荷縣 的英文怎麼說

中文拼音 [xiàn]
荷縣 英文
hot
  • : 荷名詞(蓮) lotus
  • : 縣名詞(姓氏) a surname
  1. Design and investment consultation on shenzhen airport - heao free way, jiangmen - gonghe free way, kaining - yangjiang free way of guangdong province, beijing - tongxian urban expressway, tianjing sugang highway improvement for dharmala group of indonesia, canadian investment ( china ) co. ltd waikee group of hongkong and so on

    與印尼大馬集團、加拿大中國投資有限公司、香港惠記集團等外方及港方對廣東省機(場)高速公路,江(門)共(和)高速公路,開(平)陽(江)高速公路,北京-通城市快速幹道,天津疏港公路改造,江西320國道(南昌西段)等項目,進行設計咨詢及投資造價咨詢。
  2. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬魚背山水庫岸邊溢洪道為例,計算了溢洪道上所受的水流載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。
  3. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  4. With the destination code analysis, it has been found that the 6975 bureau to the urban volume ( one way ) is 540erl, the 6977 bureau to the urban volume ( one way ) is 480erl, and the 6178 bureau nearly 200erl, plus the urban voice traffic volume of the incoming calls, the 6973 bureau and the 6970 bureau has tandemed the voice traffic volume nearly 1000erl. this has increased the auxiliary tandem office voice load, and at the same time, increased the demand for the trunking lines and has made pressure on the trunk module of the areas and counties

    經目的碼分析, 6975局到市內的話務量(單向)為540erl , 6977局到市內的話務量(單向)為480erl , 6178局到市內的話務量(單向)將近200erl ,再加上市內來話的話務量,使6973局和6970局為其他局轉接的話務量將近1000erl ,大大增加了輔助匯接局轉接的話務負,同時,端局到區、中心局,區、中心局到匯接局的中繼數量需求大,造成了區、中心局中繼模塊緊張的狀況。
  5. The power supply & transmit electricity system in guangyuan fulfilled the role of supplying main power to guangyuan city. while the harmonic occurred is very serious and it has not been restrainted. the main harmonic sources are two loads : aluminium electrolysed load and electrized locomotive load

    廣元電力網主要擔負著廣元市、工農業及人民日常生活用電任務,但其諧波極其嚴重,並且沒有進行治理,其主要諧波源負為電解鋁整流負和電氣機車牽引負
  6. Visit sino - dutch poverty alleviation project, huo shan county, anhui province - tea bamboo producers association and community funds, july 1, 2003

    參觀安徽霍山扶貧項目點-竹農和茶農協會社區基金會,
  7. The sfagm project manager dr. brian bedard and his assistant hu song visited the chinese netherlands poverty alleviation project based in huoshan county, anhui province. accompanied by the dutch co - director tim zachernuk and chinese co - director han yong, the mission toured the sites in tao yuanhe township for various farmer organizations bamboo producers association, shoe making association, community funds, and organic tea growers association. experience learned through the cnpa related to farmer organizations, farmer field school, participatory appraisal, small enterprises management and poverty alleviation approaches may have application in future sfagm project activities and provide a basis for future cooperation

    小農戶適應全球市場發展項目加方主任畢大德博士及其助理胡松先生訪問了在安徽省霍山實施的中國-蘭扶貧項目,蘭項目主任tim zachernuk和中方項目主任韓勇先生陪同參觀了霍山桃源河鄉的項目示範基地,學習中扶貧項目在農民組織社區基金竹品加工協會有機茶生產協會和婦女製鞋協會農民田間學校農村小型企業經營管理培訓扶貧示範培訓等方面的成功經驗,雙方並探討了今後在這些領域的合作意向。
  8. By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together

    並結合區內電源點分佈和負預測結果,進行了各三個五年計劃期間的電力電量平衡。得到了相應的結論。基於對風能、光能和水能資源開發各自特點的分析,文中進一步對多能互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補抽水蓄能開發方式的合理性及可行性。
  9. The competitive ability of power enterprises weakened and their profits declined as well. the thesis aims at shoving such existing problem as difficult selling

    文章中主要解決魏地區電力銷售困難,供大於求,電網負率過低問題。
  10. The ministry said on monday that the 23 - month - old holstein cow in ibaraki prefecture, north of tokyo, had an " unusual " form of the brain - wasting ailment, formally known as bovine spongiform encephalopathy ( bse )

    政府部門說,這頭牛為蘭種奶牛,年齡為1歲11個月,在東京北部的茨城被發現患有一種不同尋常的腦虛損病,即通常所稱的牛海綿體病(瘋牛病) 。
  11. Vu is a vietnamese american director who was born in north hollywood and currently lives in orange county

    Victor vu是美籍越裔導演。他出生於加州的北里活地區現正在橙居住。
  12. " he said if he was going to go down, he was going to go down in larry bird ' s jersey, " oklahoma county district judge ray elliott said wednesday. " we accommodated his request and he was just as happy as he could be

    俄克拉地區法官雷埃利奧特19日表示: 「托爾比指出,如果要去坐牢,那麼他希望能按照拉里伯德的球衣號碼來決定自己的期限。
  13. Below are the contact information for most community centers and libraries in san jos and surrounding cities in santa clara county

    下列為位於聖他克拉內聖西及其周邊城?的大部份社區中心及圖書館的聯絡資料。
  14. Taking nanpu bridge ( fst bridge ) in chun - an county as an instance, many problems on construction control technique for cfst bridge are discussed in this paper, including : the analysis method of simulating construction phase, construction monitoring technology, calculation of stayed - buckle - cable forces, allotting deadweight of pumping liquid concrete, analysis on the inflection of shrinkage and creep of core concrete in steel tube, analysis on the error in construction control, sensitivity analysis of parameters and parameter identification

    本文以淳安南浦大橋為背景,對鋼管混凝土拱橋施工控制中的結構分析方法、施工監測技術、斜拉扣索索力計算、泵注混凝土自重載的分配、鋼管核心混凝土收縮徐變分析、施工控制誤差分析、參數敏感性分析及參數估計等問題展開研究。
分享友人