裝輪的起重機 的英文怎麼說

中文拼音 [zhuānglúndezhòng]
裝輪的起重機 英文
wheeled crane
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : 4次方是 The fourth power of 2 is direction
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : machineengine
  • 起重機 : crane; derrick; crab; freight elevator; hoist; lifter; cranage; hoister
  • 起重 : jack up起重臂 jib loading boom; cargo boom; erector arm; jibboom; 起重車 carriage hoist; crane ca...
  1. At present, when people select equipment for container storage yards, rubber tyred gantry crane ( rtg ) has become their first selection. and as the " agnate brother " of rtg, rail mounted gantry crane ( rmg ) often neglected by them

    當前,在進行集箱碼頭堆場設備選配時,胎龍門( rtg )已成為人們第一選擇,而作為同族「兄弟」軌道龍門( rmg )往往被人們忽視。
  2. The main shuchural features of the new electric single - girder overhead travelling crane presented in this paper is as follows : using a special gisder section to provide simple production technology and light weight ; dopting hinged connection at one end between main glrders and end carrages instead of the rigid connection at both ends, eliminating the three - point supporting problem with the crane and thus improving the travelling perfomance ; extending crane wheels life contributed to the combination of no - flange crane wheels and horizontal rollers

    提供種生產工藝簡單、自主梁截面,並將單梁主、端梁剛性連接改為端用鉸接連接,解決了在製造和軌道安時因誤差而造成大車運行三條腿現象,提高了運行性能;用可調大車運行水平中心距設計,代替帶大車,提高大車使用壽命。
  3. Earth - moving machinery. lift capacity of pipelayers and wheeled tractors or loaders equipped with side boom

    土方械.有側鋪管式拖拉提升能力
  4. Analyze item by item the position of unintact cycle, the running clearance of unintact cycle, locking - deform, datum dimension regulating, repeatly install, power voltage wave and marking running etc. at the same time, we give the calculating formula to calculating the running marking random error, and use it to calculate the system error of big diameter measure instrument - - datum dimension frame error, gyro - wheel diameter error, error caused by circumstance temperature, error caused by backing distance, angle error, delay error of data collecting circuit, lathe main shaft running error, workpiece install partial error

    對不完整圓位置、不完整圓轉動間隙、鎖緊變形、基準尺調整、復安、電源電壓波動、標記轉動等隨誤差進行了逐項分析,並給出轉動標記隨誤差計算公式。對大直徑測量儀系統誤差?基準尺尺架誤差、滾直徑誤差、環境溫度引誤差、後退距離引誤差、角度誤差、數據採集電路延時誤差、車床主軸回轉誤差、工件安偏心誤差分別進行了計算,最後對誤差進行合成。
  5. Testing earth - moving machinery - method for the evaluation of lift capacity of pipelayers and wheel tractors or loaders equipped with side boom

    運土械試驗.第6部分:側面帶吊桿管道敷設式拖拉升降能力評定方法
  6. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體滑移施工中選擇與布置、施工平面布置、桁架結構拼單元及滑移單元劃分、滑移施工方案及工藝流程、桁架連接、拼運輸、及堆放、滑移軌道布置、滑移滾構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。
  7. It provides sales, marketing, after - sale service and spare parts for liebherr products mainly focusing on hydraulic and wheel excavators, loaders, dozers and mining equipments ; tower cranes, crawler and mobile cranes ; aircraft equipments like landing gear, actuators and air management systems

    公司負責主要產品包括液壓和式挖掘、推土和礦用自卸車;塔式、履帶式和汽車式落架,作動器和空氣調節與管理系統等航空設備等。
  8. Crane ; crane rail wheels with roller bearings, flattening of axle bushes

    .有軸套補償滾子軸承軌道
  9. Cranes ; flanged crane rail wheels, with plain bearings, with gear wheel

    .帶齒有關節軸承有法蘭軌道
  10. Cranes ; flanged crane rail wheels, with roller bearings, without gear wheel

    .不帶齒有滾子軸承有法蘭軌道
  11. Main propulsion equipments have been gradually improved. in addition, some additional systems are provided, such as the power station, deck machinery, refrigeration and air condition plant, freshwater generators, drinking water system, steam generating system, ballast and bilge system, and fire fighting system. the management of ship ' s power plant is also known as the engineering management, which is supervised and controlled by the engine department under the direction of the company ' s engine technology management department of the headquarters. owing to the complexity of power plant, the changeability of navigational conditions, and the seriousness of accident ' s consequences, it is essential to explore how to manage the power plant economically and reduce the occurrence of troubles so as to raise the shipping efficiency

    隨著科學技術發展,不僅推進設備逐步得到完善,而且還增設了諸如船舶電站、械、冷藏和空調置、制淡水置以及飲水、蒸汽、壓縮空氣、壓載、艙底、消防等系統。船舶動力管理即管理,是在船公司務部門指導下由船上部具體負責實施。因為船舶動力復雜性、船舶航行條件多變性、發生事故後果性,所以探討如何對進行經濟性管理,減少故障,從而提高船舶營運效率非常要。
分享友人