行規程 的英文怎麼說

中文拼音 [hángguīchéng]
行規程 英文
line disdpline
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 規程 : directive rules; standards; standing order; regulations; dictate; code; rules規程曲線 rule curve
  1. Agendum call card

    行規程卡片
  2. Verification regulation of dc digital amperemeter

    直流數字電流表試檢定
  3. Based on the analysis of mechanism for joint region, the " frame - wall " and " aslope compression stub column " mechanical models and yielding patterns of core zone of the joints are set up. the shear load - carrying formulation for joint core zone is also given in terms of plastic ultimate analysis. and then, the comparisons between the formulas given in this paper and that of chinese design code ( draft ) and nonlinear fem as well are presented

    對節點核心區的抗剪,通過受力機理的分析,建立了鋼「框架剪力墻」加混凝土「斜壓短受力體系及其屈服機制,根據塑性極限分析,給出了節點核心區抗剪承載力計算的迭加公式, 《》公式和非線性有限元近似模擬分析結果進了比較。
  4. Verification regulation of the water flow - gas calorimeter

    水流型氣體熱量計試檢定
  5. Verification regulation of rf capacitive loss standard set

    高頻電容損耗標準試檢定
  6. On the basis of investigations into the progressive yield process and the possible failure modes of rcc gravity dams, the quasi - elasticity design limit state of the ctrtical stability criterion is proposed and the real working state of the dams designed according to the ctriterion is discussed. a check formula using the material strength reducing factor as the safety index and a simplified formula similar to against sliding stability fromula are derived. finally, the corresponding design safety factors are given by using fem calculations with various influence parameters to be taken into account

    本文在研究碾壓混凝土重力壩漸進破壞過和可能失穩方式的基礎上,提出了以準彈性臨界作為穩定臨界準則的設計極限狀態,分析了按該準則設計的大壩的實際工作狀態,導出了以準彈性強度儲備系數為設計安全指標的審查公式以及形式與抗剪斷公式相同的簡化公式,探討了定量計算考慮各種因素影響的相應設計安全系數的合理取值,並與現范方法進了比較
  7. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進參數小、可實現大直徑基巖鉆孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘鉆進特點的基礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可性,並舉出了其應用實例
  8. Verification regulation of capacitance comparator

    電容式測微儀試檢定
  9. Verification regulation for electrolytic conductance meter

    電導儀試檢定
  10. Code for telecommunication function of water conservancy system

    水利系統通信運行規程
  11. There is no relavant content in corbels in steel fiber reinforced concrete regulations of structural design and construction ( cecs38 : 92 ). accordingly the design of steel fiber reinforced corbels does not have any regulations to follow

    國內現的《鋼纖維混凝土結構設計與施工》 ( cecs38 : 92 )也沒有相關的內容,使得鋼筋鋼纖維混凝土牛腿的設計無章可循。
  12. Article 8 the design papers for mine construction projects must comply with the safety rules and technological standards for mining industry and shall, according to regulations of the state, be subject to the approval of the authorities in charge of mining enterprises ; those failing to comply with the safety rules and technological standards for mining industry may not be approved

    第八條礦山建設工的設計文件,必須符合礦山安全業技術范,並按照國家定經管理礦山企業的主管部門批準;不符合礦山安全業技術范的,不得批準。
  13. Code for hydraulic turbine generator

    水輪發電機運行規程
  14. Operating code for overhead transmission line

    架空送電線路運行規程
  15. When the soil - nailing is under operation, contrast between the actual pull force and the value calculated by current regulations is made

    採用在土釘主筋上埋設鋼筋應力計進土釘實際工作狀態下的拉力測試和把實測拉力與現行規程計算得出的結果作對比的研究方法。
  16. Abstract : based on the operation data, the cold start - up and warm start - up curves of a czecho 200 mw steam turbine are worked out according to the operation rules ; the fem calculating models of the temperature field and stress field of the high pressure rotor are established, and the suitable boundary conditions are given ; the temperature field and stress field of the high pressure rotor are calculated and analysized during these two working situation

    文摘:在現場實測數據的基礎上,根據運行規程擬定捷制200mw機組的冷態啟動和溫態啟動曲線;建立高壓轉子溫度場和應力場有限元計算模型,確定相應的邊界條件;計算分析在這兩種工況下高壓轉子的溫度場和熱應力場。
  17. Operation state of power systems are defined and classified to comprise security regulations and dispatcher ' s experience

    為了將安全運行規程和調度員經驗引入概率安全分析,對電力系統運狀態進了定義和劃分。
  18. Operation code of governors and pressure oil supply units for hydraulic turbines

    水輪機調速器及油壓裝置運行規程
  19. Code on operation of wind power plant

    風力發電場運行規程
  20. The standards and specification related can only provide classical design method, most of the assumption do not reflect the actual stress state. the standards don ’ t considerate the effect when end - plate with rib stiffeners, so it is worthy to research the end - plate in beam - column and some advice on design practice is given as well

    我國現行規程關于端板連接承載力的設計計算方法中還沒有考慮端板加勁肋對節點承載力的影響,所以,迫切需要對端板連接進更深入的研究,提出更加合理的設計建議。
分享友人