  1. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  2. This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering

    本論文借鑒國內採用gis技術的大型電站的設計經驗,結合國家電力公司西北勘測設計研究院承擔的公伯峽、李家峽電站330kvgis設計,提出gis在選型論證、設備技術規范書編寫、布置設計、試驗、環保維護等方面的常見問題,並提供在工程應用中較常用的有效的解決措施。
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂電站工程設計的結構布置情況、地質參數及滲流計算成果,對閘室和擋水壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。
  6. This thesis discussed the design principia and desige method from the engineering point of view., and give out its own view about the selection of development of the hydropower station, layout of the underground cavern mass, selection of method for stability analysis on the surrounding rocks and support, and design of the rock anchorage crane beam. some conclusions assumed from the research and design of jiangkou power house is quite useful for all the underground hydropower station

    本文結合江口電站,從工程的角度對地下廠房的設計原則、設計重點進行了詳細論述,對電站開發方式的選擇,地下洞室群的布置特點,圍巖的穩定性分析及支護方式選擇以及巖錨吊車梁的設計方法進行了研究和論證。本文的觀點和結論對地下廠房工程設計有著一定的普遍意義。