蝸管 的英文怎麼說

中文拼音 [guǎn]
蝸管 英文
cochlear canal
  • : 名詞[動物學] (蝸牛) snail
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  1. From the building of the aguascalientes in 1994 to the construction of the caracoles in 2003, the zapatistas begin by acknowledging autonomous communities that rule from below, to establishing good government juntas which rule by obeying the demands of the people

    由一九九四年建立亞古亞斯加利顏提斯到二零零三年居之建設,查巴丁士達們起步于確立各部族建立由下而上理的自治社區至二零零三年建立起一個服從於人民意願為其治楷模的好政府議會。
  2. Canalis spiralis cochlea

  3. When sound waves enter the cochlea, which is really a tube coiled around, they set a membrane into a back and forth motion and cause a new wave

    當聲波進入耳這條盤旋的道,它令薄膜前後移動並且產生新的波動。
  4. Canales longitudinales modioli

    軸縱
  5. Canalis spiralis modioli

    軸螺旋
  6. Certain hair cells lining the cochlear ducts alongside auditory neurons are tuned to respond to specific frequencies

    有些沿耳蝸管排列的毛細胞,緊鄰著聽神經元,經調整后專司特定頻率。
  7. General purpose metallic hose clamps. worm drive type. specifications

    通用金屬的軟卡箍.桿傳動式.規范
  8. Mr buffett wants an independent soul who will make contrarian calls ; china is rumoured already to have chosen a fund manager who clocked up many years at its finance ministry ? guaranteeing his lack of independence

    巴菲特期望僱用敢於與大眾相悖的充滿獨立精神的人;而傳聞說中國已選擇了個居在其財政部多年因而絕對缺乏獨立性的基金理者。
  9. Canalis spiralis cochle

    螺旋
  10. The calculation model of hydro - mechanical transient in existence was deeply studied and the conclusion is that, for kaplan turbine and pelton turbine, neglecting differences of dynamic mater pressure along the turbine spiral case during transient may cause some error in the calculation of pressure rise and speed rise

    本文深入研究分析了軸流式和沖擊式機組過渡過程計算的現有模型,指出現有模型中對殼(進水)部分的處理方法會給這兩種機組的過渡過程計算帶來相對較大的偏差。
  11. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水道研究;殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  12. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水道研究;殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  13. Kolliker ' s membrane

    蝸管網狀膜
  14. The effect of shock wave exposure on cochlea vascular stria micran gium permeability in guinea pig of various age groups and its relationship with hearing thresh old

    沖擊波暴露后不同年齡豚鼠耳微血滲透性的改變及與聽閾的關系
  15. By presenting the simplified flow model, the flow and velocity triangles were analyzed. in the paper, the author excavated the performance, calculated the velocity - pressure and flow loss of the worm shell, the outlet element of the pump

    論文還深入研究了螺旋型離心泵的型擴散的結構和原理,計算了的速度、壓力、流動損失,分析了擴散的增壓原理。
  16. Hose clamps worm drive type for general purpose use with bands or wires

    一般用途的與帶材或線材配用的軟卡箍桿傳動式
  17. There was large interpopulation and intrapopulation variation in shell colour. in general, the distribution of the shell colours was not completely random. populations living in shaded places, characterized as dim and humid, had a high frequency of dark shells, while populations living in sunny and relatively dry, open places had lighter shells

    如此,分析結果表明貝殼顏色的分佈並非完全隨機,遵循一定的分佈規律;在陰暗潮濕的隱蔽環境中生活的牛貝殼顏色深,而在陽光充足,相對乾燥的敞開環境中的牛,卻有淺色貝殼;與此同時,發現貝殼厚度同樣隨環境變化而變異。
分享友人