線路程序單 的英文怎麼說

中文拼音 [xiànchéngdān]
線路程序單 英文
circuit card
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. On the demand of application and according to the soluhons menhoned above, a method of displacement waiting auto - sy ' nchronizing is put forward, which is based on match filters. at the end a complete and speeflc set of hardware circuits and software programs which haplements the scheme, is also presented in the ancle. the synchronization system was tested in the pool and in the shallow wate near m port, the result of the test shows that its performance is satisfactory

    論文著重介紹實現了跳頻通信系統同步的一般方法,並詳細分析和對比跳頻同步系統的捕獲方案,在此基礎上,提出了一個基於匹配濾波器的位移等待式自同步方案,設計、完成並給出了詳細硬體連圖、軟體圖和部分,該自同步方法在實驗室水池實驗取得良好的效果,並在廈門港海域進行了現場實驗測試,具有較低的誤碼率和一定的檢測概率,結果令人滿意。
  2. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲和在加載過中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  3. The development of fieldbus technology made lonworks field bus outstanding in all kinds of fieldbus. this paper simply introduces some kinds of common using fieldbus and the important position and influence of lonworks fieldbus in all kinds of fieldbus, carefully describes the technology core of lonworks technology, puts great emphasis on the introduction of the development and design of public security node of intelligent district which adopts computer, communication and control technology, carefully designs the interfaces of hardware circuits. the public security node of intelligent adopts 8031 single chip as its main processor to complete the application program of user, which mainly collects, process and control all kinds of field signal, and neuron chip 3150 as its slave processor to communicate with other nodes on field network, which works under parrel slave a mode

    現場總技術的發展使得lonworks技術脫穎而出,本文簡要介紹了常用的幾種現場總的概況以及lonworks技術在現場總技術中的地位和影響,對lonworks技術的技術核心:神經元晶元、 lontalk協議、 lonworks收發器、 lonbuilder及nodebuilder進行詳盡的描述;重點介紹了集先進的計算機技術、通信技術、控制技術為一體的智能小區安防節點的開發與研製,對節點硬體電的各種介面進行了詳盡的設計。本文設計的智能小區安防節點採用片機8031作為主處理器來完成用戶的應用,主要負責對各種現場信號進行採集、處理及控制,工作在并行從a方式下的神經元晶元mc3150作為從處理器,主要完成與現場網上的各節點及中心控制室之間的通信工作。
  4. This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher

    本文分別建立了計算220kv復蓋的工頻電壓升高及操作過電壓的計算模型,利用emtp對220kv復蓋工頻電壓升高、投切空過電壓、投切空變過電壓、相故障過電壓進行計算分析,並提出合理的防護措施。
  5. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析( lscfea )中的小變形平面固結分析元( sse2 ) ,結合實體工項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲及杭甬高速公試驗段在高堆載情況下的固結沉降曲;並對以上曲特徵進行了分析,得出各時間段曲斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的性回歸關系。
  6. The paper gives the evidences for making use of auto - reclose technology in ineffectively grounded systems from its importance, feasibility and validity. to develop the single - chip microcomputer of the device, the paper does a lot of work of design hardware and software include using soft timer with task - plan solving the whole arrangement of the process

    在選裝置的實現方式上,本文提出了基於片機方式的硬體電的開發方案和軟體系統設計方案,嘗試了使用80c196kb的三個軟體定時器中斷結合任務型設計方法解決的問題。
  7. It includes : dynamic show of technics flow, real time data acquirement and show, history data save and print, fault alarm, etc. the plc control system mainly accomplishes the wastewater technics flow control, harmonizes the logical relationship among local intelligent control instruments and transmits the state of each local equipment to the industrial computer simultaneously, the plc control station receives the control commands from the industrial computer ; the local intelligent units take charge of the correlated parameters measure, disposal and control, and it will transmit the related parameters to the computer, etc. in this thesis, introduced municipal wastewater treatment technics, the integrated application program development of computer, the design method of plc control station, the communication between plc control system and computer, and the network of wastewater treatment with profibus - dp was also discussed

