背橋 的英文怎麼說

中文拼音 [bēiqiáo]
背橋 英文
back arch
  • : 背動詞1. (用脊背馱) carry on the back 2. (擔負) bear; shoulder
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. The paper is based on an arcuated built - up system bridge - zhongshan no. one bridge to be built in guangzhou, adopts the large universal finite element programme ansys, takes spatial action among members into account, establishes a three - dimension finite element model, and discusses the following several aspects : firstly, when three - dimensional finite model of a complicated bridge is founded, a beam - lattice method is a kind of applied and effective spatial analysis method, which is used to analyze superstructures of a bridge

    本文以廣州市中山一景,採用大型通用有限元程序ansys ,考慮構件間的空間相互作用,建立了三維的有限元模型,重點對以下幾個方面進行深入探討:首先,在對復雜的梁結構進行三維的有限元模型建立時,梁格法是分析樑上部結構比較實用而且有效的空間分析方法。
  2. In single pylon cable stayed bridges, and cable stayed bridges without backstays, when the bottom of the tower bears the moment from the dead load, it is concluded that non - symmetric configuration of pile cluster corresponding to the upper structure is more practical than symmetric configuration of pile cluster

    當獨塔斜拉、無索斜拉梁塔底永久作用有彎矩時,與完全對稱的基礎形式相比較,和上部結構相協調的不對稱基礎形式更加適用。
  3. Midge : it ' s brand new. revolutionary up - lift : no shoulder straps, no back straps, but it does everything a brassiere should do. works on the principle of the cantilevered bridge

    米姬:這是全新的。革命性的改良。沒有肩帶,也沒有帶,但是所有胸罩的功能它都有。運用懸臂式梁的原理來支撐。
  4. The paper is based on the construction of the express - highway between yiyang and changde in hunan province, aiming at enhancing the serviceability of cement concrete pavement, probing into the structural assemblage of the cement concrete pavement, the roadway drainage system, contraction joint with the dowel bar and precaution of bumping at the end of the abutment. it presents some achievements of the research, including more reasonable structural assemblage and roadway drainage system, the method of setting dowelled bar in contraction joint, putting forward the concept of stage - transition from rigid to flexile behind abutment

    本文以湖南省益陽至常德高速公路項目為依託,以提高水泥混凝土路面使用性能為目標,就水泥混凝土路面結構組合、路面排水系統、縮縫設置傳力桿、頭跳車問題的防治等方面開展研究和工程實踐,取得了豐富的研究成果,如研究採用了更合理的路面結構組合,設置了較完善的路面排水系統,在國內高速公路上率先全面採用縮縫加傳力桿技術,對所有涵構造物臺全部採用剛柔過渡技術處理頭跳車問題等。
  5. The most notable yellow mountains pines are : yingkesong greeting pine in front of lion stone at jade screen tower, songkesong farewell pineto the right of jade screen tower, putuansong hassock pine in lotus gully, feng huangsong phoenix pine in heavenly sea, qipansong chessboard pine at pingtian stone bridge, jieyinsong usher pine on beginning - to - believe peak, qilinsong unicorn pine, on the way from north sea guesthouse to cool terrace, heihusong black tiger pine, on the way from north sea guesthouse to beginning - to - believe peak, tanhaisong or wusong probe - the - sea or dancer pine by crucian carp s backon celestialcapital and wolongsong recumbent dragon pine below beginning - to - believe peak

    最著名的黃山松有:迎客松位於玉屏樓的石獅前面,送客松位於玉屏樓的右邊,蒲團松位於蓮花溪谷,鳳凰松位於天海,棋盤松位於平田石,接迎松位於始信峰,麒麟松位於北海賓館和清涼臺之間,黑虎松位於北海賓館和始信峰之間,探海松或叫舞松位於天都峰的鯽魚旁邊這就是黃山的十大名松。
  6. The limited hydrothermal karst and mixed zone beneath the anticline axis controls the porosity distribution of ordovician system and it is anticipated that surroundings of the axis of fold formed by compressional reverse orverthrusting during indo - chinese epoch and the coordinated area of morphology of anticline in the screen of buried hill and that of top surface morphology is the best position for development of the reservoir

    局限的熱液巖溶和裸露的斜軸部之下的混合帶對千米潛山奧陶系孔隙分佈具有重要控製作用,預期在印支期擠壓逆沖作用形成的斜軸部,特別是潛山內幕斜形態與潛山頂面形態相互協調的區域,應是儲層發育最好的部位。
  7. You should try driving on bay shore route, as dusk closed in. rainbow bridge in setting orange sky and the twinkle grand ferris wheel at palette town are must - viewing

    以夕陽映襯的桔紅色天空為景的彩虹,還有夜空中閃耀的都市調色板的游覽車的燈飾,相信這樣的景色你一定不願錯過!
  8. Anteklise filling plans for bridge and culvert structures in expressway

    高速公路涵構造物的臺填築方案
  9. Based on summing up construction controlling technology of cable - stayed bridges of home and abroad, taking qingdao danshan cable - stayed bridge as project background, this paper has a particular study to the construction controlling for the twin - united body one pylon cable - stayed bridge

