蓄水管 的英文怎麼說

中文拼音 [shuǐguǎn]
蓄水管 英文
well
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. 2. the structure of purple soil is meliorated by sabaigrass. when contrast to bare land treatment and natural wild grassland treatment we knew that sabaigrass treatment and grass tree solid plating treatment reduced soil bulk density, enhanced soil capillary porosity, non - capillary porosity and porosity ratio, decreased soil sand grain content, enhanced soil clay grain and silt grain content so as to reduced the dispersal degree of soil, improved the aggregate capacity of soil, increased the amount of soil aggregate structure, meliorated the water permeability of soil, accelerated the form of good soil structure

    龍須草能改善紫色土的土壤結構龍須草純種植被和林草立體種植植被能不同程度地降低土壤容重,減少土壤砂粒含量,增加土壤的毛孔隙度、非毛孔隙度和孔隙比,以及增加粉粒含量,從而降低土壤分散度,提高土壤團聚性,增加土壤團粒結構數量,改善土壤的透性,促進良好土壤結構的形成,最終提高土壤的保肥性能,增強土壤的抗蝕性和抗沖性。
  2. Finally, the expert system is used in ming wang ta village, lin county, shanxi province to design and project for apple ' s drop irrigation at the demonstration farm. by the aid of the system, the calculation result, the design result, the drawing of pipe framework, the budget sheet are conveniently gained, and efficiency is distinctly enhanced. the result of this design has been successfully carried out in the test areas

    最後應用本系統對山西省臨縣城莊鄉明旺塔村丘陵山區截流灌溉工程試驗示範節灌溉試驗示範區的果樹滴灌灌區進行規劃設計,方便快捷地獲得了該滴灌系統比較合理計算結果、規劃和系結構圖、概算表等,明顯提高了設計的效率,設計過程具有較高的參考性與實用性。
  3. Recent years, with the full - blown development of the prestressed concrete technique, the prestressed technique with ring - like strands as the professional technique adapted to the penstock, has been applied to many civil engineering fields such as tunnels and surge shafts in civil engineering hydraulics and power engineering, containment shells of nuclear power station, industrial storage bunkers, digesters and conservation pools in municipal engineering

    近年來,隨著預應力混凝土技術的成熟化發展,環形預應力作為適應壓力道結構形式的專業技術,廣泛應用於電工程隧洞和調壓井、核電站安全殼、工業儲料倉、市政工程消化池和池等諸多領域。目前,預應力混凝土壓力道已得到了越來越多的重視和研究。
  4. Three aspects are studied : ? he temperature field and stress field of penstock during construction period ; ? the initial temperature and stress status of penstock before subjected to internal water pressure ; ( 3 ) the optimization of the penstock construction ; 3

    同時給出了壩後背前初始應力狀況,提出了優化施工計劃的原則和方法。對以後壩後背混凝土的施工具有實際指導意義; 3
  5. Again it was largely due to certain characteristics of wetland rice ( impounding and / or control of water ) that this crop turned out to be so immensely suitable to intensification

    由於稻自身的一些特點(與防澇相結合) ,這種作物易於進行集約化理。
  6. This included firstly the construction of a new reception tank and a pumping station at muk wu to strengthen the raw water reception capability. secondly, additional water mains were laid to strengthen the transfer between river indus pumping station with plover cove reservoir

    17億元改善東江供計劃,第一部份在木湖興建一個新池及抽站,加強輸入廣東省原設備,第二部份是由梧桐河抽站至船灣淡湖興建輸,增加梧桐河抽站抽量。
  7. Navigation management at the river reach near gezhouba after water filling of the three - gorges reservoir

    三峽后的葛洲壩近壩河段通航
  8. On the other hand for four main vegetation typies, which are picea crassifolia, forests sabina przewalskii forests, bushes and pastureland, whose soil permeability function was analyzed from angle of its physics, capacity of water, storing water in it. the results show as follow : permeability function of soil is controlled by quality of soil hole. the quality and quantity of soil hole under picea crassifolia forests are the best, and the permeability also is the best

    另外,從土壤物理性質、量、貯量等角度對祁連山苔蘚雲杉林、祁連圓柏林、亞高山灌叢林、牧坡草地4種主要植被類型的土壤滲透功能進行分析,結果表明:土壤的滲透功能主要由土壤非毛孔隙度的質和量決定的,苔蘚雲杉林土壤非毛孔隙度的質和量最好,它的滲透也最好;雖然亞高山灌叢林的滲透功能次之,但由於它所處的位置和面積大,現實貯量在祁連山四種主要植被類型中最大。
  9. To preserve water quality in public water areas, large pipelines are being installed to carry wastewater during the initial stages of rainfall, while reservoir facilities are being constructed to store sewage that cannot be fully treated during times of heavy rain

    為了保全公共流域的質,正在加大往再生中心輸送降雨初期的特別臟的污道,構建設施來存儲那些在雨天沒能被處理的臟
  10. Construction of lagoons reservoirs in the reclamation area will block existing pumping station intake and outfall pipes

