置井 的英文怎麼說

中文拼音 [zhìjǐng]
置井 英文
okii
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. Sq - a setting - ball carrier assembly is system which can help hydraulic liner hanger to hang liner in horizontal or high - deviated wells. it comprises setting - ball carrier, latch collar and baffle

    一種幫助液壓尾管懸掛器在大斜度及水平中座掛的特殊裝,與尾管懸掛器配套使用,可保證尾管固的順利完成。由送球器、鎖緊座、擋板組成。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深荷試驗裝的核心部分? ?反力裝,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. Open raise implies that building work is limited to the raise catwalk and the basis of a simple platform on which drilling personnel stand.

    開放式天,是指那些開挖過程中只需設升降梯道及供鉆工站立的簡單基礎平臺的天
  4. Use one of the many clapboard style, can be easily placed children ' s toys, books, the children ' s space orderly

    選用許多隔板式樣的,可方便放兒童的玩具、書本,使孩子們的空間然有序。
  5. When it has been decided where we are going to drill, we put up at the surface an oil derrick.

    決定了鉆孔位后,我們就在地面上豎起架。
  6. It can be dispart 137 sand layers in the droop of 15 sand groups and adds up to 1191single sand layers, summarizes 7 types of correlation : steady, spite, pinch, stack, stack - pinch, stack - spite, complex in the work. the relation between the distribution types of substrata with reservoir levels are four types of reservoir, and i, ii are good reservoir of gas in bawu gas field

    通過對15個砂層組內的小砂層進行認真、詳細地劃分,在垂向上共劃分出137個小層,共計1191個單砂層,並總結出七種間小層對比分佈類型:穩定分佈型、分叉型、疊尖滅型、穩定疊型、重疊分叉型、復合型。
  7. The management work data of oil - field earthquake exploration and oil - well position, which has not only data of current space position, but also entitative attribute data describing, have great capacity, traditional cad graphics describing the data plus the model database managing mode ca n ' t already adapt the modem exploration with well geography information for management work demand, so it is necessary to realize the unique management of exploration and oil - field well space data and attribute data use advanced geography information system ( gis ) technique, this thesis is based on the excellence ' s table ' s top geography information system - the maplnfo software, using the second process technique, the digital relief map and tectonic map as the base map, the earthquake exploration database as the original data, established the gis of the exploration and oil - field well in the area of the liaohe oil - field, realize visualization management, it provides a reference thereunder for the earthquake exploration deplo ying the workload and proceeding the technique design, and completed lots of practical work

    油田地震勘探與油位管理工作數據量大,既有空間位數據,又具有實體的屬性描述數據,傳統的cad制圖+屬性數據庫管理模式已經不能適應現代勘探和位管理工作的需要,採用先進的地理信息系統( gis )技術,實現勘探和油田位空間數據和屬性數據的統一管理是必然的趨勢。本文以優秀的桌面地理信息系統mapinfo軟體為開發平臺,在此基礎上進行二次開發,以數字化地形圖、構造圖為載體,以地震勘探數據庫為數據源,建立了遼河油田范圍內的地震勘探和油田管理信息系統,實現了數據的可視化管理,為地震勘探部署工作量、進行技術設計,提供了圖形和數據的參考依據。並完成了很多實際工作。
  8. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游洪水位變幅較大等環境條件下,貫流式水電站副廠房設自然通風採光天的空間條件及其技術性和經濟性,討論了天原則和空間尺度與形態處理,給出設計實例並初步評價了天通風採光的效果。
  9. Based on 3 - d seismic well and logging data, mainly by means of advanced seismic theories of reservoirs prediction and other corelational multidisciplinary, an extensive and indepth studying on the tight sandstone reservoir with fracture of the second part of the xujiahe formation in west sichuan depression has been carried out. a series of theoretical viewpoints and research fruition are concluded as follows :. 1 on the basis of analysis of the regional and local structure characteristics and evolution, a conclusion comes in to being : inchoate and nowadays structure traps and the match model between structure and fracturation system are the main factors in controlling the formation of effective traps

    本文綜合利用三維地震、鉆、巖心、測資料,採用地震儲層預測方法為主線的多學科綜合研究思路對川西坳陷上三疊統須家河組二段緻密裂縫性砂巖儲層進行了較為廣泛、深入的研究和探索,取得以下一系列理論認識和研究成果: 1 、通過區域及局部構造特徵及構造演化史分析,認為古今構造圈閉、構造與斷裂系統配關系是控制有效圈閉形成的主要因素。
  10. The jdf - 2 type case hanging basket guards against automatically falls mainly uses in the direct motor drive hoisting mechanical well type case hanging basket, as the type case hanging basket using of safekeeping of security, it installs in the hanging basket crossbeam both sides, along including guide rail is rising and falling, when the motor drive type case hanging basket in the fluctuation process, meets overweight, overspeed, steel wire attrition and other reasons creates the hoisting cable or the junction device snaps suddenly, when under hanging basket weightlessness falls, guards against falls can automatic brake, thus achieved avoids falling the basket to offend somebody

