船閘泄水 的英文怎麼說
中文拼音 [chuánzháxièshuǐ]
船閘泄水
英文
lock dumping-
Concrete construction temperature control for water discharge culvert of tgp ' s shiplock in summer season
三峽船閘泄水箱涵夏季混凝土施工溫度控制The pattern of flow of lower lock approach is usually complicated due to the influences of the interaction of flow underpoured from different locks. generally, physical model is applied to study the current field for the case of irregular boundaries and complex flow pattern
由於受多線船閘下泄水流相互作用的影響,船閘下游引航道非恆定流流態十分復雜,對於此類有復雜流態的非恆定水流運動問題一般採用物理模型進行研究。Based on the results of hydraulic model experiment on the second ship lock of tianjin port, this paper analyzes the factors influencing the mooring force in the process of water filling and emptying in ship lock chamber
摘要根據天津港復線船閘水力學模型試驗結果,分析船閘輸水系統在灌泄水過程中影響系纜力的因素。In the whole course of flood regulation of tgp during flood season as well as filling and discharging of its shiplock, unsteady flow at different levels will occur in the upper and the lower access channels, which will exert an adverse impact on the navigation
摘要三峽水利樞紐在汛期調洪和船閘充、泄水運行全過程,在上、下游引航道內將產生不同程度的非恆定流,對航運構成相應的不利影響。Based on the river regime of tgp dam area and the arrangement of upper and lower access channels, the experimental research on the influence of such unsteady flow on the navigation, the evaluation of navigable conditions under the unsteady flow and the study of corresponding improvement measures are presented in this paper
本文結合壩區河勢特點及上下游引航道布置,試驗研究了大壩泄洪及船閘充泄水非恆定流對上、下引航道通航影響,同時進行了非恆定流通航條件評價及改善措施研究。分享友人