裝配式橋 的英文怎麼說

中文拼音 [zhuāngpèishìqiáo]
裝配式橋 英文
fabricated bridge
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
  1. Sales : imported and domestic natural rubber, butylbenzene rubber, polybutadience rubber, butyronitrile rubber, epdm rubber, butyl rubber, chlorosulfonated polyethylene tyre types superfine, smell - free, butyl, butyronitrile, color and milk natural rubbers, compound rubbers and reclaimed rubbers ; raw and auxiliary materials for rubber chemical such as rubber accelerator, antiager, black, paraffin, octadecoic acid, zinc oxide, magnesium oxide, titanium pigment, coumarone and powder sulfur ; different specifications of epdm color granules, crossover antiskid rubber floor brick, plastic rubber sites, lawn layout, different specifications of antiskid rubber floor brick, rubber blind - people road brick, plant brick, tree guard brick, top adiabatic brick, road rubber reducer brick, special green rubber tyre rubber granule, rubber powder and product, different rubber and plastic pipe, adhesive tape and plate, flexible rubber soft joint, rubber stop tape, bridge extension device, natural rubber plate pedestal, water - expanding rubber, rubber and plastic air duct, pe / pp / pvc water pipe, fulgurite, flame retardant wire gutter, floor wire gutter, mc nylon product, rubber and plastic machinery and fitting relieve, and processing of different ordinary and special rubber and plastic and nylon products

    經營銷售:進口、國產天然膠、丁苯膠、順丁膠、丁腈膠、三元乙丙膠、丁基膠、氯璜化聚乙烯、輪胎類精細、無味、丁基、丁腈、彩色、乳膠類等多種型號天然橡膠、合成橡膠和再生橡膠;硫化促進劑、防老劑、炭黑、石蠟、硬脂酸、氧化鋅、氧化鎂、鈦白粉、古馬龍、工業硫磺粉等各種橡膠化工原輔材料;各種規格epdm彩色顆粒,天防滑橡膠地磚、塑膠場地、人造草坪鋪、各種規格防滑橡膠安全地磚、橡膠盲道磚、植草磚、樹木圍護磚、屋頂隔熱板、道路橡膠減速塊,專用綠色環保型橡膠輪胎膠粒、膠粉及成品,各類橡膠、塑料膠管、膠帶、膠板,可撓曲橡膠軟接頭,橡膠止水帶,梁伸縮置,天然膠板橡膠支座,遇水膨脹橡膠,橡膠、塑料導風筒, pe pp pvc水管、電管、阻燃線槽,地板線槽、 mc尼龍產品、橡塑機械及件調劑,並承接各種普通、特種橡塑、尼龍產品加工製造。
  2. The drills included rescue rubber dinghies moving in formation, a vertical landing by a rescue helicopter, evacuation of victims by amphibious vehicles, saving people in rapid water through the use of rubber dinghies, vertical evacuation of victims, use of a rope - gun, setting up a rope - bridge over a valley or stream, vertical descent from great heights, and a display of advanced earthquake rescue equipment

    演習的項目包括救生橡皮艇水上分列直升機垂降救援水陸兩用車撤離災民橡皮艇急流水中救援垂直地形傷患拖吊拋繩槍救援溪谷單索吊架設高空垂降,及多項先進的地震救援靜態展示。
  3. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用應變片傳感器,應用平穩安技術確保長期穩定運行稱重傳感器提供多種安,可以安于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上面等,與控制儀合使用。
  4. Before studying the concrete composite deck pavement, we introduce the basic theory of touching analysis, and come up with the realization of touching analysis in the fem analysis considering the touch of concrete bridge cover plates, asphaltum concrete overlay with bridge cover etc. connect with the experiment on the spot of bridge, the software ansys is used to solidity modeling and analyzing an assembly simply supported bridge before adding overlap, after adding overlap etc., and study the influence of adding overlap on the underside bridge structures

    在進行混凝土簡支板復合鋪結構的探討性研究前,先介紹了接觸分析基本理論,並提出了考慮混凝土面板板間接觸、瀝青混凝土加鋪層與面接觸等接觸分析在有限元分析中的實現思路。結合一座簡支板現場試驗數據,採用ansys對該在加鋪前後進行了實體建模與計算分析,討論了瀝青混凝土加鋪層對下部結構物的影響。
  5. Deck pavement of built - up bridge may be too thick or thin due to complex reasons, among which a most important one is the design

    摘要裝配式橋梁建造時會出現面鋪厚度過薄或過厚的現象,原因很復雜,但設計是一個重要原因。
  6. Conventional method of designing built - up bridge can only ensure the deck pavement thickness near the ends of beams, without enough regarding of the middle part

    裝配式橋梁的常規設計方法一般只能保證支座附近的面鋪厚度,梁的中間部分則無法保證。
  7. Other equipment : four 20 top ' s bridge cranes, two 10 ton ' s bridge cranes, six 5 top ' s bridge cranes, one 20 top ' s handjack, one 8 top ' s forklift, one wrap packaging machine, two steel coil reversal machines, two screw air compressor machine ( 5m3 )

    主要輔助設備置: 20噸吊車4臺, 10噸吊車2臺, 5噸吊車6臺, 20噸平板車1臺, 8噸叉車1臺,纏繞包機1臺,鋼卷翻轉機2臺,螺桿空壓機( 5立方) 2臺。
  8. The component of product : this production line is mainly composed of charging wagon, single or double support uncoiler, transverse cutting machine, piling device and so on, meanwhile swing type mid - bridge, leveling draught device and deviation rectification device and so on are equipped between each machines

