蒸汽養護的 的英文怎麼說

中文拼音 [zhēngyǎngde]
蒸汽養護的 英文
steam-cured
  • : Ⅰ動詞1. (蒸發) evaporate2. (利用水蒸氣的熱力使食物熟或熱) steam Ⅱ名詞[中醫] (將藥物隔水蒸熟) steaming
  • : 名詞1. (由液體或某些固體變成的氣體) vapour2. (水蒸氣) steam
  • : Ⅰ動詞1 (供養) support; provide for 2 (飼養; 培植) raise; keep; grow 3 (生育) give birth to ...
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : 4次方是 The fourth power of 2 is direction
  • 蒸汽 : vapour; reek; breath; steam蒸汽採暖 steam heating; 蒸汽錘 [機械工程] steam hammer; 蒸汽打樁鍾 ste...
  1. The 5 batches with 31 groups of specimens were carried out four different curing systems including standard curing, hot water curing, dry heat curing and steam curing, and the regularity of rpc200 ' s strength with different curing conditions was studied. a conclusion was acquired by the experiment that the rpc200 ' s strength develops steadily in the steam curing which is mature and the economic benefits is more notable

    製作四批23組試件,進行了標準、熱水、高溫乾熱等四種不同制度對比試驗,通過試驗研究發現採用蒸汽養護的rpc200後期強度發展穩定,並且技術成熟,設備無需改造就可用於rpc200構件,具有顯著經濟效益。
  2. Vo5 nourishing oasis is activated by the steamy heat of your shower with fragrances that bloom, to invigorate your senses while conditioners restore your hair with nutrients

    Vo5滋綠洲由你洗澡激活,帶來大量香氣。在發劑恢復你頭發同時,增強你感覺。
  3. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保層工程等施工環節組成。文中介紹採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量施工技術;採用重物移運器有效移梁施工方法;壓漿、封端、橋面防水層和保層施工一些規定和注意事項等都是對箱梁製造行之有效施工技術和施工方法,並可為以後類似施工作借鑒。
分享友人