蓄水方案 的英文怎麼說

中文拼音 [shuǐfāngàn]
蓄水方案 英文
impounding schemes
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 蓄水 : [水文] retain water; store water; [土] impound蓄水池 pool; reservoir; source; cistern; lasher; pi...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長江大洪后開始實施的「平垸行洪,退田還湖」的土地利用調整,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長江中游地區應積極推進農業現代化,提高農業勞動生產率,轉移,減少分洪區的人口,移民建鎮,對區內的土地要促進其規模經營,由優秀的有文化的農民經營,平時只有少量的直接從事農業生產的經營管理人員,農忙時則大量地使用季節性合同工或實現機械化,大洪時退田還湖,減輕長江幹流大洪的壓力,減少分洪與特大洪災時的損失,這樣還可促進避洪、冬季農業等的發展,也有利於長江中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  2. In this paper, the design philosophy and configuration of the power generation / motor - transformer group relay protection, as well as the design characteristics of the protection system for the pumped storaged units in huilong power station

    文章介紹了回龍電站發電電動機變壓器組繼電保護的設計原則、配置及抽能機組保護的設計特點。
  3. Based on the above studies. the different programs on how to use the rainwater resources efficiently is developed. which is decided by the water deficiency amount for agricultural production. a series of measures have been put forword. first, different geological regio should take different methods. second. the rainwater utilization through collection and storage projects or through reduction in evaportranspiration and increasion in infiltration should be combinated organically. third, the high efficiency of rainwater ' s utilization should be attained. therefore, water resources crisis can be alleivated efficiently and the agriculture sustainable development can be improved in baoding area

    通過對典型年實測資料的分析,較深入研究了不同作物對雨資源的利用效率及其影響因素。本文提出了根據缺量等級決定的雨資源利用的技術思路,因地制宜的提出了平原區以覆蓋抑制蒸發利用和雨富集疊加利用為主的雨資源高效利用措施,保定山區以就地攔入滲利用利雨富集疊加利用為主的雨資源高效利用措施。
  4. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河抽能電站二期工程泥沙調度,對多個庫淤積損失、過機沙量、取口附近的泥沙淤積和流流態,進行了庫沖淤研究。
  5. At the same time, according to the geological condition of a project in gaize county and its power demand, 9 different proposals were worked out for calculation and analysis, therefore a development proposal of pumped storage with wind and light as supplements was finalized as the best through selection and comparison

    以改則縣某工程為實例,針對其自然地理條件及對電能的需求,應用風、光、互補系統分析模型,擬定了9個不同進行計算分析,經比選,提出了該工程風、光互補抽能電站的最優開發
  6. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘電站工程規模論證,簡述該工程正常位選擇和裝機容量選擇設計階段技術經濟比較的主要成果、取捨的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘電站工程規模設計論證總結類似工程規模論證時的主要技術要點。
  7. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計平鋪層防滲、粘土心墻防滲及瀝青心墻防滲的靜態應力位移及壩體在竣工期、期等各個階段可能產生的破壞進行了認真研究。
  8. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地利樞紐工程深厚覆蓋層基礎防滲設計的選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲、瀝青混凝土心墻和壩基垂直防滲以及粘土斜心墻和壩基平鋪蓋防滲,分別按竣工期和運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同的計算分析和研究,比較全面的了解了各壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  9. Study on reservoir regulation at first filling at zipingpu water conservancy project

    紫坪鋪利樞紐工程初期調度研究
  10. Technique and economy comparison of main connection in huanggou pumped - storage power station

    荒溝抽能電站電氣主接線技術經濟比較
  11. Impact of new operation regulation of three gorges reservoir on navigation of chongqing reach

    三峽庫新蓄水方案對重慶河段航道的影響
  12. Abstract : it was introduced in the paper on the basis of the famous tide model of s21hd, the sediment calulation for the design proposal of the reservoir of dandong power plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted

    文摘:簡要介紹以著名的潮流模型s21hd為基礎,用新建的依賴于原觀資料的全沙沖淤概化模型,對丹東電廠庫設計進行的回淤計算;引述了相應的波浪模型試驗結論和浪、流聯合作用淤積預報結果。
  13. Lagoon or reservoir for cooling water - the lagoon reservoir option presents serious technical problems, such as size and arrangement of supply pipelines to ensure water is adequately replenished

    -瀉湖有重大的技術問題,例如輸管的大小及安排,必須確保能提供足夠的用作補充之用。
  14. In chapter one developments of pumped storage power station in the world are investigated, and harmonics suppression method for sfc is surveyed. working principles of sfc used in pumped storage power station are introduced. in chapter two, harmonic standard is presented

    本文第一章闡述了抽能電站和sfc裝置的工作原理及國內外已經建成或在建的大型抽能電站工程;討論了sfc裝置諧波問題及其危害;並介紹了五種諧波抑制
  15. Abstract : on the basis of the interpretation of landsat tm pictures, incorporated with the referencing of the predecessors ' literatures and field investigation data, and also by means of computer technique and optical image processing, this paper makes an analysis of water resource in lunan area, more over, the author makes some important plans to developping and utilizing water resource in lunan area

    文摘:以量平衡理論為依據,採用不同時相的tm圖像數據及多元信息復合技術對魯南地區沂源、沂、沂南三縣(簡稱「三沂」 )的地下資源、地表條件進行調查分析,在此基礎上,提出了區域資源綜合開發利用配置
  16. The simultaneous outflow from dam of trunk and branch streams is studied also for wide rang floods. by the new computational procedure, the optimum scheme of outflow from dam will be determined to decrease the influence of flood

    通過干支流大壩泄洪的演算,可確定大壩泄洪的優化,並減小對下游的影響,起到庫最優調的作用。
  17. Evaluation of scheme economic evaluation for main wiring in pushihe pumped - storage power station

    蒲石河抽能電站主接線設計經濟性評定
  18. Study on inclined penstock excavating technology in huizhou pumped storage power station project

    惠州抽能電站高壓斜井開挖選擇
  19. By adopting the three - dimensional nonlinear finite element program, using drucker e - b model, demonstrating the actual construction progress and water impounding of gongboxia hpp main dam, comparing the two schemes of the existence and nonexistence of extruded concrete curb, made three - dimension simulation calculation, the result proved that while the existence of extruded concrete curb between face slab and rockfill, the deformation and stress of face slab are better than that while the nonexistence of extruded concrete curb

    採用三維非線性有限元計算程序,使用鄧肯e b模型,模擬公伯峽面板壩的實際施工進度、過程,對比有無擠壓邊墻兩種,進行三維模擬計算。結果表明,面板與堆石體之間有擠壓邊墻時,其面板的變形及應力值均小於無擠壓邊墻的相應結果。
  20. It is a problem that to what extent the seismogenic environment will be affected by reservoir impounding and whether the delimiting scheme of potential focus and the seismic risk analysis should be adjusted

    摘要三峽對庫首區孕震環境影響有多大,是否需要對潛在震源的劃分及現行地震危險性分析法做出調整、改進,是一個亟待解決的問題。
分享友人