蓄水期 的英文怎麼說

中文拼音 [shuǐ]
蓄水期 英文
impoundment stage
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • 蓄水 : [水文] retain water; store water; [土] impound蓄水池 pool; reservoir; source; cistern; lasher; pi...
  1. The development in the credit inflation equiponderant organs on savers, entrepreneurs and central bank surpluses the good contion on economy system for dealing with the dilemma of credit inflation in china and helped our courtry gain the fastest economic development rates in the world more than 20 years

    在有計劃商品經濟體制改革時,重建適應市場經濟要求的信用擴張制衡機制最重要成果是通過直接強制儲機制解體,促使有計劃商品經濟體制形成消費者調整意願儲平,這一適應市場經濟要求的最重要的信用擴張制衡機制。
  2. In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered

    計算中考慮了混凝土的絕熱溫升、彈性模量、徐變度和自生體積變形隨齡的變化以及分層澆築、夏季停工、外界氣溫變化、表面保溫、通冷卻及分等因素對壩體溫度應力場的影響。
  3. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,化熱溫升,邊界保溫,過程,澆築間歇以及灑養生等因素;應力場的計算考慮了混凝土的自重,靜壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡的變化以及徐變的作用。
  4. This article deals with the analysis carried out in association with measured creep process before and after initial dam impoundment when landslide occurs, which suggests that the landslide undergoes both acceleration and deceleration procedures as the water level increases and ends up with retarded creep state after the water level is in stabilized status

    本課題對滑坡初前後實測蠕滑過程進行了分析,證明滑坡在位上升過程中經歷了加速和減速過程,位穩定后進入減速蠕變狀態。
  5. 8. the influence of cross - joint and process of constructing and storing water by stages on dam structure were studied with the consider of ertan arch dam and some valuable results were obtained

    結合二灘拱壩,研究了壩體橫縫和分施工分過程對拱壩結構工作性態的影響,取得的有參考價值的成果。
  6. Taking into account weather and flood forecast information ; the forecast operation manner is studied under the condition of without the change of the existing flood control standard to realize the conversion of flood control and benefits. ( 4 ) through analyzing runoff and water utilization information during reservoir operation, design flood, and the existin

    庫汛陽位動態控制方法研究及其風險分析根據庫流域天氣預報、流域前降雨、庫泄能力和防洪興利要求,利用庫汛限位變動范圍,結合洪預報和短降雨預報模型,研究庫汛限位動態控制方法。
  7. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分澆築面板、分布埡高面板堆石壩,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施工程序減小面板應力變形具有重要意義。
  8. On the loss compensation for fish farmers in the early impoundment stage of the three gorges reservoir

    三峽庫區漁民損失補償的探討
  9. Water environmental properties at the near dam region of the three gorges reservoir in the initial impoundment period

    三峽庫近壩區環境特性分析
  10. The change of adiabatic temperature rise along with age and the effect on temperature field of dam body made by pouring lift by lift, work suspension in summer and water storage are considered in the analysis

    分析中考慮了混凝土的絕熱溫升隨齡的變化和分層澆築、夏季停工及對壩體溫度場的影響。
  11. Analysis of the surrounding dam dry - laid stone slope revetment damage of a yellow river diversion reservoir at early period of water storing

    引黃平原圍壩干砌石護坡破壞調查與原因分析
  12. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊江裁彎后,三口(松滋口、太平口、藕池口)分流分沙減少,下荊江徑流量和輸沙量相應增加,洞庭湖泥沙淤積減少; 80年代中以後,長江中游幹流及洞庭湖出口的年輸沙量呈減少趨勢,城陵磯至武漢河段河床由淤積轉為趨向沖淤平衡;三峽工程初運用后,長江中游含沙量沿程恢復距離較長,但床沙質部分恢復距離相對較短。
  13. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  14. Response of middle and lower reaches of yangtze river to the initial operation stage of the three gorges project

    三峽運用初長江中下遊河道沖淤響應
  15. The dam protected height is determined as 15m higher above reservoir water level during initial reservoir impounding period in order to preventing surge damage caused by landslide

    李家峽電站壩前號滑坡屬有蠕滑活動的老滑坡,體積為1845 104m ~ ,為預防滑坡涌浪危害,初蓄水期間壩前設防高度15m 。
  16. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工蓄水期等各個階段可能產生的破壞進行了認真研究。
  17. Base on data, distortion character of lianhua faced rock - fill dam body has been reappeared by non - linear denken e - b model fem analysis ; at the same time, parameters in calculation accordant with model are adopted either in construction stage or in storage period

    本文根據資料所進行的非線性鄧肯e - b模型有限元分析,計算分析了蓮花面板堆石壩壩體的變形性狀;同時在計算中,無論施工蓄水期,都採用與模型配套的統一的參數。
  18. Abstract : this paper gives an account of the service behavior of dam safety monitoring system of tianshengqiao hydorpower station during construction period, impounding period and operation period, with comparing the deformation conditions of the dam before and after impounding and the behavior of the dam since its operation

    文摘:通過大壩安全監測,天生橋一級電站大壩安全監測系統在施工蓄水期及運行的工作性態,比較前後大壩各項監測內容的變形情況以及大壩運行到目前的工況。
  19. To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water. in this article, the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed. including the rock - fill dam, the stress and deformation distribution of cut - off wall, the deformation of sloping core, the incresment and subduction of pore water pressure and the effective stress situation calculation

    為確保大壩安全,並為大壩施工蓄水期運行決策提供必要的技術支持,本論文根據上壩土料的應力一應變一強度特性、滲透和固結等特性,對壩體進行了彈塑性應力變形計算和固結分析,包括大壩堆石體、防滲墻的應力及變形分佈和斜心墻的變形、孔隙壓力增長及消散和有效應力狀態計算等。
  20. When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred

    在通航或者竹木流放的河流上修建永久性攔河閘壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。
分享友人