裝配式橋梁 的英文怎麼說

中文拼音 [zhuāngpèishìqiáoliáng]
裝配式橋梁 英文
built-up bridge
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
  • 橋梁 : bridge; approach
  1. Sales : imported and domestic natural rubber, butylbenzene rubber, polybutadience rubber, butyronitrile rubber, epdm rubber, butyl rubber, chlorosulfonated polyethylene tyre types superfine, smell - free, butyl, butyronitrile, color and milk natural rubbers, compound rubbers and reclaimed rubbers ; raw and auxiliary materials for rubber chemical such as rubber accelerator, antiager, black, paraffin, octadecoic acid, zinc oxide, magnesium oxide, titanium pigment, coumarone and powder sulfur ; different specifications of epdm color granules, crossover antiskid rubber floor brick, plastic rubber sites, lawn layout, different specifications of antiskid rubber floor brick, rubber blind - people road brick, plant brick, tree guard brick, top adiabatic brick, road rubber reducer brick, special green rubber tyre rubber granule, rubber powder and product, different rubber and plastic pipe, adhesive tape and plate, flexible rubber soft joint, rubber stop tape, bridge extension device, natural rubber plate pedestal, water - expanding rubber, rubber and plastic air duct, pe / pp / pvc water pipe, fulgurite, flame retardant wire gutter, floor wire gutter, mc nylon product, rubber and plastic machinery and fitting relieve, and processing of different ordinary and special rubber and plastic and nylon products

    經營銷售:進口、國產天然膠、丁苯膠、順丁膠、丁腈膠、三元乙丙膠、丁基膠、氯璜化聚乙烯、輪胎類精細、無味、丁基、丁腈、彩色、乳膠類等多種型號天然橡膠、合成橡膠和再生橡膠;硫化促進劑、防老劑、炭黑、石蠟、硬脂酸、氧化鋅、氧化鎂、鈦白粉、古馬龍、工業硫磺粉等各種橡膠化工原輔材料;各種規格epdm彩色顆粒,天防滑橡膠地磚、塑膠場地、人造草坪鋪、各種規格防滑橡膠安全地磚、橡膠盲道磚、植草磚、樹木圍護磚、屋頂隔熱板、道路橡膠減速塊,專用綠色環保型橡膠輪胎膠粒、膠粉及成品,各類橡膠、塑料膠管、膠帶、膠板,可撓曲橡膠軟接頭,橡膠止水帶,伸縮置,天然膠板橡膠支座,遇水膨脹橡膠,橡膠、塑料導風筒, pe pp pvc水管、電管、阻燃線槽,地板線槽、 mc尼龍產品、橡塑機械及件調劑,並承接各種普通、特種橡塑、尼龍產品加工製造。
  2. Deck pavement of built - up bridge may be too thick or thin due to complex reasons, among which a most important one is the design

    摘要裝配式橋梁建造時會出現面鋪厚度過薄或過厚的現象,原因很復雜,但設計是一個重要原因。
  3. Conventional method of designing built - up bridge can only ensure the deck pavement thickness near the ends of beams, without enough regarding of the middle part

    裝配式橋梁的常規設計方法一般只能保證支座附近的面鋪厚度,的中間部分則無法保證。
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊鋼筋骨架入模;拆和液壓兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著振搗為主、插入搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移的施工方法;壓漿、封端、面防水層和保護層施工的一些規定和注意事項等都是對箱製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  5. The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast - in - situ prestressed concrete continuous girders

    研究表明,採用公路鋼桁架解決跨河預應力混凝土連續現澆混凝土施工支架問題是有效的。
  6. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用公路鋼桁架(通常稱為貝雷架)做為支架進行連續現澆箱混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。
  7. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支雙向預應力混凝土t形簡支、鋼筋混凝土剛構連續、鋼與混凝土結合連續跨結構,形成了以預應力簡支箱跨結構為主要特徵的一系列新結構。
  8. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的后張預應力混凝土斜在恆載、溫度變化、混凝土收縮和徐變、活載作用下主的正應力、豎向變形和恆載、活載作用下主的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。