicle achieve the minimum brake distance on most of the road

    Abs統作為一種輔助的統在汽車時可防止車輪抱死,保證車輛在時的側向穩定性和轉向操縱性,同時還可在大多數路面條件下獲得最短的距離。
  16. Other regulatory programs included emergency and contingency plans, controls over importing and exporting natural gas, supervision of utilities and industry converting from oil and gas to coal, establishment of priorities for natural gas curtailment, and coordination of regional power systems

    其他的法律規范活包括和突發事件應對計劃、天然氣進出口管、對從石油和天然氣中取焦碳的工業和應用的監管、壓縮天然氣優先性的定,以及區域電力統之間的協調。
  17. The high speed of the maglev train need its operation control system assure that the train is safe. when the maglev train meets any troubles, it must stop at once. at this time how to make the train safely and accurately stop at the next parking station is a problem that need to research on

    高速磁浮鐵路統是未來高速鐵路的一個發展方向,高速磁浮鐵路的超高運行速度對其運行控統保證列車安全運行提出了較高的要求,當高速磁浮交通統遇到故障,磁浮列車應立即,此時如何保證列車安全準確的停靠在輔助停車點是一個值得仔細研究的問題。
  18. It is proposed that both open - type and close - type brake clamps should be provided, the brake system should be comprised of working brake subsystem, emergency brake subsystem and holding brake subsystem, and it should be possess brake capacity storage, security system and standby system

    在此基礎上,提出盤式剎車的剎車鉗應由開式和閉式兩種鉗型組成,剎車統由工作統、統和駐車統組合而成,並指出統應具有能力儲備、安全保障統和備用統。
  19. A digital control emergency braking system of hoist is carried out based on industrial controlling computer, it has successfully realized constant deceleration retardation, a new approach has been developed for improving the safety and reliability of hoist emergency braking

    給出一種利用工控計算機實現的全數字控提升機緊急制動系統,統已成功地實現了提升機時的恆減速,為有效地提高提升機的安全性和可靠性開辟了新的途徑。
  20. In the chapter four, i discussed the design of the maglev train braking control system and lay out the simulation results. the results show that the design is feasible

    第四章討論了磁浮列車統的設計,並給出了列車模擬結果,模擬結果表明控器的設計是有效的。
分享友人