    -在填海區內興建瀉湖庫會阻礙現有抽站的進及排道。
  11. Lagoon or reservoir for cooling water - the lagoon reservoir option presents serious technical problems, such as size and arrangement of supply pipelines to ensure water is adequately replenished

    -瀉湖庫方案有重大的技術問題,例如輸的大小及安排,必須確保能提供足夠的用作補充之用。
  12. Guide to the acquisition and management of meteorological precipitation data - specification for raingauges - storage raingauges - storage raingauges

    氣象降數據的採集和理指南.雨量計規范.式雨量計
  13. Although the malinan water supply project was scheduled to be completed in a month s time, the people s concerted effort shortened the work time by about half. two water towers were built - one at the river s source to collect uncontaminated spring water flowing from between the rocks, and the other on level ground conveniently accessible to the people. the water towers were connected by pipes and the water was driven by electric pumps

    科塔巴托省馬里南村的供系統,預計一個月完成,結果由於人民的全力合作,不到二個星期已近尾聲了,他們在河流的源處做一個塔儲從巖壁流出來沒被污染的泉,然後再到平地方便大眾提的地方再做一個塔,利用發電機以及大來和源處的塔連接,就這樣供系統形成了。
  14. Double pressure measuring instruments contain two separate measuring systems that are independent of one another which in one instrument display, for example, the brake pipe pressure and the reservoir pressure

    應用於軌道機車和卡車的氣壓制動器設備上的壓力測量技術擁有雙值的壓力測量儀表,一個儀器中包含兩個獨立的測量系統。例如,制動壓力和池壓力。
  15. This thesis is main analysis three gorges project to the great significance of the yangtze river shipping with main influence, make use of the safe condition of magistracy of yangtze river trunk line to synthesize the valuation way, to yangtze river upper stream water top transportation safety proceed take the gauge of, reason of detailed analysis trouble, find out the safe weak link that ascend of management, actual circumstance after join teetering the three gorges water area the water, bring up to establish the three gorges water area the shipping safety management system ' s speculation, provide the upper grade to test, then slice solid enhance the water on the transportation safe manage, and insure the three gorges water area the water on the transportation the stability of the safe situation

    而近年來,長江上遊船舶航行秩序不穩定,事故多發,安全形勢不斷惡化,使三峽庫區形成后的航運安全理顯得尤為重要和突出。本文主要分析三峽工程對長江航運的重大意義和主要影響,運用長江干線轄區安全狀況綜合評估辦法,對長江上游上交通安全進行評估,詳細分析事故原因,找出安全理上的薄弱環節,結合三峽庫區后的實際情況,提出建立三峽庫區航運安全理體系的構想,供上級參考,以切實加強上交通安全理,確保三峽庫區上交通安全形勢的穩定。
  16. The gallbladder is attached to the common bile duct and acts as a storage reservoir

    膽囊連接著總膽起著池的作用。
  17. The research puts forward corresponding tactics about design, material, storage equipment, management on water quality pollution of second water supply system in jinan

    並對濟南市的二次供系統質污染問題從設計、材、裝置、理上提出相應的對策。
  18. After rain stops falling, the stored water is released into the sewage pipes and transferred to the water reclamation center

    雨停了之後,將被釋放到各個下,再次轉送到改造中心。
  19. Through redesigning of pipe system to alter its character and using the ways to isolate vibration and reduce vibration, it is yielded very good results of reducing the vibration and noise. in some points the acoustic pressure level drops very much, such as in the standard point of number one pump the acoustic pressure level drops 15db ( a ) and in the standard point of cistern also drops 15db ( a ), and in the highest point of the acoustic pressure before redesign drops from 105db ( a ) to 44db ( a ), and in the second floor the acoustic pressure level have reached the requirment

    通過對道結構的改造,減振和隔振措施的有效使用,使供系統的振動和噪聲得到了有效的控制:使一號泵前的標準點和池前標準點的噪聲聲壓級都降低了15db ( a ) ,道上測點的振動量降低了90 ;二樓居民門外的噪聲從55db ( a )降到25db ( a ) ,遠低國家標準35db ( a ) ;在改造前噪聲最大點西側池的噪聲也由105db ( a )降到44db ( a ) 。
  20. It ' s pointed out that only water resources administration management department fulfills an organic entirelized management for the all water affairs, that include the flood proofing, waterlogging drainage, water storage, water supplying, water using, water saving, drainage, waste water procession and reusing, then water resources optimum disposition may be able to realize and water resources supply may be able to guarantee the social economy development possibly continuous

    提出必須由行政主部門代表國家對城市和農村的防洪、排澇、、供、用、節、排、污處理及回用等涉事務實行一體化行政理,才能從根本上實現資源的優化配置,為社會與經濟可持續發展提供資源保障。
分享友人