聯系數法 的英文怎麼說

中文拼音 [liánshǔ]
聯系數法 英文
method of correlates
  • : Ⅰ動詞(聯結; 聯合) unite; join Ⅱ名詞(對聯) antithetical couplet
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 數副詞(屢次) frequently; repeatedly
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 系數 : [數學] coefficient; ratio; modulus; quotient; factor
  1. By extension theory of fuzzy set, definitions of fuzzy expect payoff and fuzzy goal of each player are given to introduce the concept of the attainment degree of fuzzy goal. furthermore, attainment degree of aggregated fuzzy goal is introduced as a commensurable measure. there are two methods in this paper to aggregate fuzzy goals : aggregation by weighting coefficients and aggregation by a minimum component

    通過模糊集的擴展原理得到盟的模糊贏得矩陣,通過定義每個局中人對其每個對象的模糊期望贏得、模糊目標,引出模糊目標實現度這一概念,進而引入合模糊目標實現度的概念來統一度量,並給出了兩種合模糊目標的確定方:權重與最小分量
  2. An algorithm of correlative coefficients, between any two nodes of filiation or fraternal relationship of extended product main structure, was presented

    提出了擴展的產品主結構中各個父節點與其子節點之間,以及同級的各個兄弟節點相互之間的關計算方
  3. A suitable assessment method for second - hand machinery was established based on multi - indicatrix of unified assessment method in this paper. evidence theory was used to define index - system for second - hand machinery and succeeded in fusing different experts " opinions impersonally in order to lessen the risks in the paper. pair - set theory, a new method was introduced to confirm relative criterions by quantitative analyses

    集對分析是一門新興的學分析方,文中引入該方成功地解決了相對標準選擇缺乏定量方的問題,使其克服了設備估價中參照物選擇依賴決策者個人意志的缺陷,按照學分析思想代替個人的主觀判斷,簡便適用,很適合在實踐中使用。
  4. Utilising dissolved gases analysis, a new insulation fault diagnosis method for power transformers is proposed. this method is based on the group grey relational grade analysis method. first, according to the fault type and grey reference sequence structure, some typical fault samples are divided into several sets of grey reference sequences. these sets are structured as one grey reference sequence group. secondly, according to a new calculation method of the grey relational coefficient, the individual relational coefficient and grade are computed. then according to the given calculation method for the group grey relation grade, the group grey relational grade is computed and the group grey relational grade matrix is structured. finally, according to the relational sequence, the insulation fault is identified for power transformers. the results of a large quantity of instant analyses show that the proposed method has higher diagnosis accuracy and reliability than the three - ratio method and the traditional grey relational method. it has good classified diagnosis ability and reliability

    基於變壓器油中溶解氣體分析,提出了一種基於群灰色關度分析的變壓器絕緣故障診斷新方.首先根據故障類型與灰色參考序列構造,選擇變壓器典型故障樣本構造多組參考序列,這些參考序列組構成一個灰色參考序列群.其次根據給出的新的關計算方,計算個體關和關度.然後根據給出的群灰色關度計算方,計算群灰色關度和構造群灰色關度矩陣.最後根據關序識別變壓器絕緣故障診斷.通過大量變壓器絕緣故障診斷實例分析,所提方診斷準確性與可靠性優於三比值和傳統的灰色關分析方,具有較好的分類診斷能力和可靠性
  5. The trial data of yield of cane and sugar from the fourth national sugarcane variety united trial in yunnan were analyzed by the stability parameter and high stable coefficient ( hsc ) method

    摘要用穩定性參和高穩對全國第四套甘蔗合區試種在雲南省農業科學院甘蔗研究所的蔗糖產量進行綜合比較分析。
  6. Some practical method to lifting the rated capacity of vsc - hvdc is discussed. ( 4 ) the subsynchronous oscillation ( sso ) characteristics of a synchronous machine connected to a static var compensator is studied with the complex torque coefficient method realized by time domain simulation, and some important conclusions are obtained which can guide the design and operation of svcs to avoid sso problem

    ( 4 )基於時域模擬實現的復轉矩,對與靜止無功補償器svc相接的同步發電機組的次同步振蕩( sso )特性進行了深入的研究,得出了一些重要結論,可為svc的設計和運行提供避免sso的依據。
  7. By using the way of gray correlation degree, this study analyzed the gray correlation coefficient, correlation degree and correlation order among seven main characters in 20 groups of parents and hybrids of two - row hulled malting barley

    摘要研究採用灰色關分析方,對20組二棱型啤酒大麥雜種一代及其親本的7個主要性狀之間的關、關度和關序進行了分析。
  8. Assessment of social and economic environment of railway construction project on grey correlation method

    基於灰色關聯系數法的鐵路建設項目社會經濟環境影響評價
  9. In optimal decision model : ( t ) nine main environmental impact indexes are summarized and qualmed from the main aspect of environmental impact of road construction based on the principles of comparability and measurability ; ? calculate each index with analytic hierarchy process, and introduce the concepts of educing matrix and absolute coincidence matrix to adjust judgment matrix in order to meet with satisfactory consistency ; ( 3 ) introduce the distance to calculate the weight of expert ; ? analyze the relationship coefficients with gray relationship method, then integrate the weights of indices and experts with them to obtain the compositor of ail of the schemes