    上位計算機主要實現遠監測和管理功能,具體包括:工藝流動態顯示、實時數據獲得及顯示、歷史數據存儲與列印、故障報警等功能plc控制系統主要完成工藝流式控制制以及協調現場各智能儀表之間的邏輯關系,將現場各設備的運行狀態通過通訊網傳輸到上位計算機,並接收上位計算機的控制指令;現場各智能儀表元負責各相關參數的監測和處理、控制,並將有關參數送往上位監控計算機進行處理、保存等。本文以莎車污水處理項目為例,介紹了城市污水處理工藝、上位監控計算機的綜合應用開發、城市污水處理自動控制系統plc控制站的設計和採用profibus系列中廣泛應用於現場設備的profibus - dp總
  8. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公隧道多為大跨度、扁平、幾何形狀呈多樣化的特點,通過深入分析目前隧道支護結構設計中存在的各種問題,抓住高等級公長大隧道設計中隧道結構斷面的優化選型及隧道支護結構的穩定性與承載能力兩個核心問題,引入結構優化理論中的簡易復合形優化方法,深入探討了滿足建築限界、通風條件、受力狀態約束等條件下公隧道襯砌斷面優化設計模型,提出了三種襯砌斷面形狀(心圓、坦三心圓和尖三心圓)的優化選型方法,建立起一套完善的高等級公長大隧道的系統優化設計理論與方法,並開發出相應的計算機,用於擬建的上海至瑞麗國道主幹湖南省邵陽至懷化高速公雪峰山長大高速公隧道的結構斷面優化選型,得出了一系列較為合理的支護結構設計參數。
  9. Then, we establish the finite element analysis models of the antenna in different structure layout, and obtain the corresponding frequencies and model shapes. finally, according to the importance of each object, we set up the model of multiple objects that aims to maximize the first natural frequency and minimize the mass. combining orthogonal experiment and variant weighting coefficient method, we formed an effective multiple objects optimized algorithm basing on the neural network and genetic algorithm

    本文首先詳細的敘述了天結構的各組成元,闡明了天反射拋物面的形成原理;然後在ansys軟體環境中建立了不同結構布局下天的有限元分析模型,分析計算了各種情況下天的的固有頻率與振型;最後依據天各指標的重要性,建立了以一階固有頻率最大、質量最小為目標的天結構多目標優化設計模型,並基於神經網和遺傳演算法,結合正交實驗和變加權系數技術,形成了一種有效的多目標優化演算法,在matlab平臺下實現了天的結構多目標優化設計計算,求得了天的最佳結構參數。
  10. According to the request of this subject, we have developed the system hardware and software for the slave device and the inspection software running on the pc. in this paper all of the followings is illustrated detailedly, such as the research on the principles of measurement and its realization, three means of water - level measurement that are separately based on photo electricity coder, pressure sensor and potentiometer ; selection of the microchip, we choose an advanced integrated soc ( system on chip ) microchip c8051f021 as the main controller ; realization of signal sampling, processing and its conversion in the mcu ; application of high precision 16 bits adc cmos chip - - ad7705 in our system, designing its interface with the microchip and relevant program ; using a trickle charge timekeeping chip ds1302 in the system which can provide time norm and designing of its i / o interface and program ; additionally, a 4 ~ 20ma current output channel to provide system check - up using ad421. in the system, ad421, ad7705 and the microchip compose spi bus ; to communicate with the master pc, here we use two ways which are separately rs232 and rs485 ; moreover, there are alarm unit, keyboard unit, power supply inspection unit and voltage norm providing unit in the system

