線路布置 的英文怎麼說

中文拼音 [xiànzhì]
線路布置 英文
circuit layout
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Firstly, the connected end sets of the relay lines are got using the breadth first search algorithm and the connected relationship of wiring terms is got in the electrical circuit diagram according to different cad block structure of different element type. secondly, the appropriate specification of the relay element is chosen by using the equinoctial graph algorithm, and the panel layout diagram is generated automatically by the combining automatic layout and manual intervention. finally, the optimized path algorithm which passes each vertex in the completed non - directional graph once and only once is put forward, this algorithm and the prim minimum spanning tree algrotithm can generate the inner panel wiring diagram and terminal wiring diagram automatically

    首先,採用廣度優先搜索演算法查找電氣原理圖中的連通導端點集,並根據不同類型的繼電元件對應的cad圖塊結構的不同,得到電氣原理圖中元件接端子之間的連接關系;其次,根據二分圖匹配演算法為電氣原理圖中繼電元件選擇合適的型號和規格,並採用人工干預和自動相結合的方法完成屏面圖的自動生成;最後,提出了完全無向圖中經過每個頂點一次且僅一次的優化徑演算法,利用該演算法和經過預處理的prim最小生成樹演算法自動生成屏內安裝接圖和端子接圖。
  2. Secondly an infrasonic array was constructed. the array is made up of three detectors with about 1 kilometer distance between each other. the three detectors are connected with telephone line

    其次構建次聲陣列,用三個相距約一公里的次聲探頭構成次聲三元接收陣,它們之間用電話傳輸數據,合理地各陣元的位和方位,三信號通過採集卡上的不同通道號輸入計算機。
  3. In the hardware design, the paper completes modules ’ design like outside memory, patulous a / d, patulous d / a, rs232 communication, ecan communication, led control, keyboard control, distant control, emulation, reset, logic voltage switch, dsp supply power regulate and ac - dc power circuit, as well as room layout design like anterior panel, back panel etc. and dsp transfers data with peripheral equipments except outside memory using serial ports. besides, the whole circuit is configured in interrupt response. thus, it can meet system demand as well as take full advantage of tms320f2812 ’ s hardware resource. in the software design, the paper finishs programs like the interface programms intercommunicates with people, the distant control program, ad and da modules ’ control program, in addition, the paper select the velocity and acceleration state - feedback algorithm and is written in the program. the software design uses dsp integrate exploiting environment named ccs2. 2 of ti inc. as software instrument, and programs with the combination of c language and assembly language. moreover, in order to maintenance or modify the software expediently and shorten software ’ s exploitation time, the design adopt software modularization technique. finally, some air cylinder experiments are carried out to proved that the pneumatic controller is very practical

    在硬體設計中,本文完成了片外存儲器擴展、 a / d擴展、 d / a擴展、 rs232通信介面、 ecan通信總介面、液晶顯示控制、鍵盤控制、遠程控制、模擬、復位、邏輯電平轉換、 dsp工作電源校正電和ac - dc電源等模塊設計以及控制器前面板、後面板等的空間局設計。其中dsp與除外部存儲器的外圍設備之間的數據傳送全部採用串口通信,同時系統電成中斷響應方式,這樣既滿足了系統要求,又充分利用了tms320f2812的硬體資源。在軟體設計中,本文完成了人機界面功能模塊、遠程控制模塊、 ad擴展模塊、 da擴展模塊、速度和加速度狀態反饋的控制演算法的程序設計。
  4. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親水平臺、沙灘浴場及停車場的道和景觀設計,對東湖環湖的面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊的文化性、藝術性和獨特性,合理安排配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽
  5. The structure which is adopted according to the natural topography, such as shed - tunnel or half - tunnel, should be adopted to protect the natural environment and slope in the complicated zone adjacent to mountain

    傍山地段,構造物應順應地形,提倡設棚洞、半隧道,以達到保護邊坡和自然環境的目的。
  6. The thesis offers the idea of applying the techniques of data - administration, computer transaction, computer graphic and the interaction between computer and people in the emulational research of the construction of three - dimensional geological modeling, which also succeeds in realizing the protracting of the administration of geological data, the layout of industrial section, complex section chart, complicated isoline chart and the three - dimensional geological modeling chart, and in providing valuable references for geological research and technological support for three - dimensional and complex geological research

