蓄水構造 的英文怎麼說

中文拼音 [shuǐgòuzào]
蓄水構造 英文
reservoir structure
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 蓄水 : [水文] retain water; store water; [土] impound蓄水池 pool; reservoir; source; cistern; lasher; pi...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The water reservoir of slaughterhouse shall be an enclosed structure situated at least 3 meters away from waste area or septic tank

    屠宰場之池應為密閉性物,其設置地點應距污穢場所、化糞池三公尺以上。
  3. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽庫泥沙淤積入手,分析庫泥沙淤積特性和庫區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調庫容、成同級流量下位抬升庫回上延、對沿岸及過河建築成影響、因位抬升致使庫區周邊灌區地下不暢乃至倒灌而成土地鹽堿化、對庫庫區大量淤積灘地無序圍墾成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是位抬升的重要原因。
  4. At last, the paper interprets the geological background of the forming of landslides, and reveals the landform, stratum, lithology and geologic structure based on the etm + image. and also, the paper interprets the location and distribution of the specific disaster bodies based on the quickbird image. through the analysis of the extracted information, the paper considers : the geologic structure of fengjie county is complex, and lithology is crashed ; the terrane in the canyon segment is fairly stable ; the terrane in some segments of the southern bank will be less stable after the water is stored, because the rock is in the same direction and is apt to slip with human project

    最後在etm +圖像上對滑坡發育的地質背景進行解譯,提取了地形、地層巖性、地質等信息,在quickbird影像上詳細地圈定了滑坡災害體的實體位置及發育范圍,通過對所提取信息進行分析,本文認為,奉節縣地質復雜,巖性破碎;峽谷段巖層穩定性較好;南岸部分地段為順向巖層分佈區,人類工程活動容易誘發順層滑坡,后庫岸整體穩定性下降。
  5. Through redesigning of pipe system to alter its character and using the ways to isolate vibration and reduce vibration, it is yielded very good results of reducing the vibration and noise. in some points the acoustic pressure level drops very much, such as in the standard point of number one pump the acoustic pressure level drops 15db ( a ) and in the standard point of cistern also drops 15db ( a ), and in the highest point of the acoustic pressure before redesign drops from 105db ( a ) to 44db ( a ), and in the second floor the acoustic pressure level have reached the requirment

    通過對管道結的改,減振和隔振措施的有效使用,使供系統的振動和噪聲得到了有效的控制:使一號泵前的標準點和池前標準點的噪聲聲壓級都降低了15db ( a ) ,管道上測點的振動量降低了90 ;二樓居民門外的噪聲從55db ( a )降到25db ( a ) ,遠低國家標準35db ( a ) ;在改前噪聲最大點西側池的噪聲也由105db ( a )降到44db ( a ) 。
分享友人