    Jdf - 2型字架吊籃自動防墜器主要用於由電動機驅動的卷揚機字架吊籃,作為字架吊籃的安全保護之用,它安裝在吊籃橫梁的兩側,沿含著導軌升降,當由電動機驅動的字架吊籃在升降過程中,遇超重超速鋼絲繩磨損等原因而造成提升鋼絲繩或連接裝突然破斷,吊籃失重下墜時,防墜器能自動剎車,從而達到避免墜籃傷人重大事故發生的目的。
  11. Based on the fromer study of mine tectonic, hydrology, tunnel deformation, etc., 3 - d numerical simulation of current tectonic stress field of lvjiatuo coal mine was done in this thesis, combining with local hypocenter mechanism solve and relational stress in - situ measuring value regression analysis has been done to the simulation result, and the reasonable results are gained those will offer dependence for disposing the tunnels more rational and making tunnel supporting more economical and safer

    摘要本文在前人對呂家坨礦進行礦構造、水文地質、巷道變形等研究的基礎上,結合該地區的震源機制解及有關的應力實測值,對礦區現今構造應力場進行了三維數值模擬,並對模擬結果進行了線性回歸分析,得到了與現實較為符合的結論,為更合理的巷道布和更經濟而安全的巷道支護提供依據。
  12. Kongxi buried hill shows following features in the seismic profiles : the structures are asymmetric. there is flexural syncline on the east side and a monocline on the west side. asymmetric repetition of stratigraphic units is present in the drill wells and the dips of beds and faults are gentle. the permo - carboniferous system of both sides almost lie in the same slope and the events of cambrian or upper proterozoic are continuous from east to west. the phenomenas suggest that kongxi buried hill could be a thrust belt been traced which consists of reverse faults. the imbricate faults mainly effect pre - jurassic strata. there are obvious angular unconformity between jurassic - cretaceous system and paleozoic involved deformation of thrust. the thrust front in some place has cut off the beds of jurassic - cretaceous system. the structural style of the thrust structure changes along the strike of the kongxi buried hill

    地震和鉆資料揭露的孔西構造帶前第三系潛山的地質特徵可以歸納為:構造帶總體上不對稱構造帶內部有地層重復現象石炭二疊系地層的位明顯高於兩側的同一地層的高度。用由34條向東傾斜的逆沖斷層組成的疊瓦扇構造模式能夠比較合理地解釋上述地質特徵。該帶向東傾斜的逆沖疊瓦狀斷層組主要影響前侏羅系地層,侏羅白堊系與捲入逆沖構造變形的古生界地層之間有明顯的角度不整合。
  13. Application of overwinding buffer and supporting cage device used in vertical mine

    提升過卷緩沖托罐裝的應用
  14. In view of the poor stop accuracy, unstability of climbing at reduced or low speed and over - winding of mine ac lift when power braking is used, a siemens all - numerical rectification device is applied in the braking system of mine lift and its control mechanism and method are described

    針對採用動力制動礦交流提升機停車準確率差,減速與低速爬行不平穩及產生過卷的問題,將西門子全數字整流裝應用到提升機制動控制系統,並介紹了該系統的控制原理與方法。
  15. Abstract : in view of the poor stop accuracy, unstability of climbing at reduced or low speed and over - winding of mine ac lift when power braking is used, a siemens all - numerical rectification device is applied in the braking system of mine lift and its control mechanism and method are described

    文摘:針對採用動力制動礦交流提升機停車準確率差,減速與低速爬行不平穩及產生過卷的問題,將西門子全數字整流裝應用到提升機制動控制系統,並介紹了該系統的控制原理與方法。
  16. Yvonne had reorganized the kitchen, which was now orderly and gleaming.

    伊馮娜重新布了廚房,經她一整,現在一切有條到處錚明瓦亮。
  17. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨水管渠設計中的設計重現期、截流倍數等設計參數的選擇、雨水集水點位的確定、截流式合流制管渠與截流干管的連接方法以及溢流溢流量的計算等問題進行了探討。
  18. The dry pit submersible pumping units shall be self contained, close coupled pump / motor units designed to operate at continuous full load either submerged or non - submerged without the need for any external cooling devices or water jackets

    這類乾潛水泵裝應該配齊全,泵和電機緊密結合,在淹沒或沒有淹沒狀態下能夠全負荷連續運轉,不需要任何外冷卻設備,如水套等。
  19. In order to meet the requirements of nda measurement, the laboratory of technical research for nuclear safeguards of china institute of atomic energy ( ciae ), is being in charge of developing four sets of nda standards : one set of segmented gamma - ray scanner ( sgs ) uranium standard, one set of sgs plutonhim standard, one set of plutonium isotopic standard, and one set of active well coincidence counter ( awcc ) standard. in this dissertation some pivotal techniques on quality control in developing of nda nuclear standards above were emphatically studied

    中國原子能科學研究院核保障技術重點實驗室研製分段y掃描裝( sgs : segmentedgamma - rayscanner )鈾工作標準樣品、 sgs鈈工作標準樣品、鈈同位素標準樣品和有源中子型符合計數裝( awcc : activewellcoincidencecounter )鈾工作標準樣品來滿足核材料nda測量的要求。本論文重點對上述nda核標準樣品研製過程中質量控制的一些關鍵技術進行了研究。
  20. Analogy analysis on application of lifting support device

    對礦提升托罐裝的應用類比分析
分享友人