線路電工 的英文怎麼說

中文拼音 [xiàndiàngōng]
線路電工 英文
wireman
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  • 電工 : 1 (電工學) electrical engineering; electrotechnics2 (製造、安裝電氣設備的工人) electrician電...
  1. Vsp is both a pivotal tache in logistic distribution optimization and indispensable in electronic commerce. it can increase logistic economic benefit and realize logistic rationalization. the systemic study on the theory and method of vsp is the base on the growth of logistic intensivism, the establishment of modem chain of command, the development of its and ec. now, the problem is not only applied to the field of auto transportation, but also to ship avigation communication electricity industry management computer application etc. the algorithm has been applied into many combinatorial optimization problems such as the trainman ' s shift arrangement in avigation the optimization design of cargo arrangement in ship company

    對貨運車輛進行調度優化,可以提高物流經濟效益、實現物流科學化。對貨運車輛調度優化理論與方法進行系統研究是物流集約化發展、建立現代調度指揮系統、發展智能交通運輸系統和開展子商務的基礎。目前,問題的形式已有很大發展,該問題以不僅僅局限於汽車運輸領域,在水運、航空、通訊、力、業管理、計算機應用等領域也有一定的應用,其演算法已用於航空乘務員輪班安排、輪船公司運送貨物經過港口與貨物安排的優化設計、交通車安排、生產系統中的計劃與控制等多種組合優化問題。
  2. If the numerical value line resonance frequency plus some shaft connatural frequency of generator is equal to operation frequency, it brings about coupling resonance between generator and system, which maybe results in shaft rupture of synchronous generators

    氣諧振頻率與同步機的軸系某一固有振蕩頻率近似互補于頻時,將導致機系統的耦合振蕩,嚴重的會造成同步發機大軸的扭斷。
  3. Calculation of electric field distribution near ehv power towers

    超高壓輸鐵塔附近的三維場計算
  4. Power - frequency electric field of ehv transmission lines under condition of complex landscape

    復雜地勢下超高壓輸
  5. The route choice for fishway should follow the earlier principle and combine the actual situation of the project and decided by reconnaissance and measure of reconnaissance investor, design and constructing unit together

    魚道選擇遵循前面的原則,結合本站的實際情況,由投資方、設計和施單位共同進行勘察、測量而定。
  6. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的機具包括用於基礎施,桿塔組立、架纜施,光纜施序的18大類800餘種產品,如機動絞磨、絕緣架空纜及高壓纜剝皮器,各類鋁合金抱桿,以及導、地器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊器、起重滑車、尼龍輪或鋁輪放滑車等,系列全、品種多,產品具有藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。
  7. This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher

    本文分別建立了計算220kv復蓋壓升高及操作過壓的計算模型,利用emtp程序對220kv復蓋壓升高、投切空壓、投切空變過壓、單相故障過壓進行計算分析,並提出合理的防護措施。
  8. Erection works of electrical installations code for construction and acceptance of cable levels

    氣裝置安裝及驗收規范
  9. Basic requirements for design and test of construction machines and tools of overhead transmission line

    機具設計試驗基本要求
  10. Application of fx - 4800p - type electronic calculator to overhead transmission line construction

    型計算器在架空輸中的應用
  11. Found in 1990 by chairman johannes rehm, the company has since become a leading supplier of manufacturing technology for the electronics industry. rehm is setting standards in the development of design and fabrication of customer - specific applications for economic printed circuit board manufacturing, and the development of insert gas inflow soldering systems

    德國瑞姆於一九九零年由現任董事總經理johannesrehm先生創立,為全球子製造業的主要生產設備供應商,集團為印刷業開發和設計之迴流焊接系統在業界享有領導地位。
  12. Code for construction and acceptance of 110 kv over - head electrical power transmission

    架空及驗收規范
  13. As a result of the international advanced technology and detection means so that the test - bed habitat leading domestic level, can be quickly and easily, and visual on the domestic and import cars ignition system, the charge of the starting circuit, speakers circuit, lighting system, signal lines, electronic ignition components such as testing, inspection and adjustment, can also check the work of a car engine, engine fault diagnosis of the reason that test bed is the experimental large automobile repair shop, the second category repair shop and car essential for the use of the transport sector detection equipment, by all parts of the country auto repair trade management departments welcomed

    由於採用了國際上先進的技術和檢測手段,使本實驗臺居國內領先水平,可以快速方便,直觀的對國產、進口車的點火系、充系起動、喇叭、燈光系、信號子點火組件等進行試驗、檢查和調整,還可以檢查汽車發動機的作情況,診斷發動機故障的原因,所以本實驗臺是汽車大修廠、二類修理廠和汽車使用運輸部門必不可少的檢測儀器,深受全國各地汽車修理行業管理部門的歡迎。
  14. The power network detection information system based on gsm network is an intelligent product with computer technology, gsm mobile communication technology and signal processing technology, it can allow the real time detection of the voltage of the electricity transmission lines, can report the malfunction of the lines to the supervision center and the operators, and even can control relevant electricity equipments

    基於gsm網力網檢測信息系統是集計算機技術、 gsm移動通信技術、信號處理技術於一體的智能產品,實現對力網輸壓進行實時檢測,向監控中心和作人員報告故障,甚至輸出開關量控制相應力設備的功能。
  15. Specification for construction quality checkout and evaluation of electric equipment installation part 5 : cable line

    氣裝置安裝程質量檢驗及評定規程第5部分:質量檢驗
  16. They are conflict. in order to resolve the problem, this thesis putforward a new scheme of power supply by special ct with compensate function. analyzed the principle, and designed the structure. in order to reduce the start - upcurrent, there are some devices optimize for the circuit

    為了協調兩者的矛盾,本文提出了一種帶有補償功能的特製小ct供能方案,對其基本結構和作原理進行了分析,針對處于小況,設計中採用多種優化以盡量降低源的啟動流。
  17. Erection and acceptance regulations for overhead distribution lines with insulated conductors

    架空絕緣配及驗收規程
  18. It sets out the legal framework encompassing all the areas within which the concerned legislation shall apply, including the registration of electrical workers and contractors, the safety standards and requirements for electricity supply, electricity supply lines, electrical wiring and products

    該條例訂立法律架構,涵蓋有關法例適用的范圍,包括程人員及業承辦商的注冊,以及力供應、供纜、氣產品的安全標準和規格。
  19. Code for construction and acceptance of 110 500kv overhead transmission line

    110 500kv架空送及驗收規范
  20. Code for construction and acceptance of cable levels electric equipment installation engineering

    氣裝置安裝及驗收規范
分享友人