緊急驗證 的英文怎麼說

中文拼音 [jǐnyànzhèng]
緊急驗證 英文
emergency proving/emergency verification
  • : Ⅰ形容詞1 (物體受到幾方面的拉力或壓力以後呈現的緊張狀態) taut; tight 2 (物體受外力作用變得固定...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞(證明) prove; verify; demonstrate Ⅱ名詞1 (證據) evidence; proof; testimony; witness 2 (...
  • 緊急 : urgent; pressing; critical; emergent; pressure; emergency; urgency
  • 驗證 : test and verify; checking; proving; testing; confirmation; [數學] corroboration; inspection; veri...
  1. Door of ministry of public health : be in charge of food producing licence of sanitation of management company provision extend and control government daily ; to unit of school dining room, meal, include of all kinds guesthouse, restaurant, cafeteria, wine shop, eating house to wait and the supervisory examination of company of production of additive agent for food, of wholesome to food quality supervise monitor the checkup that examines to produce management personnel with food ; the urgent cure that develops bromatoxism and patient of food safety grave accident works

    衛生部門:負責食品生產經營企業食品衛生許可的發放和日常監督治理;對學校食堂、餐飲單位,包括各類賓館、飯店、餐館、酒樓、飲食店等以及食品添加劑生產企業的監督檢查,對食品衛生質量的監督監測檢和食品生產經營人員的健康檢查;開展食物中毒和食品安全重大事故病人的救治工作。
  2. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常湊,管道轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試進行論,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試確定,為碧流河水庫增建旁通管設計提供依據。
  3. 3 have or quality problem that take place within warranty period point contract one year from the equipment performance acceptance test qualified a day, confirmed by both sides, really the responsibility of our company, our company is responsible for carrying on the appropriate defect and dealing with or changing, sending back goods free, and is it is it put in place to serve in the one day in general cases to promise, one day such as emergency is it put in place to serve, the reasonable expenses are undertaken from our company generally

    3在質量保期內指合同設備性能收試合格之日起一年存在或發生的質量問題,經雙方確認,確是我公司責任,我公司負責免費進行妥善缺陷處理或調換退貨,並且承諾在一般情況下6天內服務到位,情況3天內服務到位,合理費用概由我公司承擔。
  4. As to the working process, there are two stages : urgent blood transmission stage ( l985 - 1995 ) and health improvement stage ( l995 - 2000 ) ; as to the working content, it mainly includes strengthening the government conduct, increasing the investment of staff finance, and materials. shanghai has done a good job through establishing the system of principal titles, integrating the policy strengthening into the whole city planning, cooperating with universities, and stressing scientific research. however, the way of using the school transformation is proved to be diffcult, and even ne gative

    就工作進程而言,加強薄弱初中可分為兩個階段: 「輸血」階段( 1985 - 1995 )和「強體健身」階段( 1995 - 2000 ) :就工作內容而言,加強薄弱初中的政策措施,主要包括強化政府行為,加大人、財、物的投入等方面;就城市而言,上海市加強薄弱初中的經與成效最為顯著,建立校長職級制、將加強薄弱初中納入城市整體發展規劃、與高校聯合辦學、加強教育科研等措施都被實踐明是可行而有效的。
  5. As another example, when verifying an alarm, network cameras can send images to the arriving emergency personnel so that they know what conditions to expect at the scene

    另外一個例子,一個己的報警,網路攝像機可以把相關圖像送給處理的管理員,這樣管理員就可以知道現場的狀態。
分享友人