    本文在總結國內外斜拉施工控制技術的基礎上,以青島丹山斜拉為工程景,就雙聯體獨塔斜拉施工控制問題,有針對性的展開研究。
  10. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以長沙市洪山大為工程景,對組成面板系的多排懸臂鋼-混凝土組合梁的受力特點進行了研究和探討。
  11. This paper takes the steel constructions workshop building of bao ji bridge girder plant as background, inquiring into using isothermal level jet airflow to cut off workshop in the middle to organize airflow in it, attempting to resolve the problem of ventilation and dust removal in large space which has changeable dust source

    本文以寶雞梁廠鋼結構車間的噴丸打磨廠房為工程景,探討運用等溫水平射流進行空間隔斷,合理組織室內氣流,嘗試解決具有高大空間、變動塵源特點的高大廠房通風除塵問題。
  12. There is also a crisscross path which extends for 5 kilometers. within the garden, objects such as artificial mountains, ponds, bridges, flower stands, stone benches, and sports grounds, are all to be found. moreover, there are three bonsai zones in the hubei vicinity. these are called assongyuan jhuyuanandmeiyuan

    五公尺寬之條石道路長一公里許,人行步道約長五公里,園內假山水池小及花架石椅健身場,無所不具,另外公園虎區建有三處盆景區,分別命名為松苑竹苑及梅苑專門培育盆景。
  13. The three - dimensional flutter analysis in frequency - domain of suspension bridges and theirs flutter stability when construction is carried out in terms of dealing with the project of constructing a suspension bridge ? ancang jiang bridge, besides with other engineering projects

    本文以瀾滄江懸索為工程景,結合其他幾個工程實例,討論了三維顫振頻域分析方法和懸索施工階段的顫振穩定性問題。
  14. In the engineering background of a suspension bridge tender project, taking the bridge and the airflow as a whole system, the effectiveness of the surface in the flutter stability of the system is studied by a multi - mode flutter analysis approach

    以某懸索設計方案為工程景,把梁與氣流作為一系統,應用多模態顫振分析方法,研究了在主梁下風側設置翼板這種控制措施對改善該系統顫振穩定性的效果。
  15. Discussion on quality control and construction technology of backfilling behind abutments of bridges and culverts on high - type highways

    高等級公路涵臺回填施工工藝與質量控制探討
  16. It is showed in wind - vehicle - bridge system vibration analysis that cross wind action can remarkably increase the response of bridge and vehicle. generally, the response of bridge and vehicle are increased with wind speed and train speed, one case that vehicle is on leeward side of deck is more unsafe than another case that vehicle is on windward side of deck. nonlinear factors can more influence bridge than vehicle

    風?車?系統耦合振動分析結果表明:考慮風的作用會顯著增加車輛和梁的響應;車輛和梁的響應總體上隨風速和車速的提高而變大;車輛位於風側時較迎風側時更為不利;非線性因素對梁的影響較車輛的要大。
  17. Presented in this thesis is a model test of the arch ribs segment with concrete filled steel tube ( cfst ) of maocaojie bridge, which is located in the yiyang of the hunan province and provides the engineering base for the test

    本文以湖南省益陽茅草街大為工程景,進行了茅草街大主拱圈鋼管混凝土拱肋拱頂1 : 5節段模型試驗。
  18. Descending the celestial capital peak westwards, travelers go through the immortal gate keeper cave with vivid peach - resembling rock formations on the cave, pass crucian carp peak formed during the glacial period and cross the heavenly bridge where the sea exploring pine stands

    在天都峰的西側往下走,人們要依次經過「仙人把洞門」 ,鯽魚和天, 「仙人把洞門」上有形狀如桃花的巖石,天鯽魚松形成於冰川時期,天上生長有探海松。
  19. Therefore, one can not claim to have been to the yellow mountains without reaching the celestial capital peak. descending the celestial capital peak westwards, travelers go through the immortal gate keeper cave with vivid peach - resembling rock formations on the cave, pass crucian carp peak formed during the glacial period and cross the heavenly bridge where the sea exploring pine stands

    在天都峰的西側往下走,人們要依次經過「仙人把洞門」 ,鯽魚和天, 「仙人把洞門」上有形狀如桃花的巖石,天鯽魚松形成於冰川時期,天上生長有探海松。
  20. In these thesis, on the basis of existing data collected of arch bridges and dynamics, simply introduce the development and application of the analytical method and finite element numerical analysis method of arch bridges. taking the example of pubugou cfst arch bridge, establish 3 - d finite element model of it with software ansys, and analyze its natural vibration. the effects on inherent vibration of the differences of structure parameters, the restriction of the deck and the effects of different arrangements of cross braces are analyzed

    本文在收集有關拱及動力學資料的基礎上,分析了拱動力學的解析分析法和有限元數值分析方法的優缺點,同時以瀑布溝大景,使用ansys軟體建立了空間有限元模型,實施了跨結構的自振特性分析;並分析了考慮到模型簡化過程中部分結構參數取值差異、面板的約束狀況不同等因數對自振特性結果的影響;此外還對面上的橫撐布置不同導致對自振特性的影響作了分析。
分享友人