    針對研製任務的要求,課題期間研製了下位機系統硬體和軟體,開發了上位機監控軟體,其中所作的具體工作包括:測量原理的研究和在系統中的實現,在本次設計中用三種方法來進行水位測量,分別是旋轉編碼器法、液位壓力傳感器法和可變電阻器法;主控晶元的選擇,我們選用了高集成度的混合信號系統級晶元c8051f021 ;實現了信號的採集和處理,包括信號的轉換和在片機內的運算;高集成度16位模數轉換晶元ad7705在系統中的應用,我們完成了它與片機的介面設計及編制任務;精確時鐘晶元ds1302在系統中的應用,在此,我們實現了用片機的i o口與ds1302的連接和在軟體中對時的模擬,該晶元的應用給整臺儀器提供了時間基準,方便了儀器的使用;另外,針對研製任務的要求,還給系統加上了一4 20ma模擬信號電流環的輸出電來提供系統監測,該部分的實現是通過採用ad421晶元來完成的,本設計中完成了ad421與片機的spi介面任務,協調了它與ad7705晶元和片機共同構成的spi總系統的關系,並完成了設計;與上位機的通信介面設計,該部分通過兩種方法實現: rs232通信方式和rs485通信方式;系統設計方面還包括報警電設計、操作鍵盤設計、電源監控電設計、電壓基準電的設計。
  11. In this paper, the circuit used for testing sheet resistance is designed using single chip processor. additionally, we have expressed van der pauw function as a polynomial form through local and global reversal development by using the normalized polynomial match, being convenient not only for programming, but also for sheet resistance testing when using van der pauw and rymaszewski methods

    本文還利用片機系統設計了薄層電阻測試電,對于中用到的范德堡隱函數,利用非性反演和規范化擬合的方法推導出其多項式顯函數形式。這不僅給對我們編寫提供了方便,也為使用范德堡法和rymaszewski法測量薄層電阻提供了便利。
  12. It ' s an ideal structural system and has multi - earthquake resistance ability because of a great deal of slabs removed in floors above the transfer - story amended the lateral stiffness of the stories near the transfer - story. based on the available references, the five - spring line element, the three - spring line element and the multiple vertical - line - element model are introduced to model special column, beam and shear - wall, the relevant stiffness matrixes are deduced and the restoring - force models are gaven to deep into the elasto - plastic seismic characteristics of the structure. acording to the results of shaking table test and elastic finite element analysis, a new making model melhod is presented in which uses the linear and the nonlinear element and the assumption that the floor is infinitely rigid in different areas

    為進一步研究這種復雜高層建築結構的彈塑性性能,本文在國內外現有研究的基礎上,提出利用五彈簧桿元、三彈簧桿元及多豎元模型分別模擬空間柱、梁和剪力墻,推導了相應的剛度矩陣並給出了恢復力模型;結合試驗研究和精細有限元分析的結論,提出性和非元相結合,剛性樓板假定和彈性樓板相結合的建模方法,較好地解決了空間結構彈塑性分析中佔用計算機資源較多的問題;接力大型有限元分析? ? ansys ,在上述建模思的指導下建立了結構的空間非性分析模型,進行了空間三維彈塑性時分析。
  13. Taking the characteristics of road and bridge engineering into account, this paper makes systematic analysis and study on applications of static gps in data processing of surveying in road and bridge engineering : the feasibility of using single point positioning result as starting point is studied and the influence of it on baseline solution is discussed ; on account that the software provided along with instrument by vendors usually does not support coordinates in the independent engineering coordinates system from gps observations, a simple and effective method is represented for the gps data processing in the independent engineering coordinates system and is programmed. through real examples the method and programs are testified ; from gps surveying the wgs - 84 coordinates are acquired, while in reality coordinates in local coordinate system are needed, so conversion from wgs - 84 coordinates to local coordinates is necessary

    結合橋工的特點,對靜態gps在橋工式控制制測量中的數據處理作了系統的分析和研究: ?對點定位結果作為起算點的可行性進行了研究,並探討其對基解算的影響; ?鑒于商家提供的隨機軟體往往不支持利用gps觀測得到工獨立坐標系中坐標,為工獨立坐標系gps數據處理提供了一種簡便有效的方法,並編制了相關的處理,通過實例驗證,是正確的、方法是可行的; ? gps測量得到的是wgs - 84坐標,而實用上需要的是地方坐標系坐標,因而得把wgs - 84坐標轉換地方坐標系坐標。
  14. The concrete contents include : one background : with the comparison with the western countries, our compulsory education displays a strong government - oriented behavior, which is the root of success and potential failures in our compulsory education two clues : in " ought to be " level, it is " local quasi - public goods - - polycentri supply " and in " be " level, " pure public goods - - monopolized supply by government " one theoretic judgment : the separation of manufacture and provide in compulsory education, which gives the chance for polycentri manufacture of compulsory education one center point : to stick to the main responsibilities of government in providing and managing the compulsory education three contents : subject ( which ? ) : local governments are the responsibilities subject of compulsory education substances ( what ? ) : to ensure the compulsory education ' s public good from the nature, and compulsory education ' s development abilities of the whole local government from the quantity measures ( how ? )

