線閘 的英文怎麼說

中文拼音 [xiànzhá]
線閘 英文
calliper brake
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : anchor gate
  1. The study on single - pole adaptive reclosure of ehv transmission lines with the shunt reactor

    帶並聯電抗器的超高壓輸電單相自適應重合的研究
  2. At locks, isolated farmhouses and riverside pubs he would talk to people, hoping for hints of a military presence.

    在水、孤零零的農舍和河邊客棧,他同人聊天,希望能探聽到一些有關軍事駐地的索。
  3. After analyzing several kinds of protection for feeder line in subway dc traction power supply system, it is pointed out in the paper that the phenomena of refusing action and error action can not be avoided with existing protection which can not protect the whole feeder line

    摘要分析了地鐵直流牽引供電系統中幾種常用的饋保護類型,發現現有的保護方法很難避免跳保護拒動或誤動現象的發生,並且不能保護饋的全長。
  4. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  5. The bank of shanghai of university of shanghai, the park of zhabei of construction bank railway hospital, the green sea new station on the ground of daning, the subway extends line ( in building ), inner loop, zhonghuan ( while planning ), overhead on the 1st, form the three - dimensional network of communication lines

    上海大學上海銀行,建行鐵道醫院北公園,大寧綠地上海新客站,地鐵1號延伸(在建中) 、內環、中環(規劃中) 、高架,形成立體交通網。
  6. The main contents are as follows : 1. analyze and calculate the influence on network frequency and power flows on tie line when 660mw generator unit trips out from hbpn

    主要工作如下: ( 1 )分析並計算河北南網在發生660mw機組掉時,對電網頻率和聯絡潮流等方面造成的影響。
  7. The main contents in the paper are as follows : ( 1 ) the operational principle of the hydraulic automatic tilting gates with connecting lever and rolling wheel were analyzed. using block diagram, the author elaborated on the running course and steady factors of the tilting gate. then the instantaneous running center in the running course of the tilting gate was brought forward, and the trochoid of the center was described

    本文研究的主要內容如下: ( 1 )分析闡述了水力自動翻板門的工作原理和運轉機理,結合框圖詳細分析說明了翻板門的運轉過程及其穩定條件,給出了門在運行過程中的瞬心軌跡,分析研究了門運動過程中的基本平衡方程。
  8. Examples of " external works " include external carparks, paved areas, deep bored wells, cable ducts, draw in pits, fencing, and steel gates as mentioned in the above general specification

    外部工程的例子,在上述一般規格已有提到,包括戶外停車場、已鋪面地方、深鉆井、電纜槽、進坑、圍欄和鋼
  9. At eastbound and westbound causeway road opposite gate 1 of victoria park

    維多利亞公園一號對出的維園道東西行
  10. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  11. According to eigenvalue equation ( general formula ) of the energy method of the plane steel frame structure stability, and considering the restriction of the end of the column of the main steel frame and function of deflection curve gained from the differential balance equation general resolution, we get the equation for calculating the length coefficient of the main frame structure stability of the steel arch gate and the resolutions are also given

    根據平面剛架穩定性能量法特徵值方程(通式) ,考慮弧形鋼門主框架柱的柱端約束的特殊情況,求出撓曲函數(試解函數)通解,得到弧形鋼門主框架柱穩定性計算長度系數方程。其中弧門主框架主橫梁式形框架的臨界荷載比較現行規范推薦的有限元法簡單方便、結果精確及物理概念明確等優點。
  12. Delay trip multiple curves can choose the " inertia delay ", or to prevent electrical transformer loading terminal unnecessary trip

    多種延時跳可選購的"慣性延時" ,可防止電動機或變壓器負載端出現不必要的跳
  13. The check components and circuitry of forced main fuel trip should be separated from other control and monitoring system

    強制性主燃料跳的檢測元件和路,應與其他控制監視系統分開。
  14. According to the actuality of the studied water power station, the thesis combine the advanced fieldbus technique, ethernet and the traditional hydraulic technique together, and use them to design the supervise controlling system of the water power station. base on the gate - controlling request of the water power station, designed the gate ' s hydraulic hoist system

    文章從結合所研究的水電站的實際需要出發,將先進的現場總技術、以太網技術與傳統的液壓技術相結合,並應用到水電站門監控系統的實際設計過程中。論文根據所研究水電站門控制的具體技術要求,設計了適合該水電站的液壓啟閉機系統。
  15. Based on the research of several shiplocks, the temperature and stress field of the lock floor is simulated under temperature and gravity loads, where the shiplock floor is built on different foundations, the effect of setting up wide construction joints is analyzed by the nonlinear finite element method

    作者通過對多個船工程的研究,結合非性有限元模擬分析方法,考慮重力、溫度等荷載,計算分析土基和巖基上船結構底板預留寬縫施工方法的效果。
  16. Various factors that influence lightning strike switching rate are also analyzed. it has been showed that for some given configuration, all lightning over - voltages on substation equipments do not exceed the 1ightning strike insulation level in the case of invading waves out of lightning strike aerial input protection line

    同時利用規程法、行波法、擊距法對輸電路中不同桿塔型號的耐雷性能分別進行了研究和比較,對影響輸電路雷擊跳率的各種因素進行了分析。
  17. Close the upper pipe ram and open the kill line valve

    關上部鉆桿板防噴器,開壓井管閥。
  18. After the observing of transmission line for a lightning storm season, we did n ' t find the lightning trip. the result indicates line - surge arrester can improve lightning - proof property evidently and reduce the lightning tripping outage

    通過兩個雷雨季節的觀察,發現110kv雙含沒有再發生雷擊跳故障,表明了路型避雷器能明顯改善山區輸電路的防雷性能,降低輸電路的雷擊跳率。
  19. According to these accomplishments, several techniques are expounded emphatically in this paper, including 3d refraction statics, coherent noise suppression by prestack wave field separating ( prestack fx noise attenuation ), 3d prestack multiple domain random noise attenuation, multiples attenuation, nmo of unsymmetrical hyperbola, dynamic replacement of wave equation, surface - inconsistent residual static, super bin stacking, poststack depth migration and prestack depth migration. all the techniques have been applied in seismic processing of 2d, 3d and wide - line profiling and obtained good results

    本文根據項目組研究成果,重點述了三維折射波靜校正技術,疊前波場分離相干噪音壓制方法(疊前fx去噪) ,疊前三維多域隨機噪音衰減技術,多次波衰減技術,非對稱雙曲動校正技術,波動方程動態替換技術,非地表一致性的剩餘時差靜校正技術,超面元迭加處理技術,疊后深度偏移處理,疊前深度偏移處理等。
  20. Through improvement of construction technology of chamfer of zaohe river third - line lock ' s chamber wall, the inclined surface concrete quality has been well controlled

    通過對皂河三室墻倒角施工工藝的改進,斜面砼表面質量得到了較好的控制。
分享友人