    在方案優選模塊中:針對公路建設中環境影響評價滯後於公路建設的現象,將環境因素的影響提到設計階段,並對環境指標進行了重點分析,提出了用於比選的9個定量指標;採用層次分析確定各級指標的權重,並對判斷矩陣予以修正;引入距離測度的概念解決各專家的權值問題;運用灰色關分析各指標的關,並結合指標權重、專家權重,最終得到各方案的關度優劣排序。
  10. The direct and inverse models of velocity and acceleration are founded by approach of influence coefficient and principle of rigid body moving, and furthermore, studies its movement - viewed problem

    運用運動影響及剛體運動原理推導了6 - sps並機器人速度和加速度的正反解模型,並研究了其運動可視化的問題。
  11. After the remittance please immediately the remittance amount, the remittance city, the remittance bank, the purchase product quantity, the specification as well as mails the information address, zip code, addressee, telephone, the contact method through the telephone message we, or will remit money the bottom single shot facsimile for the our company, on the bottom list indicates the correlation information, the relation method : 24 hours consultation orders hot line : 010 - 51260257

    匯款后請立即把匯款金額匯款城市匯款銀行購買產品量規格以及郵寄信息地址郵編收件人電話方式通過電話通知我們,或將匯款底單發傳真給我公司,底單上註明相關信息,: 24小時咨詢訂購熱線: 400 676 0068
  12. Method 2 is the research based on connection number state sort

    二:用態勢排序方對工序實現可能性的研究。
  13. Predicting ultimate bearing capacity of pile foundation by connection number method

    的方進行樁基極限承載力的預估
  14. A new method of evaluation of measurement uncertainty for steel bar tensile strength based on connection number

    基於的鋼筋抗拉強度測量不確定度評定新方
  15. To be dealed agaist extended data, this thesis has improved on and come true arithmetic of time sequence model, and amended conventional decision tree arithmetic, introduced the decision tree arithmetic for extended data, namely threshold value control approach. according to threshold value and concept hierarchy, threshold value control approach can set up the concise and statistic classification tree. at the same time, based on the theory of the concept lattice, this thesis introduces the arithmetic of mining association rules based on quantified concept lattice reduced by uncertainty coefficient

    針對泛化后的據,本文改進並實現時間序列模式發現演算;修改了傳統的決策樹演算,提出了一種適合於泛化據的決策樹構造演算:閾值控製,閾值控製通過閾值和概念層次的控制,可以建立簡潔明了、具有統計意義的分類樹;在概念格理論基礎上提出了基於不確定挖掘關規則的演算
  16. A new method to build the semi - quantitative system relating matrix was advanced, it was constructed via the dynamic envelopes, which were built by gm ( 1, 1 ) based on the qualitative binning of observing data current of part variables, and its elements were calculated by the ratio of variable states ' corresponding areas in the dynamic envelopes

    為了實現這一目標,一種新的統半定量關矩陣的構建方被提出,它以統部分變量觀測據流的定性劃分為基礎,應用灰色gm ( 1 , 1 )模型建立其統動態包絡,並以動態包絡中變量各種狀態的對應面積之比作為它們的關
  17. But it is difficult to determine the productive time of a working procedure, there is uncertainty of it. this uncertainty is random, fuzzy and intermediate uncertainty, which can be dealed by connection number method

    然而在許多情況下,估計項目活動持續時間是非常困難的,項目活動時間具有不確定性,是用來處理模糊,隨機,中介不確定性的統理論和方
  18. Method 1 is based on spa method of comprehensive judgment. case ( 1 ) : several experts in this field estimate connection number of productive time of a working procedure. expression of connection number is got by method of comprehensive judgment, which considers every experts suggestion

    一:基於集對分析的工序作業時間綜合評價:情況(一) :由若干名領域專家分別估計出工序作業時間的表達式,用綜合評判得出全面考慮各名專家意見的用表達的工序作業時間。
  19. Factors which influence productive time of a working procedure, can be divided into several grades, four grades in this thesis, that is : { absolutely completion, completion, probable completion, unable completion }. corresponding elements of state sort table are adopted, that is four elements state sort table. connection number expression is found by the method of weighted value

    對影響工序作業時間的若干影響因素( f _ 1 f _ n ) ,可以根據需要將評判結果分為幾個級,比如分為{肯定完成,能完成,可能完成,不能完成}四個,那麼應採用相應元的態勢排序表,即四元態勢排序表;然後運用加權平均求出工序作業時間的
  20. Abstract : taking verification information management system of hardness specimen as an example, a method of realizing concept design and realization design of data - base by e - r method ( entity - relationship approach ) is introduced

    文摘:以硬度塊檢定信息管理統的設計為例,介紹了一種用e - r方(實體-)實現據庫的概念設計、實現設計的方
分享友人