蓄水壩 的英文怎麼說

中文拼音 [shuǐ]
蓄水壩 英文
impounded dam
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水壩 : dam; pen
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,型為305米高雙曲拱,正常位標高1880米。址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此基的防滲成為重要問題。
  2. Variation of copepod from maoping to guizhou in the three gorges reservoir before and after impoundment

    三峽前段前後橈足類種類組成的變化
  3. Money has poured in for the construction of the three gorges dam, downriver in neighbouring hubei province, and the relocation of hundreds of thousands of people displaced by the reservoir that stretches up to chongqing city itself

    在相鄰的下游省份湖北,大量資金湧入,用於建設三峽大,以及用於安置因而不得不搬遷的局面。
  4. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲拱進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常位、設計洪位等3種工況下加固前後肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  5. The aswan dam, for example, stopped the nile flooding but deprived egypt of the fertile silt that floods left ? all in return for a giant reservoir of disease which is now so full of silt that it barely generates electricity

    比方說,阿斯旺大雖然阻擋了尼羅河的洪但是也奪走了洪后本能留給埃及的肥沃土壤,而留下來的是一個現在根本不能發電而充滿疾病的巨大的池。
  6. The main content of this article includes : " ( l ) the planar non - linear and viscid - elastic static mechanical analysis is used to analyze and calculate the md in service. ( 2 ) the planar nonlinear static mechanical analysis of the stress and deformation is used to analyze the med in banking, which is banked to the height of 140m

    主要研究工作有: ( 1 )茅坪溪防護大完建和時的應力和變形的分析計算:對完建和體的應力和變形進行平面非線性靜力分析計算和平面粘彈性靜力分析計算,對分析計算結果作出結論。
  7. In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered

    計算中考慮了混凝土的絕熱溫升、彈性模量、徐變度和自生體積變形隨齡期的變化以及分層澆築、夏季停工、外界氣溫變化、表面保溫、通冷卻及分期等因素對體溫度應力場的影響。
  8. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,化熱溫升,邊界保溫,過程,澆築間歇以及灑養生等因素;應力場的計算考慮了混凝土的自重,靜壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  9. 8. the influence of cross - joint and process of constructing and storing water by stages on dam structure were studied with the consider of ertan arch dam and some valuable results were obtained

    結合二灘拱,研究了體橫縫和分期施工分期過程對拱結構工作性態的影響,取得的有參考價值的成果。
  10. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面板、分期布埡高面板堆石,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施工程序減小面板應力變形具有重要意義。
  11. Controlled by summersville dam, the gauley is filled when the sum - mersville reservoir is lowered for storing winter melt and spring rains providing about 20 days of whitewater rafting

    受夏日控制,當池為了儲存融雪和春雨而放時,高利河裡量滿載,提供了20天左右的白漂流。
  12. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂電站位於四川省阿藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引式開發。正常位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂電站閘建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  13. Water environmental properties at the near dam region of the three gorges reservoir in the initial impoundment period

    三峽初期庫近環境特性分析
  14. Three aspects are studied : ? he temperature field and stress field of penstock during construction period ; ? the initial temperature and stress status of penstock before subjected to internal water pressure ; ( 3 ) the optimization of the penstock construction ; 3

    同時給出了後背管前初始應力狀況,提出了優化施工計劃的原則和方法。對以後後背管混凝土的施工具有實際指導意義; 3
  15. The change of adiabatic temperature rise along with age and the effect on temperature field of dam body made by pouring lift by lift, work suspension in summer and water storage are considered in the analysis

    分析中考慮了混凝土的絕熱溫升隨齡期的變化和分層澆築、夏季停工及體溫度場的影響。
  16. Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment

    摘要從吉林省資源特點分析入手,提出了雨資源的有效集利用是補充流域資源總量不足的重要因素,探討了在吉林省雨資源主要利用途徑是首先在小流域規劃中作好雨資源利用規劃;其次是建設以土保持治溝骨幹工程為主的溝道系,強化坡面集雨工程和林草植被建設,增大貯空間;第三是充分利用田間工程和利工程集雨,使降雨就地就近被攔,最終使環境得以修復。
  17. Terraces on slope land delete the conditions of causing soil and water loss. ponds, cistens, water cellars enhance surface water use efficiency, warping dams can store flood, decrease flood peak, retain sediment, and conserve water

    坡地修梯田消除了產生土流失的條件,池、旱井、窯提高了對地表資源的利用率,淤地具有、削洪峰、攔泥沙、涵養源的作用。
  18. The waterproof of the storage, underground grage, bridge, tnnel and subway

    池、地下車庫、橋梁、隧道、地鐵、污池室外游泳池、堤等防
  19. Water engineering ; terms ; dam plants

    利工程術語.蓄水壩
  20. Since dams can ‘ t be filled until the risk of flooding is past, the models predict they will trap just 70 to 85 per cent as much run - off as they do now

    由於蓄水壩只有在洪泛濫的危險過去后才能滿,模擬研究預計它們攔阻量的能力只是目前平的70至85 。
分享友人