線路車 的英文怎麼說

中文拼音 [xiàn]
線路車 英文
idpatching vehicle
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Residential developments served by the proposed service are distant from rail station, public transport interchange or major franchised bus stop or gmb stop and use of alterative services will result in excessive number of interchanges ; and

    所服務的住宅樓宇遠離鐵站、公共運輸交匯處或主要專營巴士站或專小巴站;或使用其他運輸服務時須牽涉多次轉乘安排;及
  2. Vsp is both a pivotal tache in logistic distribution optimization and indispensable in electronic commerce. it can increase logistic economic benefit and realize logistic rationalization. the systemic study on the theory and method of vsp is the base on the growth of logistic intensivism, the establishment of modem chain of command, the development of its and ec. now, the problem is not only applied to the field of auto transportation, but also to ship avigation communication electricity industry management computer application etc. the algorithm has been applied into many combinatorial optimization problems such as the trainman ' s shift arrangement in avigation the optimization design of cargo arrangement in ship company

    對貨運輛進行調度優化,可以提高物流經濟效益、實現物流科學化。對貨運輛調度優化理論與方法進行系統研究是物流集約化發展、建立現代調度指揮系統、發展智能交通運輸系統和開展電子商務的基礎。目前,問題的形式已有很大發展,該問題以不僅僅局限於汽運輸領域,在水運、航空、通訊、電力、工業管理、計算機應用等領域也有一定的應用,其演算法已用於航空乘務員輪班安排、輪船公司運送貨物經過港口與貨物安排的優化設計、交通安排、生產系統中的計劃與控制等多種組合優化問題。
  3. The ongoing total refurbishment programme began in 1998 for buses that reached five years of age. all passenger facilities will be replaced with brand new ones. the refurbished buses are fitted with additional hand poles and bell pushes, new electronic route number display and improved lighting

    完成翻新的巴士,均安裝了額外的扶手柱和落客鐘掣、新式的電子號碼牌和改善了的照明系統,部分巴士更重髹了身色彩。
  4. The ongoing total refurbishment programme began in 1998 for buses that reached five years of age. all passenger facilities will be replaced with brand new ones. the refurbished buses are fitted with additional hand poles and bell pushes, new electronic route numbers display and improved lighting

    完成翻新的巴士,均安裝了額外的扶手柱和落客鐘掣、新式的電子號碼牌和改善了的照明系統,部分巴士更重髹了身色彩。
  5. Electric railway vehicles ; bow slipper holder for contact wire clamps

    電氣鐵輛.與夾接觸的弓形滑動器支架
  6. Our orders were to entrain at 9:15 in the morning at a nearby siding.

    我們接到的命令是早晨九點一刻在附近鐵
  7. A new planning method - analysis of factors of point line and area and control points optimization, which is based on the analysis of urban spatial structure, is tried to put forward. analyzing the important functional clusters in the spatial layout of the urban, the intracity medium - long distance vehicle traffic major directional desire line how the urban to link up with the highway network and the whole structure of expressway system, the skeleton of the expressway network can be obtained. using the degree of importance method analytic hierarchy process ( ahp ), one or several intersections can be selected

    該法對城市空間結構布局中的重要節點、主要的中長距離機動交通流徑期望的分佈、大城市與區域干網的銜接以及快速系統網的整體結構等進行分層次的分析研究,得出快速系統網構架,運用重要度法、層次分析法找出大城市重要功能組團中重要程度最高的一個或數個關鍵交叉口作為快速系統網規劃的控制點,考慮快速走向的控制點對走向進行優化。
  8. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的施工機具包括用於基礎施工,桿塔組立、架施工、電纜施工,光纜施工等工序的18大類800餘種產品,如機動絞磨、絕緣架空電纜及高壓電纜剝皮器,各類鋁合金抱桿,以及導、地器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊器、起重滑、尼龍輪或鋁輪放等,系列全、品種多,產品具有工藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。
  9. We will provide daily shuttle bus for our co - workers