    產品組成:該生產線主要由上料小車,單或雙支撐開卷機,橫向剪切機,堆垛置等組成,同時在各機之間有擺動中間,校平牽引置,糾偏置等。
  9. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊鋼筋骨架入模;拆和液壓兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著振搗為主、插入搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  10. As the largest coal mining machinery manufacturer, the chinacoal zhangjiakou coal mining machinery co., ltd. mainly produces flexible afc and related compatible bridge stage loader, crusher, matilda unit and plough used underground, consisting totally 500 sizes, 82 series and 10 categories

    公司作為我國最大的煤礦專用設備製造企業,主要產品是煤礦井下採煤工作面用可彎曲刮板輸送機及其套的轉載機、破碎機、皮帶機自移機尾、轉載機自移置、刨煤機等,現有產品10大類82個系列約500多個規格。
  11. In this paper, on the basis of reviewing the traditional handling technology in container terminal, the handling technology of existing automatic container terminal is introduced : automated ohbc crane 、 agv - rmg 、 drmg - crmg relay

    摘要在回顧集箱碼頭的傳統卸工藝的基礎上,介紹了現有集箱自動化碼頭的卸工藝:行架自動化場與軌道龍門吊合;自動搬運車( agv )與軌道龍門吊合;高型軌道吊( drmg )和矮型軌道吊( crmg )接力
  12. The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast - in - situ prestressed concrete continuous girders

    研究表明,採用公路鋼桁架解決跨河預應力混凝土連續梁現澆混凝土施工支架問題是有效的。
  13. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用公路鋼桁架(通常稱為貝雷架)做為支架進行連續梁現澆箱梁混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。
  14. 4. this thesis introduces the application of rd - 1005 mrfd in hunan yueyang dongting lake bridge and permanent magnetism adjustable assemblage mrfd in changsha hongshan bridge and changsha liuyang river bridge. the studies on cable vibration mitigation field tests in these bridges are presented

    4 .介紹了湖南嶽陽洞庭湖大上安磁流變阻尼器的情況,在長沙洪山大、長沙瀏陽河大拉索上安了永磁調節磁流變阻尼器,並進行了現場拉索減振試驗研究。
  15. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支梁、雙向預應力混凝土t形簡支梁、鋼筋混凝土剛構連續梁、鋼與混凝土結合連續梁等跨結構,形成了以預應力簡支箱梁跨結構為主要特徵的一系列梁新結構。
  16. The component of product : this production line is mainly composed of charging and discharge wagon, single or double support uncoiler and coiler, slitting machine ( or deburring machine ), slitter edge takein machine and so on, meanwhile swing type mid - bridge, draught device and deviation rectiocation device and so on are equipped between each machines

    產品組成:該生產線主要由上、下料小車,單或雙支撐開、收卷機、縱剪機(或修邊機) 、廢邊收料機等組成,同時在各機之間有擺動中間,牽引置,糾偏置等。
  17. To plant steel rods in the assemble type concrete slab bridge deck and execute transverse pre - stresses not only can strengthen links between the assemble type concrete slabs and the bridge deck, but also can strengthen the transverse entirety of the whole bridge structures, and intensify the resistance of the bridge to active loads, vibrations and abrasions

    摘要通過在混凝土板板頂植筋並對面施加橫向預應力,不但可以加強板與面鋪層的連接,而且還可以加強整體結構的橫向整體性,增強結構對動載沖擊、震動、磨耗抵抗能力。
  18. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的后張預應力混凝土斜梁在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。
  19. Assemble design is very important as a part of bridge crane design. as a visual reality technology applied in design and manufactual field, visual assemble technology has been gained quiet great development. some visual assemble system has been applied in industry. the research in this paper is combining vr and cad technology, to develop a special design system for bridge crane. in the study, we choose a advanced 3 - d cad software - solidworks to modeling the crane, and use an object oriented computer language - visual basic for secondary development of solidworks by its api function and ole interface. in this paper, it will introduce the crane ’ s automatic assembly and collision detection function of design system. the system program is written in visual basic and hanged to solidworks flat roof. so, it seems solidworks runs its own function when we run the program

    本文的研究工作將虛擬現實技術與三維cad技術相結合,研究起重機的虛擬自動中的干涉檢查。在此研究中,作者選用先進的三維cad軟體平臺- solidworks ,進行起重機的建模;並運用面向對象的設計語言- visualbasic ,利用solidworks的api函數和ole介面對其進行二次開發,開發出起重機小車的創新虛擬設計和干涉檢查系統。此設計系統是通過vb編程,在solidworks軟體平臺上外掛系統程序,程序的運行就如同solidworks調用自身功能一樣,來實現設計功能。
  20. In this paper improved genetic algorithm is combined with computation of buckle - cable adjusted. and the genetic optimization model based on real number encoding is introduced. in the established model, rank - based fitness assignment selection and dynamic penalty strategy are introduced to handling restriction problems

    本文針對大跨度鋼管拱合理成狀態的確定和扣索索長調整問題,將改進的遺傳演算法嵌入到拱肋吊的結構計算中,採用實數編碼技術,引入了基於排序的適應度分選擇方,將動態罰函數法應用於處理有約束的最優化問題。
分享友人