    具體內容有: ?一個背景:在中西方義務教育比較出的基本特徵中表現出的強烈的政府驅動,我國義務教育所取得的成績和所蘊涵的危機都在於此?兩條索:理論應然層面上的「地方性的準公共產品? ?多中心供給」和實然層面上的「純公共產品? ?政府壟斷供給(中心) 」 ?一個理論判斷:義務教育的生產與提供的分離? ?義務教育的多中心生產的可能性?一個中心:堅持政府在義務教育中責任的主要性? ?提供與管理?三項內容主體(哪一級政府) :根據博奕理論,地方政府是我國義務教育的責任主體內容(負什麼責任) :質上保證義務教育的公益性,量上保證各地方在義務教育發展力上的均衡措施(怎樣負責人通過政府間的轉移支付保證義務教育中的正義,通過義務教育的多中心生產,把「麵包做大」保證義務教育中的實質正義當然,在此對本文內容的區分梳理,只是一種思的順
  15. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非性粘結的新型復合砂漿錨桿有限元模型;然後,運用上述復合砂漿錨桿元模型,引進非性有限元分析手段,開發了隧道支護穩定性分析的有限元,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公隧道工實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。
  16. There seems to be a bug in the i / o setup window that fails to create mono input paths

    在輸入輸出設置里有一個錯誤。無法建立一個聲道的音頻
  17. The five main sections of this thesis are as follows : 1 ) component parts and working flow of intelligent community 2 ) hit communicating protocol 3 ) technical points of hardware design single chip micro - controller touch screen rf data transmitting identification confirmation flash memory 4 ) software design under avr studio3. 53 ide 5 ) method and result of system test

    論文包括以下幾個主要部分: 1 )智能小區系統組成及系統運行流2 ) hit通信協議3 ) hit - 5終端硬體電設計片機技術觸摸屏輸入技術無數據收發技術身份識別技術flash存儲技術4 ) avrstudio3 . 53設計5 )系統測試方法及調試結果
  18. It takes much space to expatiates the strong function of the sixteen - bits singlechip which control the winding machine to the whole running. there is a deeper study for the two electromotors ' ( ac main electromotor and step motor ) using and driving circuit for actual winding, . i also expatiated the detect of those signals. the control program which has been compiled and simulated to debug is listed in the end of the dissertation

    本文重點闡述了16位片機在繞機整體控制中所顯示出來的強大功能,並對用於實施具體繞的兩個電機(交流主電機和步進電機)的使用與驅動電作了比較深入的研究,對于信號的檢測有較詳細的闡述,在文末列出了已通過編譯模擬調試的用c語言所編寫的控製,並對分段進行分析。
  19. The budget should include artist s fee, material costs, support, fabrication, production and installation, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of sculpture for 12 months after the installation and any other expenses incidental to the implementation of the proposed sculpture

    此費用須包括創作及設計費物料費支架製作安裝保險運輸提供有關的記錄文件和雕塑的操作及維修手冊清潔照明系統裝置訊號連接雕塑安裝后十二個月內的維修在雕塑安裝后兩個月內為主辦位提供一次有關雕塑維修的講解等,及所有可能涉及設置雕塑的費用。
  20. The budget for the commission must include all costs including artist s fee, material costs, support and fabrication, production and installation, stand finish, lighting system, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of the sculpture for 12 months after the installation and any other expenses related with the sculpture

    委約費用預算包括設計費、物料成本、支架及裝置、製作及安裝、支架修飾、燈光系統、保險、運送、記錄文件、雕塑的操作及維修手冊、清潔、照明系統裝置、訊號連接、在雕塑安裝后兩個月內為主辦位提供一次有關雕塑維修的講解、雕塑安裝后十二個月內的維修及所有其他與雕塑品有關的支出。
分享友人