    論文提出了運用數據庫管理技術、計算機處理技術和計算機圖視技術與人機交互技術建立三維地質建模與模擬研究的基本技術思較成功地實現了地質數據管理、工區圖、復雜剖面圖、復雜等值圖和三維地質模型圖的顯示與繪制,為地質科學研究提供了有價值的參考資料和三維復雜地學研究的技術支持環境。
  7. On the base of choosing proper model and designing route, it uses cad and probes into an efficient and easy design way to enhance design efficiency and shorten design periods. it brings in the way of multiple - objective optimization and gives proper optimization model and algorithm to get a comparative satisfying result. and it applies system simulation to cable crane design and gives the simulation model and arithmetic of the freight track

    本文針對此問題,引入現代的設計方法:在選取合適的模型和設計的前提下,運用計算機輔助設計,研究探討高效便捷的設計方法,大大的提高設計效率,縮短設計周期,節約成本;引入多目標優化的思想,提出合理的優化模型,給出了實現演算法,得到了比較滿意的結果;引入系統模擬的設計理念,給出了荷重軌跡的模擬模型實現演算法和程序,對荷重軌跡進行了計算機模擬,提高了纜索起重機的效率和質量,提高了生產的安全性。
  8. However, people studied the riverway mainly by field survey and landform map contrast before. because of the limits of man ' s field view and complexity of field survey route, it is a difficult bottle neck for people to make synthetical analysis on geological structure, yangtze river shoal, floodplain, terrace, and microcosmic suspended load on macroscopical scale

    而以往的河道研究大多數是通過地面調查和地形圖室內對比分析來研究的(少數運用航片) ,由於受人的視域范圍及調查工作的復雜度影響,對區域宏觀尺度下的地質構造、長江沙洲、漫灘、階地及河流微觀領域的懸浮物等作綜合性的研究便成為了瓶頸。
  9. I was in the audience, reporting in something close to real time by publishing frequent conference updates to my weblog, an online journal of short web postings, via a wireless link the conference had set up for attendees

    作為聽眾,我利用會場為與會者的無頻繁地更新我的博客,將會議的最新消息發其上,這樣的報道方式幾乎就是第一現場的,所謂博客,就是一種短文形式的網上日誌。
  10. By analyzing all sorts of data involved in the drawing of plane arrangement of the contact net, the paper then presents and realizes the sub - systems of drawing data management, which includes setting up the data structure, programming and managing of the data and provides the drawing data for the whole system used for the later drawing, finally by introducing the concerned theories of the parameterized design explains the similarities and differences and their applied scope of all kinds of parameterized technologies, and by associating with the features of the plane arrangement maps of the railway contact net analyzing size restraint of contact net

    它是針對鐵接觸網平面圖的特點來完成選擇區間或站場繪制、圖紙設定、圖型設定、字元高度、圖型坐標點、繪圖基點和圖型數據文件保存徑的設以及圖的標注欄和明細表尺寸設;緊接著通過對接觸網平面圖的繪圖中所涉及的各種類型數據進行分析,提出並實現繪圖數據管理子系統,它包括建立繪圖系統的數據結構,對數據進行編輯管理,向整個系統提供繪圖數據,供其後的圖形繪制使用;最後通過對參數化設計的相關理論進行介紹,闡述了各種參數化技術的異同點和適用范圍,並結合鐵接觸網平面圖的特點具體分析了接觸網的尺寸約束。
  11. In this paper global joint planning for middle and low voltage network is considered. both line arrangement and cross section and transformer arrangement and rate are considered. it is a non - line combined optimum problem more complex than single network planning

    本文從整體的角度考慮中壓和低壓配電網的聯合規劃,不僅考慮了走向和導截面大小,而且考慮了變壓器的和容量,這是一個比單純的網架規劃更復雜的非性組合優化問題。
  12. It was also investigated and analysed on the styles of cross section in road green space, the rate of green space, the kind of green space, the quantity of plant spaces in green space, the format of planting. on the base of these, the planning designs of road green space in the blocks of heze city were also studied in combination with the practical situation which the city of heze were building to be a plain - plantation city with the flowers and water. the main results were as follows : 1. there were some problems about road green space in blocks of heze city, which were detected and researched. ( 1 ) the rate of road green space was low and the styles of cross sectionin road green space were simple

