肥大變性試驗 的英文怎麼說

中文拼音 [biànxìngshìyàn]
肥大變性試驗 英文
mastdegeneration test
  • : Ⅰ名詞1 (肥料) fertilizer; manure 2 (姓氏) a surname Ⅱ動詞1 (使肥沃) fertilize 2 (由不正當...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 肥大 : 1. (又寬又大) loose; large 2. (粗大) corpulent 3. [醫學] (身體某部分體積增大) hypertrophy
  • 試驗 : trial; experiment; test
  1. The results of the experiment showed that applying silicon fertilizer could improve the disease resistance, especially for the rice blast and changeable brown ear ; acquire high efficient tiller rate, high solid rate, big spike and could grow up at green stem

    摘要研究表明,施用硅水稻抗病明顯增強,抗稻瘟病和褐穗效果較好;施硅水稻有效分集率高、結實率高、穗粗多、活稈成熟。
  2. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、河、蓮花等型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工與數值分析」咨詢成果已應用於國家重點工程甕福礦基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
分享友人