臺車吊車 的英文怎麼說

中文拼音 [táidiào]
臺車吊車 英文
pallet removal crane
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : hangsuspend
  1. They built a crane capable of lifting 150 tons.

    他們造了一起150噸重量的
  2. With the standardized workshop occupied 11600m2 and 630t hydraulic presses, 315t two axle punch presses, 250 sets of large, middle, small equipments, the company has the whole series production line. main equipments include cut - board machine, incurvate machine, opened incline pressure machine, drill attack machine, auto - moving hang machine, various kinds of moulding plastic machine, lathe, planer, drilling machine, horizontal axis rectangle platform flat grinder, universale lifting platform milling machine, eccentricity axis punching machine, liquid pressure derrick car, etc

    主要設備有: 630噸液壓機315噸雙軸沖壓機250噸沖壓機等大型沖壓機床,剪板機折彎機鉆攻兩用機自動走軌起機各式型號注塑機各式床刨床鉆床臥軸矩平面磨床萬能升降銑床偏心軸沖床液壓起重等大中小設備386多套,形成具有自動沖壓步進的生產線。
  3. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平的搭設、鉆機的水上轉移、承箱的起、鋼管樁的拔除等作業。
  4. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多重型噸位及bc跨( 1 ) ( 8 )軸線框排架各層豎向(設備)荷載后,對廠房結構,尤其鋼梁系統進行檢測鑒定與加固設計的實際工程,首先對廠房結構進行了現場調研、技術檢查、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢測、計算與分析結果,對廠房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  5. Other equipment : four 20 top ' s bridge cranes, two 10 ton ' s bridge cranes, six 5 top ' s bridge cranes, one 20 top ' s handjack, one 8 top ' s forklift, one wrap packaging machine, two steel coil reversal machines, two screw air compressor machine ( 5m3 )

    主要輔助設備配置: 20噸橋式4, 10噸橋式2, 5噸橋式6, 20噸平板1, 8噸叉1,纏繞包裝機1,鋼卷翻轉機2,螺桿式空壓機( 5立方) 2
  6. Cad system, cad turret punches, hydraulic shearing machines, hydraulic press brakes, desk punch presses, upright drilling machines, lathes, ac dc argon welding machines, electric welding machines, ceiling cranes, etc

    Cad系統, cad六角鍛壓機,油壓式剪床,油壓式折床,式沖床,直立式軸承床,支流交流氬弧,電動焊接機,懸掛式
  7. The truck crane ( gantry crane, tower crane, mobile slewing crane, bridge crane, crawler crane ) can lift a weight of 15 tons

    起重機(龍門、塔式、懸臂汽、橋式、履帶式起重機)能起15噸的重物。
  8. Furthermore, we own a section of special - used railway line of 0. 864km with an available length of 400m as well as 48 platform cargo spaces. additional, the company is equipped with 3 sets of forklifts, crane trucks, and shaoxian cranes each, 8 belt - conveyers of all specifications

    高溫保鮮冷庫四棟1250平方米設有一條0 . 864km的鐵路專用線,有效使用長度400m ,站貨位48個,叉少先各3,各種規格皮帶運輸機8
  9. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設施和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座起重機110噸門1850噸125噸112噸28噸4以及與其相配套的運輸噴塗精加工設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船工期為7 10天。
  10. The broker ' s hour is not only crowded, but the minutes and seconds are hanging to all the straps and packing both front and rear platforms

    證券經紀人不僅時辰擁擠,他的分分秒秒都是擠得滿滿當當的,像是前後站都擠滿乘客的廂里的拉手帶,每根都被拉得緊繃繃的。
  11. The logistics center covers an area of 100 acres and is provided with 20, 000m 2 steel - structure warehouse, 30, 000m 2 depot and 4 berthes of 1, 500 ton ; 6 pier cranes capable of lifting 8 tons, 3 full container lifts and 11 forklift trucks of different kinds

    物流中心佔地100畝,擁有20000平方米的輕鋼結構倉庫、 30000平方米的作業場地和1500噸級的內河碼頭泊位4個;配有8噸碼頭機6、集裝箱重3、各類叉11
  12. There is a idle workshop, the area is 913 square metres. there is a gantry crane of lifting weight 5 tons. producting and processing will be in the workshop

    市場院內有閑置廠房一座,建築面積913平方米,廠房內裝備起重量5砘的天1,可作為生產、加工間聯合開發辦廠等。
  13. If the units are too large for one crane they are sometimes lifted by two cranes working together.

    如果構件太大以至於一難于起,有時可用兩同時起
  14. 27 patents related to chain blocks, cranes, railroad maintenance equipment, etc

    鏈動滑輪,,鐵路養路器械等27
  15. It was first developed in the 1960s and has since been expanded to become the largest scenic area in guangzhou. other attractions can be seen by taking the cable car up to mingchun valley, hiring a car or walking

    由六十年代開始建設,至今已擴展為廣州最具規模的風景區,新舊勝景分佈各處,從山麓南部雲花園側的白雲索道,可乘至嗚春谷,亦可自雇汽或漫布各處風景區。
  16. Have bore stage car, grab, fork - lift truck, self - propelled to bridge machine, booth shop machine, roller, bulldozer, land leveler, tong carries car of stage of build by laying bricks or stones of line of pump, hydraulic pressure, crane, complete station the construction such as appearance, ride meter, dynamo and detect professional equipment 850 ( set ), technology of average per capita equips twenty - five thousand eight hundred yuan

    擁有鉆孔、挖掘機、裝載機、自行式架橋機、攤鋪機、壓路機、推土機、平地機、砼輸送泵、液壓襯砌、全站儀、測震儀、發電機等施工及檢測專業設備850(套) ,人均技術裝備2 . 58萬元。
  17. The company occupies the whole floor space 67, 033m, and 43, 751m areas of structure, in which production area is 31, 971m. the assembly shop is equipped with 2 sets of 100t cranes and an exclusive railway, and brings in the crosscut wires from germany georg company in type tba me - 800x5, 000and 250kw vapor phase kiln drier from abb norway ni company

    公司總佔地面積67033平方米,建築面積43751平方米,其中生產面積31971平方米。裝配間內裝有100t2和鐵路專用線一條,引進了德國georg公司的tba me - 800x5000型橫剪線及abb挪威ni公司的250kw汽相干燥爐。
  18. It provides a hoist for goods counters. which can hoist 42 tons

    三配備有貨櫃,可裝卸42t重
  19. Our company owns powerful technical design department which engages in the developing, consulting, producing and maintaining of the lift tables, balance crane, jib crane, etc. the products are all by cad and adopt new technology and new craft. they are in the leading place and have widely used in logistics, light textile, chemical industry, printing, harbor, station, etc

    公司擁有實力雄厚的技術設計部門,致力於升降平衡旋臂氣墊裝置等產品的開發咨詢生產與維修,產品全部由計算機輔助設計,採用新技術新工藝,產品已廣泛用於物流輕紡化工印刷港口站等。
  20. If the wall units are too large for one crane they are sometimes lifted by two cranes working together

    如果墻體構件太大,一不起來,有時就用兩合力起。
分享友人