    本研究以菏澤城區道綠地及街頭綠地為研究對象,對其綠地斷面形式、綠地率、綠地類型、綠地植物種類、數量、種植形式等現狀進行了全面的調查和分析,在此基礎上,結合菏澤近年創建以「花城水邑」為依託的平原森林城市建設的實際,對菏澤城區道綠地規劃設計進行了研究,主要結果如下: 1 .菏澤城區道綠地存在以下問題: ( 1 )道綠地率低,綠地斷面形式單一,中心島面積偏小; ( 2 )植物種類少,景觀效果差; ( 3 )植物配形式單一,地方特徵不突出; ( 4 )某些植物選擇不當,如遮陰功能差,影響交通安全等; ( 5 )行道樹與架空存在矛盾,影響樹木生長,景觀效果差; 2 .根據荷澤實際情況進行了城區道綠地規劃設計研究: ( 1 )提出了菏澤城區道綠地規劃設計的依據、原則、總體局、局形式。
  13. This is due primarily to the ever - increasing emphasis on aesthetics coupled with transportation alignment restrictions. the use of curved beams in industrial buildings is also not uncommon

    梁橋的設,不僅可以使交通趨于合理和科學,而且能夠與周圍的環境協調一致,給人以美的享受。
  14. Such as operation manual for the machine tool, structure schematic diagram, maintenance manual and necessary drawings for vulnerable parts, electrical manual, programme manual, detailed documents and drawing for maintenance ( include circuit and pipeline schematic diagram of the main mechanical structure and control arrangements inside the product, arrangement plan of the control panel, connecting diagram, hydraulic pipeline connection diagram, assemblage diagrammatic sketch, drawing for vulnerable parts and foundation drawing ), production license, acceptance certificate and etc

    如機床操作使用說明書(操作手冊) 、結構原理手冊、維修保養說明書及必要的易損件圖紙、電氣說明書、編程手冊、詳細維修用的資料和圖紙(應包括產品內部主要機械結構與控制裝、管原理圖、控制面板圖、接圖、液壓管連接圖、裝配示意圖、易損件圖、基礎圖) 、生產許可證以及驗收證等。
  15. Interesting selling prices of industrial plant, trading, lighting in addition to halogen, company, fittings are offered to you by integral cz, spol. s r. o. beyond that you can obviously co - ordinate at a short notice for all offers on equipment, sources and production through telephone or mail

    是一家知名的、誠信的生產商和服務商,該公司提供新型的、專門的產品,例如破碎錘、 (混凝土)面破碎機,裝備,遮蔽、盯梢,緊密地、壓緊的,內部裝,輝光燈、白熾燈,鹵素,進口商,塑料軟管,照明、照明設備,材料,接、薄膜、架,塑料,聚碳酸酯。
  16. The position of the line and station influences the traffic of the city, which in return also influences the safety and profit of lrt

    介紹了有軌電車車站、線路布置形式,從行人交通組織、乘客交通組織、口交通組織、段交通組織等方面對有軌電車的交通組織設計進行研討。
  17. I ' ll take you, but your sister changed the wiring scheme. it ' s one of her fail - safes

    我會帶你去,不過你妹妹改變了局這是她自動防故障裝之一
  18. The transportation of the new harbor city is well planned and convenient with the east sea bridge, national highway and out ring highway connecting its main network and decentralizing the traffic

    臨港新城的交通體現出主次分明的網特色,連接東海大橋,國道及外環,把交通流量分散到放射形的主軸幹道上。
  19. Trunking : the power distribution device used in laboratory, are emplyed the aluminum alloy, and die - casting, its surface are coated with electrical power. this device can satisfy the requirement of overall planning of comprehensive line - fixing systems such as the power cord, telephone wires, network

    槽:用於實驗室配電設施,採用鋁合金材料,模具製作,表面為靜電粉末噴塗,可滿足電源、電話、網等綜合方面的要求,可將實驗室內的各種功能槽內,以達到規范標準、便於維護管理的目的。
  20. Based on the progress in rail manufacturing technology and the newest achievements in track research and design, this paper studies the selection of cut - length, quality and materials of rails for urban rail transit, and suggests that multiple factors should be considered, such as different line arrangements, vehicle and loads, rail transportation, construction and maintenance condition of trackwork, construction period, inestmen1 and maintenance costs, so as to make sure that rail type selection in urban rail transit can satisfy the requirements on safety, reliability, applicability, economy and pertinence

    摘要根據鋼軌製造技術的發展並結合軌道研究和設計領域的最新成果,對城市軌道交通鋼軌定尺長度、鋼軌質量及鋼軌材質選擇進行分析和探討,並建議在鋼軌選型時,應全面考慮不同線路布置特點,車輛及荷載情況,運輸、施工及維修條件,建設工期,初期投資及運營成本要求等綜合因素,力求使每條城軌交通中的鋼軌選型方案在滿足安全可靠的基礎上,更具工程針對性和經濟適用性。
分享友人