    我們將為員工提供多條班上下班。
  10. According to time of operation, the buses are divided as follows : numbers that start with " 2 " are morning and evening rush hour buses, numbers that start with 3 are night buses ; according to location, buses are divided as follows : puxi buses, pudong buses, buses that cross the river including tunnel and bridge lines, and suburban area buses [ 700s & 900s ] ; according to payment method, the buses are divided into : single - ticket rmb 1 ( lines of 13 kilometer or less from end to end ) and rmb 1. 5 ( lines of 13 kilometers or more from end to end ) ticket - sellerless buses ( most two digit city buses and three digits buses starting with " 1 ", " 2 ", " 7 " are of this kind ; no change will be made, but terminal stations and hubs will have rmb 1 and rmb 1. 5 ticket booklets for sale, 50 non - refundable tickets per booklet ), and also single ticket rmb 2 air - conditioned buses and scaled - price ticket special lines ( including specialty coach lines starting with " 5 ", pudong specialty lines starting with " 6 ", mid - size coaches that start with " 8 ", double - decker buses and air - conditioned coaches that start with " 9 ", as well as the ten air - conditioned tourism lines [ and airport buses ] )

    按運營時間分,有:日間公交、 「 2 」字頭的早晚高峰和「 3 」字頭的夜宵;按地域范圍分,有浦西的、浦東的、過江的(含大橋、隧道)和郊區;按票務方式分,有單一票價1元(全程13公里以下的)或1 . 5元(全程超13公里的)的無人售票(市內公交號碼為兩位數的或三位數中「 1 」字頭、 「 2 」字頭、 「 7 」字頭的絕大多數是無人售票,自備零錢,不找零,公交終點站、各主要交通樞紐均有1元和1元5角兩種面值的公交預售票出售,每本50張,售出不退) ,還有單一票價2元的空調和多級票價的專(有「 5 」字頭的大巴專、 「 6 」字頭的浦東專、 「 8 」字頭的中巴專和「 9 」字頭的雙層或空調大巴,還有十條空調旅遊專) 。
  11. Railway rolling stock. magneto - thermic microcircuit - breakers for maximum current for controls and auxiliaries circuits. dimension

    輛.控制裝置和輔助用最大電流熱磁電機微電斷電器.尺寸
  12. Railway rolling stock. magneto - thermic microcircuit - breakers for maximum current for controls and auxiliaries circuits. generalities and tests

    輛.控制和輔助用最大電流熱磁電機微型電器.一般原則和試驗
  13. Bloom what railway opera is like a tramline in gibraltar

    哪一出鐵道歌劇像一條直布羅陀的電
  14. Because of special desert conditions, traffic accidents have usually taken place and emerged anually since the transfixion of desert highway in takla makan desert began in 1995

    摘要自塔克拉瑪干沙漠公1995年全以來,由於沙漠公特殊的交通環境,交通事故不斷發生,並且有逐年增長的趨勢。
  15. " knights of labour tie up the trolley lines across the bridge.

    「勞動騎士會中斷了所有過橋的有軌電。 」
  16. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要排水道的單橋,以連接沿該主要排水道東面近輛輪候區的現有未命名道與淳裕
  17. Code for design of ultrared detection system for railway vehicle axle temperature

    輛紅外軸溫探測系統設計規范
  18. Road vehicle unscreened low tension cables - specification for conductor sizes and dimensions for thin walled insulated cables

    輛非屏蔽低壓電纜.薄壁絕緣電欖的導大小及尺寸規范
  19. Article 35 the planning of any railway track, station, junction area and other related facilities within a planned urban area of a city shall be brought in line with the overall plan of this city

    第三十五條在城市規劃區范圍內,鐵站、樞紐以及其他有關設施的規劃,應當納入所在城市的總體規劃。
  20. By using the software, we can get a optimum velocity curve and other curves, check up the parameters of train and line whether or not satisfy the running require

    通過這個軟體,可以得到一條優化的列運行速度等其他曲,同時可檢驗輛的設計參數是否滿足運營要求。
分享友人