能量坡降線 的英文怎麼說

中文拼音 [néngliángjiàngxiàn]
能量坡降線 英文
energy line
  • : 能名詞(姓氏) a surname
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 能量 : 1 [物理學] energy; amount of energy 2 (能力) capabilities; capacity; 能量不滅 conservation of e...
  1. In this paper, first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed, especially the relationships between gradation, strength and maximum dry density, long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn. by in - situ tests and researches on compacting mechanism of high - filled rock embankments, effecting factors on compaction, construction technology and shock compacting technology, obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction. by deeply research on the theory and methods of quality control of high - filled embankment, settled are the questions as quality detection method and control standard of high - filled rock embankment

    本文首先總結和分析了國內外公路和壩工行業已有的相關成果,深入探討了填石料的工程性質與最大幹密度、長期穩定性等之間的關系,得到了一些有益的結論;通過現場試驗路堤的試驗和對高填石路堤壓實機理、填石路堤壓實效果影響因素、施工工藝和沖擊壓實技術等研究,解決高填石路堤壓實工藝和最優碾壓參數控制等技術問題;通過深入研究填石路堤壓實質控制原理和方法,解決高填石路堤壓實質檢測方法和控制標準技術難題;解決高填石路堤沉觀測技術問題,並根據沉觀測結果研究高填石路堤地基和路堤沉變化規律,得到了預測沉變化規律的「龔帕斯」成長曲預測模型;根據工程實際,深入研究了邊穩定性的影響因素,得到了有益的結論。
分享友人