蓋面混凝土 的英文怎麼說

中文拼音 [miànhúnníng]
蓋面混凝土 英文
blinding concrete
  • : 蓋名詞(姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 蓋面 : capping
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. The thermal crack problem of the mass concrete is very complicated, and correlative with structure, building material, construction, rock, circumstance, and so on. now, in the construction field, the research on the mass concrete used during hydraulic construction is more frequent than the others, white the research on the comparatively small mass concrete used in the normal buildings is not deep enough and comprehensive, the covering area in the related codes are limited and narrow. many problems in construction practice have to be solved by the experience, rather than by theory. this phenomenon leads to much unnecessary waste of labor, material and financial resources, also the quality is unsatisfactory

    建設領域目前對水工建築中所使用的大體積(巨型結構)研究較多,而對普通建築中所使用的體積相對要小很多的大體積(相當于中體積)的研究卻還不夠深入、全,相關的規范條文覆還不夠完善,對很多工程實踐中的問題只能依靠經驗處理,缺乏適當的理論依據,這使得在工程實踐中造成許多不必要的人力、物力、財力的浪費,大體積施工質量控制的結果也不很理想。
  2. If the surface is covered or watered after casting of concrete, the influence resulted from change of environmental temperature and relative humidity on concrete will decrease to some extent. then the shrinkage stress will also decrease and the probability of cracking will be reduced as well

    澆注完后對表進行覆或澆水養護,可以很大程度上地減少外界溫濕度變化對內部的影響,減小了的收縮應力,從而降低開裂的可能性。
  3. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆層上國內首座百米級的板堆石壩。
  4. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗橋設計使用壽命100年的要求,確定出高耐久性的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對橋梁的墩柱、梁、預制箱梁和橋板用高耐久性的配合比進行設計,並對其施工應用技術進行了研究。
  5. Cover water conservation use, average temperatures above + 5 c using natural conditions, the use of appropriate materials on the concrete surface to be covered and watered, in the concrete cement hydration within a certain period of time required to maintain the proper temperature and humidity conditions

    採用覆澆水養護,利用平均氣溫高於5的自然條件,用適當的材料對加以覆並澆水,使在一定的時間內保持水泥水化作用所需要的適當溫度和濕度條件
  6. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定的參數,利用非線性e - b模型,結合黃河小浪底石壩設計剖,採用thepd石壩總應力程序,對深覆層塑性防滲墻的應力、位移進行有限元分析,並與普通防滲墻計算結果加以對比,同時分析了不同配比塑性特性的影響,並採用應力水平和拉應力數值來判斷塑性防滲墻的安全程度。
  7. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆層基礎防滲設計、壩基防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘心墻和壩基垂直防滲方案、瀝青心墻和壩基垂直防滲方案以及粘斜心墻和壩基水平鋪防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  8. Standard test method for determining relative humidity on the surface of concrete floor slabs using relative humidity probe measurement and insulated hood

    用相對濕度探針測量法和絕緣測定地板表相對濕度的標準試驗方法
  9. The stress - deformation behavior of diaphragm walls of concrete face rockfill dam built on thick alluvium deposit was analyzed using the numerical analysis method

    摘要採用數值分析方法對深覆層上板堆石壩的防滲墻應力變形性狀進行了研究。
  10. The influence of accessorial electrode and electrode distance on the electrodeposition effect was investigated, and three parameters, that is, rate of mass gain, rate of surface coating and rate of crack closure were measured

    摘要就電沉積方法修復裂縫中輔助電極、電極距離對沉積效果的影響進行了試驗研究,測定了沉積過程中試件質量增加率、表率及裂縫愈合率。
  11. As a sub - topic of national natural science foundation named " cracking mechanism and a whole set of control technique of modern concrete structure " ( no : 50278031 ), this paper roundly study crack controlling technique of cast - in - place slab with large - area

    本文作為國家自然科學基金「現代結構裂縫機理及成套控制技術」 (編號: 50278031 )的子題,全系統地研究了大積現澆樓結構裂縫控制技術。
  12. Installation of steel structures and cladding. fabricate and install docking, front wall steel structure. precast concrete and stressing work

    安裝鋼結構及板、平臺和前墻結構建造安裝,預製件及張拉工程。
  13. Standard test method for evaluating asphalt - covered concrete bridge decks using ground penetrating radar

    使用地穿透雷達評價瀝青覆船橋甲板的標準試驗方法
  14. The influences of the properties of alluvium deposit, the properties of diaphragm wall concrete, the construction sequence of diaphragm walls, the distance between diaphragm walls and dam toe and the shape of diaphragm walls on the stress - deformation behaviors of diaphragm walls of concrete face rockfill dams were studied

    研究了覆層特性、防滲墻特性、防滲墻施工順序、防滲墻與壩趾之間距離和防滲墻形狀對于板堆石壩防滲墻應力變形性狀的影響。
  15. In this paper, based on a typical plan arrangement of two - user - on - one - storey and leap storey type multi - story house, the mechanical behaviours of the truss system, the difficulties in designing the truss system and the design of composite floor system is deeply analysed ; the connection design, fire proofing and corrosion protection used in this structure system are briefly introduced

    本論文以一梯兩戶躍層式多層住宅的一種典型平布置為依託,以構思該住宅結構體系設計的方式,對這種桁架體系的受力性能、設計難點和應用於該結構體系的壓型鋼板?組合樓的設計進行了深入分析,對結構採用的連接、墻體和防火防腐措施進行了簡單討論。
  16. Concrete roofing tiles and fittings for roof covering and wall cladding. test methods

    屋頂覆物和墻飾層用瓦及配件.試驗方法
分享友人