裂環連接 的英文怎麼說

中文拼音 [lièhuánliánjiē]
裂環連接 英文
split ringjoint
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. The model of the problem is composed of two half spaces with half circular lining inclusion. horizontal surfaces of the half spaces are loaded with undetermined anti - plane force in order to satisfy continuity conditions at linking section, or with some certain forces to appear cracks. a series of fredholm integral equations of the first kind for determining the unknown forces can be set up through continuity conditions that expressed by using of the green " function

    然後將問題的模型視為「契合」問題,即將其剖分為兩個含半圓形襯砌的彈性半空間,分別在其剖分面上加置未知的出平面荷載,並在欲出現紋位置加置出平面反力使之產生紋,下去利用green函數表示出界面續條件,建立決定待解外力系的第一類fredholm積分方程組。
  2. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統的間隙變形、彈性變形、不均勻沉降以及境溫差可導致橫梁縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度縫。
分享友人