縱向坡度 的英文怎麼說

中文拼音 [zōngxiàng]
縱向坡度 英文
cross fall
  • : Ⅰ動詞1 (釋放; 放走) release; set free; let go 2 (放任; 不約束) indulge; give oneself up to; l...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 縱向 : [造紙] direction; machine direction; endwise; longitudinal direction; vertical; longitudinal縱向...
  • 坡度 : falling gradient; slope; inclination; declivity; pitch; batter
  1. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角進行了初步研究: 1 、抗震性能分析1 )湯峪河吊桿拱支承結構的地震效應較小;吊桿式拱架結構動力特性取決于槽墩和主拱圈的剛,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高和重心,在構件連接和變截面處增設梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的應力集中造成的壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  2. Of an angle of over 70 degrees are ever - present while the south - west side is blanket - ed in snow all the year round. halfway up the mountain, ravines abound and gulles crisscross. " rolling stone " and " wolf s fang " areas scattered with huge rocks from t

    雪寶頂東北為70以上的懸崖絕壁,西南終年積雪,山腰溝壑橫,通頂峰之路又必經怪石崢嶸,險景叢生的滾石區和「狼牙區」 ,有較大的攀登難,對登山探險者很有吸引力。
  3. The slope zone in northern biyang sag is characterized by complex structure, developed minor fault blocks, varied seismic vertical and horizontal velocities and difficult to get imaging, which result in that conventional imaging approaches are hard to meet the needs for exploration and development of this area

    摘要泌陽凹陷北部斜帶構造復雜,小斷塊發育,地震、橫變化劇烈,成像困難,常規的地震成像方法成果難以滿足勘探開發的需要。
  4. Results showed that the temperature distribution of the traditional embankment was asymmetrical ; the asymmetrical status was changed after ripped - rock revetment was installed and the soil under the ripped - rock was cooled obviously ; the ripped - rock revetment could cool embankment and adjust the temperature difference between the north - facing slope and the south - facing slope ; the ripped - rock revetment was an available technique to protect embankment from thawing settlement and longitudinal cracks in permafrost regions

    結果表明:普通路基的陰陽兩側溫分佈極不對稱;鋪設拋石護后,這種狀況得到了很大改善,並且拋石護下土體溫明顯降低;拋石護能夠降低路基溫和調節路基陰陽的溫差異;拋石護是多年凍土區防治路基融沉和裂縫病害的一種可行措施。
  5. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道橫斷面優化方面,本文在利用已經比較成熟的橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精,有助於準確控制工程投資規模及資金投。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
分享友人